Combined synopsis and solicitation, total small business set-aside, first published as special notice
Air Compressor
N6660425Q0140
Department of the Navy, NUWC Div Newport. Air and Gas Compressor Manufacturing.
Response deadline
July 3, 2025 at 2:00 PM EDT
Closed 511 days ago. Posted June 27, 2025, first published June 5, 2025. Scheduled to archive July 18, 2025.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2025
26 like it are open now in air and gas compressor manufacturing
- COMPRESSOR UNIT
Department of the Army, W6QK ACC-RSA
SolicitationNAICS 333912Ship to Fort Bliss, TXW31P4Q27RA010Due todayNov 26 - PARTS KIT,COMPRESSOR
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 333912Ship to the buyerSPE7M127U1196Due in 2 daysNov 27 - RING,PISTON
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationHUBZoneNAICS 333912Ship to the buyerSPE7LX27U0910Due in 2 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 333912 (air and gas compressor manufacturing), means no more than 1,000 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 28 days from the day the solicitation was posted, June 5, 2025, to the deadline. The deadline moved once: it was first June 16, 2025 and ended as July 3, 2025.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Please see attached documentation for all details about this opportunity.
AMENDMENT 0001- June 9, 2025
This solicitation is amended to correct a typographical error on the solicitation and to answer questions from Industry.
1. In the RFQ, page 2, where the labor matrix referred to the "full five (5) years" the document is corrected to read "full three (3) years". The amended document N6660425Q0140-0001 is added to this notice.
2. The specification document is corrected to remove the words "oil free".
3. The Site Visit document is revised to correct the contact email address for the Visit Control Center to: nuwc_npt_access_control@navy.mil
4. QUESTION:
On the Combined Synopsis and Solicitation document, there is a request for a labor matrix. Is the matrix shown the preferred style?
ANSWER: The offeror may propose additional labor categories as required to perform the SOW tasking. Total labor hours for the year shall not exceed 40 hours.
5. QUESTION:
The request on this document is for 5 years, but the SOW is for 3 years after the1 year warranty period. Presuming we are servicing during the first year of operation also, I see that as 4 years total. Am I reading one of the documents incorrectly?
ANSWER: RFQ document updated to three (years), per Answer 1 above. Warranty under CLIN 0001, for year one (1), shall include annual preventive maintenance services.
6. QUESTION: The bid asks for maintenance costs for three years. Maintenance on Sullair air compressors is based on hours of operation. Do you know how many hours per year the compressor operates? One shift (8 hours/day), two shifts (16 hours per day ), three shifts (24 hours per day) or 24/7. A single shift is approximately 2,000 hours. Need to know this to quote maintenance costs.
ANSWER: 16 hours/day.
7. QUESTION: The performance 240 cfm is the performance of a lubricated air compressor not an oil free compressor. An oil free 50 hp air compressor only delivers about 216 cfm. Please confirm if want an Oil Free air compressor.
ANSWER: A lubricated air compressor is acceptable. Oil carryover is unavoidable for lubricated air compressors. The requirement for oil free air is that the discharge from the proposed ‘system’ (compressor, dryer and filter) achieve ISO 8573-1 Air Quality 2.4.2 as the current system provides. The Specifications document has been updated, per Answer 2 above.
AMENDMENT 0002- June 16, 2025
Amended to incluse questions and answers from Industry.
1. QUESTION: Compressor discharge to be 1.5" type L copper tubing using existing Kaeser discharge line to the 2" copper header. New union and isolation valve will be installed.
ANSWER: Yes.
2. QUESTION: Voltage of compressor is 460/3/60. Dryer voltage is 230/1/60
ANSWER: Yes.
3. QUESTION: New dryer to include a 1.0u (micron) prefilter and a .01u (micron) afterfilter
ANSWER: Yes.
4. QUESTION: Access to building is thru the ground height overhead door on the side of the building.
ANSWER: Yes.
5. QUESTION: Aisleways to be free and clear of obstructions when we arrive to place compressor.
ANSWER: Yes.
6. QUESTION: Use of NUWC Newport fork truck to move the compressor from the overhead door area to the compressor room is allowed.
ANSWER: Operated by NUWC personnel, otherwise Contractor must provide their own.
7. QUESTION: New dryer bypass and piping to include Gardner Denver discharge will be 2" copper tubing type L.
ANSWER: Yes.
8. QUESTION: Maintenance costs are based on 4,000 hours of operation annually.
ANSWER: Yes.
