# FY21 MCON PROJECT P-649 GUAM JOINT COMMUNICATIONS UPGRADE MARINE CORPS BASE CAMP BLAZ, GUAM

Canonical: https://sealedbidder.com/opportunities/n6274225r1319

- Solicitation number: N6274225R1319
- Notice type: Award notice (first published as solicitation)
- Status: Awarded to Core Tech-Hdcc-Kajima LLC for $357,006,788.59
- Department: Department of the Navy
- Agency: Department of the Navy
- Contracting office: Navfacsyscom Pacific (N62742)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Y1BG Construction Of Electronic And Communications Facilities
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- Place of performance: Guam
- County: Guam (FIPS 66010). https://sealedbidder.com/counties/guam-gu-66010
- First posted: October 18, 2024
- Last posted: September 22, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/9cfe291d3d2d45d4a5759223933e7007/view

## Reading this notice

- Kind of notice: Award notice. Who won, when, and for how much.
- Time to respond: Bidders had 125 days from the day the solicitation was posted, October 18, 2024, to the deadline. The deadline moved 3 times: it was first January 28, 2025 and ended as February 20, 2025.
- How it ended: Awarded to Core Tech-Hdcc-Kajima LLC on September 22, 2025, 214 days after offers were due. The contracting office reported 3 offers (full and open competition).

## Description

The work for this project includes, but is not limited to, the construction of a multi-story communications center facility to support Naval Computer and Telecommunications Station Guam operations.  Special features include Sensitive Compartmented Information Facility construction work in accordance with ICD/ICS 705 and demolition and incidental related work.  Secure facility construction shall be performed by U.S. companies using U.S. citizens.

The work will also include three (3) pre-priced options for the construction of two (2) single-story warehouse facilities, and OSP Fiber Line SONET Ring. In accordance with FAR 52.217-7 Option for Increased Quantity &ndash; Separately Priced Line Item, the Government may exercise the options by written notice to the Contractor within 365 days of contract award.

The magnitude of this project is estimated between $250,000,000 and $500,000,000.  THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE IS 236220 AND AVERAGE ANNUAL RECEIPTS OF $45 MILLION OVER THE PAST THREE YEARS.  The contract completion period is anticipated to be 1,255 calendar days.

A sources sought notice (N62742SSCOMMS) for this procurement was posted on 22 August 2023 on the System for Award Management (SAM) website https://www.sam.gov/, and a market survey was conducted that included an assessment of relevant qualifications and capabilities of potentially qualified firms.  As a result of the market research analysis, a determination was made to solicit this procurement on an unrestricted basis inviting full and open competition.

This solicitation will utilize the tradeoff source selection process.  All technical factors, when combined, are considered of equal importance to Past Performance.  The factors are:  Factor 1 &ndash; Experience, Factor 2 &ndash; Safety, Factor 3 &ndash; Small Business Utilization and Participation, Factor 4 &ndash; Past Performance, and Price.  Contract award will be made to the offeror proposing the best value to the Government from a non-price and price standpoint.  Furthermore, a relevant construction project is defined as a construction project that includes at least one of the following individual features:

     (1)  Precision Cooling System.  New construction of a chiller type technology cooling system engineered specifically for data center/electronic/IT networking environments.  Projects submitted which reference comfort cooling systems which are engineered primarily for the intermittent use required to maintain a comfortable environment for people in facilities will not be considered.  Projects submitted to demonstrate Precision Cooling System will only be considered if the work was performed by the specific entity proposed for the Precision Cooling System under the resultant contract, as identified in Block 1 of Attachment A.

     (2)  Uninterruptable Power Supply System.  New construction of an Uninterruptible Power Supply (UPS) system that is 225 kVA size or more.  Projects submitted to demonstrate UPS System experience will only be considered if the work was performed by the specific entity proposed for the UPS System, as identified in Block 1 of Attachment A.

     (3)  Clean Agent Fire Suppression System.  New construction or replacement of a clean agent fire extinguishing system and releasing system, including all mechanical, controls and electrical components necessary for a complete and operating clean agent fire suppression system.  Projects submitted to demonstrate Clean Agent Fire Suppression System experience will only be considered if the work was performed by the specific entity proposed for the Clean Agent Fire Suppression System, as identified in Block 1 of Attachment A.

See Request for Proposal (RFP) document 00 21 16.

