# Foster Spillway Gate Nut Replacement and Re-Tensioning

Canonical: https://sealedbidder.com/opportunities/pannwd26p0000033137

- Solicitation number: PANNWD-26-P-0000033137
- Notice type: Sources sought
- Status: Closed. Deadline was September 1, 2026 at 6:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W071 Endist Portland (W9127N)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Z2KA Repair Or Alteration Of Dams
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237990)
- Place of performance: Albany, Oregon
- City: Albany. https://sealedbidder.com/cities/albany-or-4101000
- First posted: August 17, 2026
- Last posted: August 24, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/69362607098c4e5dbc6b91ae7872ac9e/view

## Reading this notice

- Kind of notice: Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates.
- What comes next: No solicitation has been published under this number yet. The sources sought of August 17, 2026 is the earliest notice of the purchase.

## Description

Replace quantity 192 custom made[S(1]  castle nuts approximately two inch outside diameter by two inch long made from A564 UNS 17400 Type 630 Condition H1100 material (more commonly known as 17-4). Replace quantity 48 custom made U-bolts from 1-1/8-inch diameter rod bent to eighteen inches long with a six-inch radius made from A564 UNS 17400 Type 630 Condition H1100 material. Replace quantity eight custom U-bolt spacers approximately six inch outside diameter by twelve inch long made from self-lubricated composite material. Replace quantity eight gate connection pins approximately four-inch diameter by sixteen inch long made from A564 UNS 17400 Type 630 Condition H1100 material. Supply quantity one custom made installation tool approximately two inch outside diameter by ten inches long made from A564 UNS 17400 Type 630 Condition H1100 material for the custom castle nuts.

After replacement of the gate connection components, the wire ropes of each gate will be tensioned to equal amounts from one side of the gate to the other so that the gate does not rub side walls under vertical travel and the gate contacts the spillway ogee evenly from one side to the other. The contractor will be responsible for the release and re-tensioning of wire ropes in the preparation and finishing of work activities.

Anticipated Construction Schedule: USACE Portland District intends to advertise in November 2026 and award in December 2026. The contractor will use its discretion to select the appropriate work period given the restrictions relayed and present a proposed work schedule to USACE for approval.

Estimated Construction Cost (ECC): The current ECC is between $1,000,000 and $5,000,000.

Number and Type of Contracts: NWP contemplates awarding one (1), Firm Fixed-Price contract. The acquisition strategy decision has not yet been determined. Maximum Small business participation is being sought at both the Prime and subcontracting levels.

Anticipated Source Selection Process: The expected method to determine the best value to the government is Invitation for Bid.

Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 2 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract.

## Open now in the same industry

143 open in NAICS 237990.

- JOHN DAY DAM UNIT 10 PACKING BOX REPLACEMENT (W9127N27BA011), due December 4, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/w9127n27ba011
- Bonneville Powerhouse II Unwatering Pump Replacement (W9127N27BA012), due December 7, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/w9127n27ba012
- W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning (W9127N27BA005), due December 16, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/w9127n27ba005

## Publications

- August 17, 2026: Sources sought, due September 1, 2026 at 6:00 PM EDT. Notice 2f95c5ad40ac4e53a55377a5d4fd072e. https://sam.gov/workspace/contract/opp/2f95c5ad40ac4e53a55377a5d4fd072e/view
- August 24, 2026: Sources sought, due September 1, 2026 at 6:00 PM EDT. Notice 69362607098c4e5dbc6b91ae7872ac9e. https://sam.gov/workspace/contract/opp/69362607098c4e5dbc6b91ae7872ac9e/view

## Points of contact

- Chris Burroughs, christopher.d.burroughs@usace.army.mil
- Justin F Figueredo, justin.f.figueredo@usace.army.mil, 5038084628

---