AMENDMENT 0003 - June 27 2025
The solicitation was amended to offer clarification on the CLIN structure and quote format requirement. As a result of this modification the response time has been extended through July 3, 2025.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- N6660425Q0140.pdf340 KB, June 5, 2025
- Special Notice Compressor.pdf253 KB, May 22, 2025
- Compressor Specifications.pdf415 KB, May 22, 2025
- N6660425Q0140 Attachment 1 SOW.pdf595 KB, June 5, 2025
- Compressor Layout Model.pdf348 KB, May 22, 2025
- N6660425Q0140 Attachment 2 CDRLs.pdf687 KB, June 5, 2025
- N6660425Q0140 Attachment 3 Site Visis Instructions.pdf490 KB, June 5, 2025
- Statement of Work Compressor DRAFT.pdf615 KB, May 22, 2025
- N6660425Q0140 Attachment 4 Compressor Specifications.pdf429 KB, June 5, 2025
- Site Visit Instructions.pdf490 KB, May 22, 2025
- N6660425Q0140 Attachment 5 Compressor Layout Model.pdf348 KB, June 5, 2025
- N6660425Q0140 Attachment 6 Compressor Pictures.pdf1.2 MB, June 5, 2025
- II.D. N6660425Q0140 Attachment 3-0001 Site Visit Instructions.pdf514 KB, June 12, 2025
- N6660425Q0140-0001.pdf340 KB, June 11, 2025
- II.D. N6660425Q0140 Attachment 4-0001 Compressor Specifications.pdf430 KB, June 12, 2025
- N6660424Q0140-0003.pdf356 KB, June 27, 2025
- II.D. N6660425Q0140 Attachment 1-0003.pdf595 KB, June 27, 2025
- II.D. N6660425Q0140 Attachment 2-0003.pdf687 KB, June 27, 2025
- II.D. N6660425Q0140 Attachment 3-0003 Compressor Specifications.pdf430 KB, June 27, 2025
- II.D. N6660425Q0140 Attachment 4-0003.pdf348 KB, June 27, 2025
- II.D. N6660425Q0140 Attachment 5-0003.pdf1.2 MB, June 27, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 5, 2025
Special notice
Due June 4, 2025 at 2:00 PM EDT. SAM.gov, notice 2672fd05c67d405ebc056595a3f9bc96
4 revisions on SAM
- June 5, 2025: publish, special notice
- June 5, 2025: publish, combined synopsis and solicitation
- June 2, 2025: publish, special notice
- May 22, 2025: publish, special notice
June 5, 2025
Combined synopsis and solicitation, originally special notice
Due June 16, 2025 at 2:00 PM EDT. SAM.gov, notice e515e387844f49959177d74f8b27d2b7
7 revisions on SAM
- June 27, 2025: publish, combined synopsis and solicitation
- June 27, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, special notice
- June 16, 2025: publish, combined synopsis and solicitation
- June 12, 2025: publish, combined synopsis and solicitation
- June 11, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, combined synopsis and solicitation
June 11, 2025
Combined synopsis and solicitation
Due June 16, 2025 at 2:00 PM EDT. SAM.gov, notice 3d9aadd16ce549bbab56830b28a2d5ea
7 revisions on SAM
- June 27, 2025: publish, combined synopsis and solicitation
- June 27, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, special notice
- June 16, 2025: publish, combined synopsis and solicitation
- June 12, 2025: publish, combined synopsis and solicitation
- June 11, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, combined synopsis and solicitation
June 12, 2025
Combined synopsis and solicitation
Due June 16, 2025 at 2:00 PM EDT. SAM.gov, notice e30c173c2ccd450eb5e9bbd7f456067e
7 revisions on SAM
- June 27, 2025: publish, combined synopsis and solicitation
- June 27, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, special notice
- June 16, 2025: publish, combined synopsis and solicitation
- June 12, 2025: publish, combined synopsis and solicitation
- June 11, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, combined synopsis and solicitation
June 16, 2025
Combined synopsis and solicitation
Due June 16, 2025 at 2:00 PM EDT. SAM.gov, notice 927358eff4094715bd776a3016d201e9
7 revisions on SAM
- June 27, 2025: publish, combined synopsis and solicitation
- June 27, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, special notice
- June 16, 2025: publish, combined synopsis and solicitation
- June 12, 2025: publish, combined synopsis and solicitation
- June 11, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, combined synopsis and solicitation
June 27, 2025
Combined synopsis and solicitation
Due July 3, 2025 at 2:00 PM EDT. SAM.gov, notice 55644de33f6b4171868c1e4ca2beed97
7 revisions on SAM
- June 27, 2025: publish, combined synopsis and solicitation
- June 27, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, special notice
- June 16, 2025: publish, combined synopsis and solicitation
- June 12, 2025: publish, combined synopsis and solicitation
- June 11, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, combined synopsis and solicitation
June 27, 2025
Combined synopsis and solicitation
Due July 3, 2025 at 2:00 PM EDT. SAM.gov, notice 9fff319c05254d469515430e3fee8ef2
7 revisions on SAM
- June 27, 2025: publish, combined synopsis and solicitation
- June 27, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, special notice
- June 16, 2025: publish, combined synopsis and solicitation
- June 12, 2025: publish, combined synopsis and solicitation
- June 11, 2025: publish, combined synopsis and solicitation
- June 5, 2025: publish, combined synopsis and solicitation
Points of contact
- Maria Diaz-Sotomayormaria.d.diaz-sotomayor.civ@us.navy.mil4018322028