The RFP, including the specifications and drawings, can be accessed by approved individuals via the SAM website at https://sam.gov/.  Approved individuals must register at the SAM website to obtain access to the RFP.  Registration instructions can be found on the SAM website.  Once registered in SAM, approved individuals must request explicit access to view the documents.  An email will be forwarded once the contracting office has approved or declined the request.  Approved individuals may view and/or download the RFP documents.  Amendments will also be posted at https://sam.gov/.  It is highly recommended that firms register on the SAM website as this will be the only plan holder&rsquo;s list available.  It is the offeror&rsquo;s responsibility to check the SAM website periodically for any amendments to the solicitation.

Offerors are required to be registered in the SAM database at https://www.sam.gov at the time of proposal submission.

See document 00 21 16 for pre-proposal site visit information.  This site visit is to provide Offerors with an opportunity to familiarize themselves with the jobsite and conditions to be encountered and is not for the purpose of answering questions.  Forms submission to Ms. Merbby Corpuz at merbbyjoyce.n.corpuz.civ@us.navy.mil on or before 31 October 2024, 2:00 p.m., Hawaii Standard Time (HST).

(1)  Current DBIDS.  If an interested attendee has current DBIDS credentials for the specific base where the project is located, submit the following:

COMPANY LETTER TEMPLATE:  One letter required per company. List attendees in alphabetical order (by last name).  Must be signed by a person authorized to provide the certification required.

REQUEST FOR CAMERA PASS FORM:  Applicable only for those with DBIDS credentials who will be taking photos. One letter required per company. DBIDS number is required on the form.  Once properly submitted to the POC in subparagraph (c) above and once approved, you will receive a routing number from the POC.  An appointment with the Naval Base Guam (NBG) Visitor&rsquo;s Control Center (VCC) is required to complete the processing of your camera pass.

     (2) Current DBIDS not for the specific base where the project is located.  Submit the following:

COMPANY LETTERHEAD TEMPLATE:  One letter required per company. List attendees in alphabetical order (by last name).  Must be signed by a person authorized to provide the certification required.

DBIDS BASE ACCESS REQUEST FORM:  Each attendee please read, complete, and sign/date. Typewritten is preferred.  Any handwritten forms MUST be legible.

Email the VCC at M-GU-NBG-N3AT-VCC@FE.NAVY.MIL  to have their DBIDS programmed with the specific base where the project is located.  Prior to emailing the VCC, please submit the Company Letter and the DBIDS Base Access Request Form to the POC in subparagraph (c) above for approval.  Once approved, the documents will be sent back to you for submission to the NGB VCC along with the request to have the DBIDS cards programmed with the specific base where the project is located.

REQUEST FOR CAMERA PASS FORM:  Applicable only for those with DBIDS credentials who will be taking photos. One letter required per company. DBIDS number is required on the form.  Once properly submitted to the POC in subparagraph (c) above and once approved, you will receive a routing number from the POC.  An appointment with the Naval Base Guam (NBG) Visitor&rsquo;s Control Center (VCC) is required to complete the processing of your camera pass.

       (2)  No DBIDS Credentials.  Submit the following:

COMPANY LETTERHEAD TEMPLATE:  One letter required per company. List attendees in alphabetical order (by last name).  Must be signed by a person authorized to provide the certification required.

SECNAV 5512/1 FORM:  Each attendee shall read, complete, and sign/date form. Typewritten is preferred.  Any handwritten forms MUST be legible. Do not submit the SECNAV 5512/1 form to the Government.  The Contractor is responsible for either hand-carrying or emailing this document to the NGB VCC along with any other pertinent document listed in this subparagraph.

DBIDS BASE ACCESS REQUEST FORM:  Each attendee please read, complete, and sign/date. Typewritten is preferred.  Any handwritten forms MUST be legible.

NAVAL BASE GUAM FOREIGN NATIONAL BASE ACCESS REQUEST FORM (Applicable to foreign nationals only).  Each attendee please read and complete.

FN BIOMETRIC DATA FORM (Applicable to foreign nationals only):  Each attendee please read and complete.

REQUEST FOR CAMERA PASS FORM:  Applicable only for those with DBIDS credentials who will be taking photos. One letter required per company. Once you have a routing number from the VCC for your DBIDS application, insert that number on the form.  Once properly submitted to the POC in subparagraph (c) above and once approved, you will receive a routing number from the POC.  An appointment with the Naval Base Guam (NBG) Visitor&rsquo;s Control Center (VCC) is required to complete the processing of your camera pass.

