# Crane Lift Service BPA (Amendment)

Canonical: https://sealedbidder.com/opportunities/panmcc25p0000027693

- Solicitation number: PANMCC-25-P-0000027693
- Notice type: Combined synopsis and solicitation (first published as sources sought)
- Status: Closed. Deadline was September 12, 2025 at 4:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W6QM MICC Fdo FT Bragg (W91247)
- NAICS: 238990 All Other Specialty Trade Contractors
- Product or service code: W036 Lease or Rental of Equipment: Special Industry Machinery
- Set-aside: Total small business set-aside
- Small business size standard: $19 million in average annual receipts (13 CFR 121.201, NAICS 238990)
- Place of performance: Fort Bragg, North Carolina
- County: Cumberland County (FIPS 37051). https://sealedbidder.com/counties/cumberland-county-nc-37051
- First posted: July 22, 2025
- Last posted: September 3, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/8718dcf146e5477ca440d67d7b7aaede/view

## Reading this notice

- Kind of notice: Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 238990 (all other specialty trade contractors), means no more than $19 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 35 days from the day the solicitation was posted, August 8, 2025, to the deadline. The deadline moved 3 times: it was first August 1, 2025 and ended as September 12, 2025.
- Before the solicitation: The agency published a sources sought on July 22, 2025, 17 days before the solicitation.

## Description

Description of Services/Introduction: The Contractor is required to provide requested lift

services of picking up a load with weights between 1000 pounds and 65 tons to a height

between 1 to 12 feet. There are four basic missions requiring crane-assisted lifting of military

vehicles, equipment, or rigged-for-airdrop loads. The Contractor will position the load for

rigging, deposit the load on transportation, hold the load suspended for a Simulated Airdrop

Impact Test (SAIT), or lift the load for recovery of loads or equipment from a Drop Zone.

Question and Answer:

1. We would like to know if this is a brand-new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number?

Previous Contract: W91247-20-A-0010

2. Could you please confirm the required distance from the crane to the lift points for these pieces?

Assuming SAIT, we can position the load as close as the crane operator feels is necessary/safe. The crane is not expected to &ldquo;reach&rdquo; over to the load for the static test (SAIT). Once in position with outriggers deployed, we can drive the load in close to the crane for optimal lift distance as directed by the operator. It is our experience that the usual min distance from the crane or other structure/obstacles is 5&rsquo; in all directions.

3. It is a major concern that &ldquo;Quick Release&rdquo; drops at these magnitudes cannot be safely performed with a crane due to the risk of &ldquo;shock loading,&rdquo; which could potentially cause the crane to overturn or fail or break. It is my understanding that a fixed system would be required to safely accomplish this. Could you confirm if my understanding is correct, and let me know if there&rsquo;s anything I may be missing, misunderstanding, or misinterpreting?

You are correct. When the loads get heavy, only the largest mobile cranes (120T or 240T +) have been used. We rarely do loads exceeding 40,000 lbs (20T), most loads are lower, but we do expect the future we&rsquo;ll see at least one test pushing to 42,000-44,000 loads. USAF limitation today is 42,000 lbs.

When we did the last heavy test, the rigged weight was around 38,800 lbs. it took the vendor (Superior) four trucks with ballast/counterweights to set up the monster 240T crane for the test SAIT. It went off without any problems.

## Attachments

- [ATEC Crane Lift Service BPA Combined Synopsis Solicitation 20250808.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7f824275ec6b4b4d9235443738f68358/download)
- [Performance Work Statement -Crane Lift Service FY25 Updated_Redacted.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/07c562640f8542d5ac233622875e4ac8/download)
- [Performance Work Statement -Crane Lift Service FY25 Updated_Redacted.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/20be1d6aa8794dd2850731a454b5103a/download)

## Open now in the same industry

20 open in NAICS 238990.

- Sources sought GATR grounding (2027TYNDALLGATR15), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/2027tyndallgatr15
- Investigation, Repairs, and Removal and Disposal of Marine Attachments to Raw Water Intake (N40085-27-NORFP-GREAT-LAKES-ROICC-5395), due November 30, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/n4008527norfpgreatlakesroicc5395
- Door Repair IDPO; Defense Supply Center Richmond(DSCR) (SP470327Q0004), due December 3, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/sp470327q0004

## Publications

- July 22, 2025: Sources sought, due August 1, 2025 at 12:00 PM EDT. Notice a46963c3891d4a1787e02e401959ef98. https://sam.gov/workspace/contract/opp/a46963c3891d4a1787e02e401959ef98/view
- August 8, 2025: Combined synopsis and solicitation, due August 25, 2025 at 4:00 AM EDT. Notice a0665c87f45044deb600c6655c795d2b. https://sam.gov/workspace/contract/opp/a0665c87f45044deb600c6655c795d2b/view
- August 19, 2025: Combined synopsis and solicitation, due August 25, 2025 at 4:00 AM EDT. Notice 5a3035f3b45e4164ac8d705f7fca3698. https://sam.gov/workspace/contract/opp/5a3035f3b45e4164ac8d705f7fca3698/view
- August 25, 2025: Combined synopsis and solicitation, due August 25, 2025 at 4:00 AM EDT. Notice 36c6d8fe82ad44829fce757875712f19. https://sam.gov/workspace/contract/opp/36c6d8fe82ad44829fce757875712f19/view
- August 25, 2025: Combined synopsis and solicitation, due September 2, 2025 at 4:00 PM EDT. Notice 5ed415f698f44237bb55742076be0eb8. https://sam.gov/workspace/contract/opp/5ed415f698f44237bb55742076be0eb8/view
- September 3, 2025: Combined synopsis and solicitation, due September 12, 2025 at 4:00 PM EDT. Notice 8718dcf146e5477ca440d67d7b7aaede. https://sam.gov/workspace/contract/opp/8718dcf146e5477ca440d67d7b7aaede/view

## Points of contact

- Brandon Mourier, brandon.r.mourier.mil@army.mil
- MAJ Luis Mejias, luis.d.mejias2.mil@army.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/panmcc25p0000027693.
