Special notice
FCRPS FY25 CTUIR Site Condition Monitoring
PAN25004603
Department of the Army, W071 Endist Portland. Research and Development in the Social Sciences and Humanities.
Response deadline
April 7, 2025 at 1:00 PM EDT
Closed 597 days ago. Posted March 20, 2025. Scheduled to archive April 22, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
5 like it are open now in research and development in the social sciences and humanities
- DOL research study on unfair labor practices
Department of State, U.S. Embassy Bogota
SolicitationNAICS 541720Outside the US19C02027Q0008Closes in 15 daysDec 10 - A Study on Vessel Design Challenge
Maritime Administration, 693JF7 DOT Maritime Administration
SolicitationNAICS 541720Location not published693JF726R000016Closes in 46 daysJan 10, 2027 - Research and Studies for the Office of Net Assessment
Washington Headquarters Services (Whs), Washington Headquarters Services
SolicitationNAICS 541720Not tied to one placeHQ0034-ONA-23-BAA-0001Closes in 566 daysJun 13, 2028
All 5 open in research and development in the social sciences and humanities
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
This is a special notice prepared in accordance with Federal Acquisition Regulation (FAR) Subpart 5.2 “Synopses of Proposed Contract Actions.”
The U.S. Army Corps of Engineers Portland District intends to negotiate a sole source award, pursuant to 10 U.S.C. § 2304(c)(1) as implemented by Federal Acquisition Regulation (FAR) 13.106-1(b) only one responsible source and no other vendor will satisfy agency requirements, to the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) for to monitor properties, including historic properties of religious and cultural significance to Indian tribes, that can assist in the development of long-term cultural resource management decisions. The following actions provide background and context in which the Corps makes decisions:
- Observation, documentation, and reporting on the physical dynamics involved in the erosional or depositional processes occurring at monitored sites.
- Recording site conditions in an effort to provide information from which future changes such as sediment loss, topographic change, vegetation change, human and animal use impacts, soil disturbance, and vandalism can be quantitatively determined.
- Monitoring for looting, vandalism, and burial desecration at designated sites and ensuring the notification of proper authorities.
- Accurate documentation of the variation and diversity of potential impacts and causal factors at the site.
- Providing recommendations for treatment of monitored sites including recommendations regarding future monitoring frequency.
Background: The U.S. Army Corps of Engineers, Portland District (Corps) and Bonneville Power Administration (BPA), referred to as “the Agencies” hereinafter, are jointly responsible for compliance with Sections 106 and 110 of the National Historic Preservation Act (NHPA) under the terms of the 2009 System wide Programmatic Agreement (SWPA) for management of Historic Properties affected by operation and maintenance of the Federal Columbia River Power System (FCRPS). The study area for this procurement includes federal land managed by the Corps located within the John Day Project on the Oregon and Washington side of the Columbia River. This area is within the ceded territory of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR).
Justification: The study area includes federal land managed by the Corps located within the John Day Project on the Oregon and Washington side of the Columbia River. This area is within the ceded territory of the CTUIR. The CTUIR possesses unique knowledge of Umatilla Indian ancestral village sites, prehistoric burial areas, and areas of traditional cultural properties and resources that exist within and overlap the known boundaries of the subject historic properties in the APE. Not all of this information is made public knowledge.
Impact: Failure to utilize the CTUIR’s knowledge of known archeological sites and resources within the APE would delay the Corps in being able to make required long term management strategies for the area and impact compliance with Sections and 110 of the National Historic Preservation Act under the terms of the 2009 Systemwide Programmatic Agreement for management of Historic Properties affected by operation and maintenance of the FCRPS. Furthermore, Government relations with the CTUIR would be negatively impacted.
Alternatives: There are no known alternatives for these services that possess the knowledge of the CTUIR tribal history or could speak on the CTUIR’s behalf.
A SOLICITATION WILL NOT BE POSTED. THIS NOTICE IS NOT A REQUEST FOR COMPETITIVE PROPOSALS OR QUOTATIONS.
All responsible sources may submit a capability statement to the contracting officer before the notice end date. If no affirmative written responses are received by 10:00 AM Pacific time on 07 April 2025, the Contracting Officer will proceed with the sole source action. Oral communications are not acceptable in response to this notice. A determination by the Government not to compete this proposed requirement is solely within the discretion of the Government. Electronic responses and questions shall be submitted via email to BOTH POCs listed, below. The U.S. Army Corps of Engineers is not responsible for any costs incurred by responding to this notice.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 20, 2025
Special notice
Due April 7, 2025 at 1:00 PM EDT. SAM.gov, notice c753df8e81d14de7822a7d675a4f93f3
1 revision on SAM
- March 20, 2025: publish, special notice
Points of contact
- David Cookdavid.m.cook@usace.army.mil
- Justin FigueredoJustin.F.Figueredo@usace.army.mil