## Attachments

- [Attach (3) NDA.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0a9b0a09bdee4b6faeeeb824a4e03e4d/download)
- [Attach (2) U.S.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d087f5797807460abeb0315faa1d3c2b/download)
- [Attach (1) U.S_Firm Certification rv1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2778bb4d204c4568bd877b94b34855fe/download)
- [P649 Site Visit Location.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b68d3d77e82b4781a7ca0e8c9371705d/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_25_ET301-ET505.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1a198501d0d542e28a3ac52f9631e502/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_24_ET1166-ET1180.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/05bfa04633d7460991eaa9d895e20caf/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_23_ET1151-ET1165.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2ad5e760d4cd464686c3ab5b8580fde7/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_22_ET1136-ET1150.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5639736e75264a98933742eb2d14b971/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_21_ET1121-ET1135.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2962126eef874192a37270c52cea2447/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_20_ET1106-ET1120.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/61deec82825f4e7c97ca9aa2118255f6/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_19_ET1091-ET1105.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/456c78923b3e4172aa110fe5d31cfefd/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_18_ET1076-ET090.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bdd27a8d56884a89bd3acd33a5ae7150/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_17_ET1061-ET1075.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a3ee3ee24e1742a4840c58a48afeb081/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_16_ET1051-ET1060.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/782fc7186a33426f8c660be43936f06a/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_15_ET1040-ET1050.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1b3e0ba657eb4652b87275bedd097aa8/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_14_ET1030-ET1039.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/07a5d3f8d577431d9f851d4be3b822be/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_13_ET1019-ET1029.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/17c82cb0d2e241349ebdf748c279ee10/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_12_ET1010-ET1018.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1c3b386f4439469287a9bf10e8cde2b3/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_11_ET1001-ET1009.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/df93b6506fd9437fb3c84a088c105ff4/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_10_ET0005.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2e264748c6ca41b8990b1646491b9ede/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_09_ET0004.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/783c8c643ca24e0c8e03b83046abcc09/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_08_ET0003.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c211e286f8dc4826a08872a4ffa3e14c/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_07_ET0001-ET0002.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c0c581a183804680a3f9d2cdc1e24e6c/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_06_CT201-S-106.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/888b8a0920a643b280d01a77ed639e72/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_05_CT120-CT145.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6dd0c00b630843c69a4f310d4cdaecb4/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_04_CT101 - CT119.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a459f649170e4b73a1c1f4d050a44ccb/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_03_CT001 - CT005.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/819d5db3a01145b9a12499c1418c3377/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_02_CR101-CR502.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/abb98be2501349cca1eff6f675b7cb0e/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_01_GI001-C005.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6e9fabc7fcf04129ae650ff5a12c12b6/download)
- [SIGNED 322-376_0161546_P-649 OSP Specifications_RevisedSignature.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/60a0abbba25e4e4d9751f945a7542776/download)
- [SIGNED P-649-Refresh Dwgs_COMM_VOLUME 9_RevisedSignature_Compressed.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a56c461b6d5d4ca083cefd6546dd3154/download)
- [SIGNED P-649-Refresh Dwgs_COMM_VOLUME 8_RevisedSignature_Compressed.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4a7ced80fccc4664b910e18f2d201700/download)
- [SIGNED P-649-Refresh Dwgs_COMM_VOLUME 7_RevisedSignature 2 of 2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1fa6dae084ba47eca5ff1093a247878a/download)
- [SIGNED P-649-Refresh Dwgs_COMM_VOLUME 7_RevisedSignature 1 of 2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/49debb8ca7644e5eb1b84c0a5aa6bf6e/download)
