Solicitation
JBPHH CAR WASH FABRIC TENSION STRUCTURE
NAVMWR-26-R-0013
Department of the Navy, Commander Navy Installations CMD. Commercial and Institutional Building Construction.
Response deadline
November 14, 2026 at 4:00 PM EST
Closed 13 days ago. Posted November 13, 2026. Scheduled to archive November 14, 2026.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed 13 days ago
191 like it are open now in commercial and institutional building construction
- Ford Island Hawaii Roll Up Door
Department of the Navy, Naval Undersea Warfare Center
Sources soughtNAICS 236220Urban Honolulu, HIFord_Island_Hawaii_Roll_Up_DoorDue in 4 daysDec 1 - FY29 PN108808 Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center on Oahu, Hawaii
Department of the Army, W2SN Endist Honolulu
SolicitationNAICS 236220HawaiiW9128A27RWP01Closes in 8 daysDec 5 - Munitions Maintenance and Inspection Facility and Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HI
Department of the Army, W7M4 Uspfo Activity Hiang 154
SolicitationSmall businessNAICS 236220HawaiiW50SLF26RA005Closes in 11 daysDec 8
All 191 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 1 day from the day the solicitation was posted, November 13, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The project involves the repair and upgrade of the car wash area, including the installation of fabric tension shade structures over the auto detailing area, existing vending machines, pay stations at both entrances to the car wash, and the water reclamation and oil-water separator systems. The surrounding area around building B75065H will be repaved, with careful attention given to a historic train track located on the site. The repaving will be carried out without obstructing the track, ensuring it remains exposed and at its original elevation. The work will also feature striping, directional arrows, STOP markings, and one-way asphalt painting to enhance traffic flow and safety throughout the area.
ONLY DESIGN WILL BE AWARDED UNTIL ENVIRONMENTAL APPROVALS ARE RECIEVED.
DESIGN:
Shading Structure:
a. The design will include three options focused on optimizing traffic flow around the carwash to prevent congestion and enhance accessibility. Additionally, the steel framework and fabric cover will be engineered to meet Hawaii’s storm and wind load requirements, including design wind speeds up to 145 mph and compliance with impact resistance standards for windborne debris. Safety factors for structural stability, drainage, and flood resistance will also be incorporated. Final ratings and requirements will be confirmed during the design phase in coordination with local authorities and engineers to ensure compliance and durability.
b. A custom design of the steel framework and fabric cover shall be developed to ensure durability, aesthetic appeal, while also providing the storm rating of the product. The structural design shall be engineered to accommodate the required load, as well as to withstand wind and weather conditions, ensuring long-term performance and stability.
c. The contractor shall provide a warranty for the structure and tension fabric, ensuring protection against defects such as corrosion or structural failure. The entire structure, including the fabric membrane, shall be warranted for a minimum service life of 10 years.
Covering issues like UV degradation or tearing. The tensioning system, including cables and fittings, shall be covered for 10 years against failure. Regular maintenance, including cleaning and inspections, shall be required to maintain the warranty, and exclusions shall apply for damage caused by extreme weather, misuse, or neglect.
Paving & Traffic markings and Signage:
a. The Offeror shall provide all design and construction services necessary to mill down three inches of the existing pavement and repave approximately 52,000 sq ft around the car wash building B75065H (J-3 (P0-1)). It is important to note that no digging permit will be issued for this project, so all work must be limited to milling and repaving without any subsurface excavation.
b. The Contractor shall ensure the finished service drive allows for positive drainage away from the structures on site.
c. The Contractor shall coordinate with the POC and the Local Fire Department for all flame producing / burning activities required by this SOW and shall pay for and procure all required permits prior to construction.
d. The Contractor shall provide a warranty on all material and labor for a period of one year (longer if standard for materials/equipment) from the date of acceptance by the POC. The contractor will utilize industry-standard paving equipment, including cold planers for milling, asphalt pavers for laying new pavement, and rollers for compaction, ensuring all
equipment meets manufacturer specifications to support the quality and durability of the work under warranty.
e. The contractor shall include in the design all necessary drawings that reflect lane striping, directional arrows, STOP markings, and one-way asphalt painting details. This includes clearly marking traffic lanes with the appropriate solid and dashed lines and placing arrows to indicate the correct direction of traffic flow.
CONSTRUCTION:
Shading Structure:
a. The shading structure needs to be installed in the following areas (Attached RFP Section J-3 shading and paving Reference Map)
b. Cover the oil-water separator tank. The size of the shading structure is approximately 35x25 ft. Please follow the designated placement as shown in J-3 (S1-Pic 1).
c. The vending machine cover area is approximately 10x15 ft. Please refer to picture J-3 (S2-Pic 2) for reference.
d. Cover the detailing area, approximately 100ft x 50ft, above the vacuum machines, with a 10ft distance from the main street as the starting reference. J-3 (S3-Pic 3).
e. Cover the two pay stations in front of the two entrances to the car wash. The shading structure should be a standalone unit, approximately 12ft x 9ft. Please refer to the reference map J-3 (S4-Pic 4).
f. Fabric Overlay and Tensioning: Installing the fabric over the steel frame and securing it. Heavy-duty fabric material (PTFE or PVC-coated polyester) designed for outdoor exposure, UV resistance.
The contractor shall ensure that the structure is firmly anchored to a foundation,
utilizing materials as required by the site conditions, selecting the appropriate foundation
material based on the specific requirements of the project site.
2. Paving:
a. The contractor shall mill the existing pavement to a depth of 3 inches below the finished grade to accommodate the installation of a new 3-inch-thick bituminous concrete surface (Hot-Mix Asphalt Surface Course) over the full extent of the service drive. The new
surface shall be feathered or smoothly abutted to the existing road.
b. The train track is historic. It is imperative that the paving work performed under this contract shall not cover or obstruct the train track. The Contractor shall grind the existing asphalt below the level of the track, ensuring the track is not covered by the paving, thereby maintaining its historical integrity in accordance with applicable preservation standards.
c. The Contractor shall ensure all debris from any required pavement milling and/or scarification, be disposed of off-site at an approved facility.
3. Traffic markings and signage:
a. The contractor shall include any necessary signage, such as striping, arrows, STOP markings, and one-way asphalt painting details.
b. The Contractor shall install liquid thermoplastic paint permanent pavement markings, matching the original configuration and colors for Hickam car Wash, including but not limited to, fire lane delineations and car lanes.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- NAVMWR-26-R-0013 JBPHH CAR WASH FABRIC STRUCTURE.pdf11.4 MB, November 13, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 13, 2026
Solicitation
Due November 14, 2026 at 4:00 PM EST. SAM.gov, notice 035fa45c9ea746bdb61cecc7fb7231d9
1 revision on SAM
- November 13, 2026: publish, solicitation
Points of contact
- Nika Maldonado, Contracting Officernika.n.maldonado.naf@us.navy.mil9019307728