- [SIGNED P-649-Refresh Dwgs_COMM_VOLUME 6_RevisedSignature_Compressed.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0c7c71aa2a384f2e91bd0ec8491de1bc/download)
- [SIGNED P-649-Refresh Dwgs_COMM_VOLUME 5_RevisedSignature_Compressed.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0f57004dda244bf8a02ed132b3c815b8/download)
- [SIGNED P-649-Refresh Dwgs_COMM_VOLUME 4_RevisedSignature_Compressed.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0284e3fd9a6b4b1ebfcda7d97fd20fea/download)
- [SIGNED P-649-Refresh Dwgs_COMM_VOLUME 3_RevisedSignature_Compressed.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/475f6456b0bf46c199a0b82e56fbc133/download)
- [SIGNED P-649-Refresh Dwgs_COMM_VOLUME 2_RevisedSignature_Compressed.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cfd6fe8d8d5247a8bfb3ffb0f0889e47/download)
- [SIGNED P-649-Refresh Dwgs_COMM_VOLUME 1_RevisedSignature_Compressed.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/05bd9c7d11944d948fd782b8930aaf43/download)
- [322-1214_0161546_Comm-Whse Specifications_Volume 3_RevisedSignature.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8894850a3f874a14a38d5d3336f576e2/download)
- [322-1214_0161546_Comm-Whse Specifications_Volume 2_RevisedSignature.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a89480f8284346789eb6d56b727b7f72/download)
- [322-1214_0161546_Comm-Whse Specifications_Volume 1_RevisedSignature_SIGNED.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f6202e3d1f87422f854956fadf835081/download)
- [25-1319_RFP.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d5a1273f7fbd463a8f0791258c564d43/download)
- [01_25R1319_Amd0001-Issued.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/37757668c2c74988984b85ea83ca13e3/download)
- [01_25R1319_Amd0002-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/03c757c0a63d4ae6bfe0c7cb13cd9cae/download)
- [02_P649_Amd0002-Vol2-Specs_CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6b263aafceb4408b964558420c64e713/download)
- [03_P649-RefreshDwgs_COMM_VOL2-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6e988bc99c934e60b58a238352e9e132/download)
- [04_P649-RefreshDwgs_COMM_VOL3-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1f4a49b6b37f4cc5838b3d42492d6fbd/download)
- [05_P649-RefreshDwgs_COMM_VOL4-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f8a0e51e7f954fd1bf34709dd566f2ae/download)
- [06_P649-RefreshDwgs_COMM_VOL5-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/69f8961685934ea7a4fe3ef4a29a4d99/download)
- [07_P649-RefreshDwgs_COMM_VOL6-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a698b74120c44cbf9c82c3a8875965b1/download)
- [25R1319 P649 Note1-Issued.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/44cc2fba0f874b9c812120cbb0eee4e2/download)
- [25R1319_Amd0003-Issued.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/85416a0f0265460495352273c4406bd5/download)
- [SIGNED P-649-Refresh Dwgs_OSP Revised Signature_11_ET1001-ET1009-2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/950cc4a4f538490fb5111f3756d612f6/download)
- [25R1319 P649 Note 2-Issued.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dea0cb6c1b694049aa82d9af21211870/download)
- [01_25R1319_Amd0004_Issued.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/499e683cd03d4124a9d0b81b8d45da6b/download)
- [P649_Amd0004_NEW_A605B-A605C_SIGNED.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e3aaf08f993d40329f42719e1e49cd3c/download)
- [P649_Amd0004_REV_A511-A643 SIGNED.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/82d94a4c1dcb4edeb65cd21ed21d94c1/download)
- [25R1319 Note 3.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e8a4c12281f941fba232c5d7519176bc/download)
- [197 Field Figures.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6f82d59375624d73bf57927dafb6abee/download)
- [197 Field Tables.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8ae2a7ffa57e47468038101bfe0afdc5/download)
- [N61755_1690538_122_1_AsbestosSurvey_20171025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/22114285953d43d5b8b7e7e2f78d4ba8/download)
- [N61755_1691083_197_2_AsbestosSurvey_20171014.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c89f7bf0bf2e4a0387568e572e8cb551/download)
- [25R1319 Note 4-CUI-Issued.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/86713a890c00491ead2cfa5d72be29d7/download)
- [25R1319_Amd0005-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/73cc69d4332c4d4e99aa547967940f25/download)
- [P649_Dwg_A514-CUI SIGNED.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1529ff60398d407b9e03d3b7fd5b44f3/download)
- [01_25R1319_Amd0006.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9015040293014c65a160e5d8e899b93c/download)
- [02_25R1319_SBSP-Amd0006_Updated.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f8e429c5c7b14a46949035af2015f9af/download)
- [03_P649 00 70 00 RFP(ADVERTISE)-Amd0006.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7402ef8f22b84f56bef6899c2ff099b0/download)
- [04_AMD0006_SKS005-007.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8bf528f36e964cb6a76151f2df49c27a/download)
- [25R1319 Note 5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f6fbc353fcd746e3833f84e14ef6c353/download)
- [25R1319 Note 6.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/56b0583e1f6d40b89f82acd306eb5cc5/download)
- [25R1319 Note 7-Issued.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/494aee2ab5334eed8c08ab2b786ff5d1/download)
- [25R1319 Note 8-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ea8b536ff6ff43409b2da2723b4107d6/download)
- [25R1319_SV1-SignIn-Compl.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/030de63d419840889198486d7461d4d8/download)
- [25R1319 Note 9.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a55f1577f21149e585011e03088329ab/download)
- [25R1319 Note 10-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6421f76289c3465ba87d08dbfd9820ca/download)
- [25R1319 Note11.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bb568f1c15eb4417a7ea83cf8156adc6/download)
- [25R1319 Note 12-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2356421255da47c5894ec0119b101779/download)
- [01_25R1319_Amd0007.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/af1f7cd504384ca299c88742cf129fff/download)
- [02_AMENDMENT 0007 DRAWINGS.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6cb6f89233db4fd897b1ba437ea45faa/download)
- [25R1319 Note13.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/77ca3fa5ddde4d069e6e1c6fc73122cc/download)
- [25R1319 Note13.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4415a88671484f7dab32ee3163fbabfd/download)
- [13_Amd0008 SKC-CU527.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b93ae9bab17d44878c1e212a5658adbf/download)
- [12_Amd0008 SKC-CS501A.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/81ae9fa2564841ac8da4c7d94ac4c6ac/download)
- [11_Amd0008 CU505 STORM DRAIN DETAILS - 5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/66c4590e86f44de494e9b7e9f2bf1526/download)
- [10_Amd0008 CS105A-SITE PLAN - 5.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/61068217411c4a72bfca107fa1948e85/download)
- [09_Amd0008 CS-104A-SITE PLAN - 4 (2).pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3dfcaf99dde141bb8af456b2539284fe/download)
- [08_Amd0008 CS-101B-SITE PLAN.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3d971a083e0942308102cdce1e359fca/download)
- [07_Amd0008 CR502 PAVEMENT DETAILS - 2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b7b20d2d7bbf4bc3943de9d1cbe5951b/download)
- [06_Amd0008 CR501-PAVEMENT DETAILS OSP FIBER ROUTE.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/eb90a50163704603ac9a3119bc860ba1/download)
- [05_Amd0008 CR501 PAVEMENT DETAILS - 1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/760bf1b661894b69b8945398b3ad0385/download)
- [04_Amd0008 CD001C-DEMOLITION PLAN.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4098289fe26a44489da8d11f6a32cc1f/download)
- [03_Amd0008 C-501 - FENCE DETAILS - 1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b03490550bdd40539ecfb7c23ef4a405/download)
- [02_Amd0008 REVISED DRAWINGS.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ec65416e36fc407ab41a8105b5771a76/download)
- [01_25R1319_Amd0008.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2274c88f0f6941eb9c58e8d49fcdaaac/download)
- [25R1319 Note 14-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/45863bc9fe934a65822f8155134c62a3/download)
- [03_AMENDMENT 0009 REVISED DRAWINGS - SIGNED.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8c4f0d3badb44d0c8958b30afddcaa1a/download)
- [02_AMENDMENT 0009 ADDED DRAWINGS - SIGNED.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/10e976ed9c6948faaec3bf8281af6100/download)
- [01_25R1319_Amd0009.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4bdb74caa73f45e5937862da9b4c8558/download)
- [01_25R1319_Amd0010-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/00486e7d829344a8b80dec40073666c2/download)
- [25R1319 Note 15_Enclosure 2 - Administrative Record.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/65b0b357a023422fb9f90ece2d517cb9/download)
- [25R1319 Note15.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3c11e6c5a2a1461498ebf8e291d4e577/download)
- [25R1319 Note 16-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4ca206a11eea444a8b9491b7b2baff15/download)
- [25R1319 Note17.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a469d62f2bcc4a709a62f781134fb253/download)
- [02_Signed Amendment 0011 Revised Drawings - EM.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/efa17b224fdc47afa33d47a3d5a701c7/download)
- [01_25R1319_Amd0011.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a542abbfaa79471d8b589a9d0ecb812f/download)
- [02_Signed Amendment 0012 Revised Fixed Facility Drawings.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/41067308e5974ee9890117dd1c1a4ef7/download)
- [01_25R1319_Amd0012-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2035373c610745a0967e3cab3d4747be/download)
- [25R1319 Note18.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3bbc85fb4cb14e27abaecb1cef797bba/download)
- [25R1319 Note19.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/252a75a37d224f0181098414f1f6913c/download)
- [25R1319 Note 20-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cdc0a2dea0af4627992949a99fe9eb57/download)
- [25R1319 Note21.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/534be4fb4d104811a78ef262cddb06a1/download)
- [04_25R1319 Amendment 0013 Revised Drawings.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/486dbe0c559745689a152af9cf09df1e/download)
- [03_25R1319 Amendment 0013 Added Drawings.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/67478206528149f2b92369c9a4a38c73/download)
- [02_25R1319_mco 5530_14a_Amd0013.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6f30444e1c9c4fa5b905af57fc78ecfb/download)
- [01_25R1319_Amd0013.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/025ba4b595374b5694819f8600c2ae86/download)
- [02_Amendment 0014 Revised Fixed Facility Drawings-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d622ed5e880d4ddf986f44a6be68b14d/download)
- [01_25R1319_Amd0014-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/373ceb5fdb774ea592c137d935b1c7d1/download)
- [25R1319 Note22.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c6415e73d38c4f1680e33a90962634ca/download)
- [02_Amendment 0015 Revised Drawings.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dd167684fee54e918a4588c9eb68ba74/download)
- [01_25R1319_Amd0015.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3be9c73b2a4e4441b5bf275b4ee8c30f/download)
- [02_Amendment 0016 Revised Fixed Facility Drawings-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/91eead71c7834e2aa359b4667749c547/download)
- [01_25R1319_Amd0016-CUI.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d632cc6c68dd46629ac284d62d4f4469/download)
- [23_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol25_ET501-ET505.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1a8c647bf8b1401c8c1b3fdaac0febeb/download)
- [22_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol24_ET1166-ET1180.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c9063f0756c14136bb8dc2abf7c1f472/download)
- [21_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol23_ET1151-ET1165.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/677222c5ec3548bcb91bfdf5a2ef516d/download)
- [20_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol22_ET1136-ET1150.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dbd654227dc046f9ace6bc71e01c019d/download)
- [19_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol21_ET1121-ET1135.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c1557873cf974ab9952a09ca2eddc566/download)
- [18_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol20_ET1106-ET1120.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3f0e585683964ef49209e721c1575d06/download)
- [17_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol19_ET1091-ET1105.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/124f944ed006424a8ab6fa0ec2b346a5/download)
- [16_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol18_ET1076-ET090.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fb35afeff8f345c09c86b692d1a6b97a/download)
- [15_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol17_ET1061-ET1075.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c5b4c4c5b3c04231accc3649a667dc4b/download)
- [14_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol16_ET1051-ET1060.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0a2ed0f5f2f74788bb278922573ba812/download)
- [13_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol15_ET1040-ET1050.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/466c42a06e7b462b989578eacbb9bd5e/download)
- [12_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol14_ET1030-ET1039.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ad587f3e4a1b4aa69c30c02dece47230/download)
- [11_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol13_ET1019-ET1029.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d85580b0360443349555e31ffba6fad8/download)
- [10_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol12_ET1010-ET1018.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b0ca49751acf4f04b506253343395fde/download)
- [09_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol11_ET1001-ET1009.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7cc4e631ed814f21aee032afbefe9aa3/download)
- [08_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol10_ET0005.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a23d2dc7f924435dbc196329267112d7/download)
- [07_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol09_ET0004.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/70f71ee5fe3447eab62a56bc4b47ae39/download)
- [06_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol08_ET0003.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/08c8139af59d47cd98dcfe9acf8a7379/download)
- [05_Amd0017_P-649-Refresh Dwgs_OSP Revised Signature_Vol07_ET0001-ET0002.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/833c6180512c4ea5bf42934ed1a0cdd7/download)
- [04_Amd0017_P-649-Refresh Dwgs_COMM_VOLUME 7_RevisedSignature 2 of 2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8b41e5b2352e428c90b18d629c887c63/download)
- [03_Amd0017_P-649-Refresh Dwgs_COMM_VOLUME 7_RevisedSignature 1 of 2.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7fe3f5f406bc4752844fd11a490e6361/download)
- [02_Amd0017_P-649-Refresh Dwgs_COMM_VOLUME 4_RevisedSignature_Compressed.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/648f2cd1c9e0421a90b89de8d1fdfaec/download)
- [01_25R1319_Amd0017.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a379eededabc4f78a8d3d61b07e44b26/download)
- [25R1319 Note23.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/86c702f91f97414ca3fc06b42bb841ec/download)

## Award on USAspending

- Recipient: Core Tech-Hdcc-Kajima LLC (UEI H3PJV2J2DAA2)
- Contract: N6274225C1319, definitive contract
- Obligated: $219,000,000.00, current value $289,762,614
- Competition: Full and Open Competition, 3 offers received
- Link: award number N6274225C1319 equals the contract number; same awarding office N62742 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_N6274225C1319_9700_-NONE-_-NONE-/


## Open now in the same industry

191 open in NAICS 236220.

- Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support (HARBSS-2027-01), due November 27, 2026 at 12:00 PM EST. https://sealedbidder.com/opportunities/harbss202701
- 657-24-102JC - Prepare Site for New PET/CT, Room A011D (MD) FY27 NRM VISN Base, CON (VA-27-00017492) 657-27-1-8434-0001 (36C25527R0016), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/36c25527r0016
- STATION-CONST TBD OIG RENOVATION (36C24227Q0135), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/36c24227q0135

## Publications

- October 18, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 055b5b3a01974e258461ac2a950780d9. https://sam.gov/workspace/contract/opp/055b5b3a01974e258461ac2a950780d9/view
- October 18, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 2fdd88b1463e45dfb7fdc3a4b2108c2f. https://sam.gov/workspace/contract/opp/2fdd88b1463e45dfb7fdc3a4b2108c2f/view
- October 18, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 3e2fec5abdb24472b37aa36d8728a2ef. https://sam.gov/workspace/contract/opp/3e2fec5abdb24472b37aa36d8728a2ef/view
- October 18, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 90a56315199046248b786f3174709fa2. https://sam.gov/workspace/contract/opp/90a56315199046248b786f3174709fa2/view
- October 18, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 9ea58bd314d34429b9fd226bb677a7a5. https://sam.gov/workspace/contract/opp/9ea58bd314d34429b9fd226bb677a7a5/view
- October 18, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice e0c2afec8c32468a93b31602540457f7. https://sam.gov/workspace/contract/opp/e0c2afec8c32468a93b31602540457f7/view
- October 18, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice e1917252abc94cd9ad89898ec809f5ea. https://sam.gov/workspace/contract/opp/e1917252abc94cd9ad89898ec809f5ea/view
- October 18, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice ef5b96c5e586455bbb6fcb7d0e688366. https://sam.gov/workspace/contract/opp/ef5b96c5e586455bbb6fcb7d0e688366/view
- October 23, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 514cb5d0054a4eb1981b9fb73621e32f. https://sam.gov/workspace/contract/opp/514cb5d0054a4eb1981b9fb73621e32f/view
- November 5, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 78c2f6b08a1a4a18b64caf4d7d7ceab6. https://sam.gov/workspace/contract/opp/78c2f6b08a1a4a18b64caf4d7d7ceab6/view
- November 6, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice b80f39afbdf74691b66f782ce1459d2f. https://sam.gov/workspace/contract/opp/b80f39afbdf74691b66f782ce1459d2f/view
- November 15, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 92be5043c7994d06a0d78966a7b33991. https://sam.gov/workspace/contract/opp/92be5043c7994d06a0d78966a7b33991/view
- November 25, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice bbc0e711aedc4ffda095e35c05ee7896. https://sam.gov/workspace/contract/opp/bbc0e711aedc4ffda095e35c05ee7896/view
- November 26, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice fdbb5e2e8cbf4222b93520f083da5594. https://sam.gov/workspace/contract/opp/fdbb5e2e8cbf4222b93520f083da5594/view
- December 4, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 2e7442592e274c359815dc16ec93d60a. https://sam.gov/workspace/contract/opp/2e7442592e274c359815dc16ec93d60a/view
- December 9, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 5b1ba60823594683bd067939529d70dc. https://sam.gov/workspace/contract/opp/5b1ba60823594683bd067939529d70dc/view
- December 10, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 42ab026d23ae49d1aad104ec87d71a40. https://sam.gov/workspace/contract/opp/42ab026d23ae49d1aad104ec87d71a40/view
- December 16, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 37d8b0712bf54d46800ef9ba60595724. https://sam.gov/workspace/contract/opp/37d8b0712bf54d46800ef9ba60595724/view
- December 16, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice be864ffc22eb4c61ac6d4a2dcdbf4600. https://sam.gov/workspace/contract/opp/be864ffc22eb4c61ac6d4a2dcdbf4600/view
- December 16, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice f7d9e8a6fab34038b92c9f29b3a01314. https://sam.gov/workspace/contract/opp/f7d9e8a6fab34038b92c9f29b3a01314/view
- December 23, 2024: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice d9ecf8f73ad942f9b847044ae9b4536a. https://sam.gov/workspace/contract/opp/d9ecf8f73ad942f9b847044ae9b4536a/view
- January 3, 2025: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 673cda5109fa4631a3ef6d1f633636c8. https://sam.gov/workspace/contract/opp/673cda5109fa4631a3ef6d1f633636c8/view
- January 7, 2025: Solicitation, due January 28, 2025 at 7:00 PM EST. Notice 5180dd8c25c94df4ad08e882f817a132. https://sam.gov/workspace/contract/opp/5180dd8c25c94df4ad08e882f817a132/view
- January 15, 2025: Solicitation, due February 4, 2025 at 7:00 PM EST. Notice 60e87d44c315413fa37beb8053688d4c. https://sam.gov/workspace/contract/opp/60e87d44c315413fa37beb8053688d4c/view
- January 15, 2025: Solicitation, due February 4, 2025 at 7:00 PM EST. Notice cad72488d70d4dec9d56b1a4f4f05424. https://sam.gov/workspace/contract/opp/cad72488d70d4dec9d56b1a4f4f05424/view
- January 15, 2025: Solicitation, due February 4, 2025 at 7:00 PM EST. Notice ee0567e58da848db9256b869899a153e. https://sam.gov/workspace/contract/opp/ee0567e58da848db9256b869899a153e/view
- January 21, 2025: Solicitation, due February 4, 2025 at 7:00 PM EST. Notice b82387359ff3407d983ace2ee364dc70. https://sam.gov/workspace/contract/opp/b82387359ff3407d983ace2ee364dc70/view
- January 22, 2025: Solicitation, due February 4, 2025 at 7:00 PM EST. Notice 5ace218973c54e498febceffdc893aff. https://sam.gov/workspace/contract/opp/5ace218973c54e498febceffdc893aff/view
- January 23, 2025: Solicitation, due February 18, 2025 at 7:00 PM EST. Notice ea365b4c2f434705ad7965841b88d917. https://sam.gov/workspace/contract/opp/ea365b4c2f434705ad7965841b88d917/view
- January 24, 2025: Solicitation, due February 18, 2025 at 7:00 PM EST. Notice e84d007e0bb74418bf165c9825fbd305. https://sam.gov/workspace/contract/opp/e84d007e0bb74418bf165c9825fbd305/view
- January 24, 2025: Solicitation, due February 18, 2025 at 7:00 PM EST. Notice fe95273334114774aa4074537557955e. https://sam.gov/workspace/contract/opp/fe95273334114774aa4074537557955e/view
- January 27, 2025: Solicitation, due February 18, 2025 at 7:00 PM EST. Notice ba80e3f4771e43b5a14b38b9f34b64de. https://sam.gov/workspace/contract/opp/ba80e3f4771e43b5a14b38b9f34b64de/view
- January 30, 2025: Solicitation, due February 18, 2025 at 7:00 PM EST. Notice 83c910ac198a4ee298009b0e78894238. https://sam.gov/workspace/contract/opp/83c910ac198a4ee298009b0e78894238/view
- February 4, 2025: Solicitation, due February 18, 2025 at 7:00 PM EST. Notice b6dede8bf7e14a6f8870a8ac9dcb1995. https://sam.gov/workspace/contract/opp/b6dede8bf7e14a6f8870a8ac9dcb1995/view
- February 7, 2025: Solicitation, due February 18, 2025 at 7:00 PM EST. Notice 823e9fa43b8f451dbd9cd23f05044ee9. https://sam.gov/workspace/contract/opp/823e9fa43b8f451dbd9cd23f05044ee9/view
- February 11, 2025: Solicitation, due February 18, 2025 at 7:00 PM EST. Notice ff3d04bde6c344acb015ac287e438224. https://sam.gov/workspace/contract/opp/ff3d04bde6c344acb015ac287e438224/view
- February 12, 2025: Solicitation, due February 20, 2025 at 7:00 PM EST. Notice d147b62d863248398c6174cc40ac5d1d. https://sam.gov/workspace/contract/opp/d147b62d863248398c6174cc40ac5d1d/view
- February 13, 2025: Solicitation, due February 20, 2025 at 7:00 PM EST. Notice a2b9d5209f824a42bfccb422e3ddfcf8. https://sam.gov/workspace/contract/opp/a2b9d5209f824a42bfccb422e3ddfcf8/view
- February 14, 2025: Solicitation, due February 20, 2025 at 7:00 PM EST. Notice 76dc132e3e5d4fceaa3c4893784f847c. https://sam.gov/workspace/contract/opp/76dc132e3e5d4fceaa3c4893784f847c/view
- September 22, 2025: Award notice. Notice 9cfe291d3d2d45d4a5759223933e7007. https://sam.gov/workspace/contract/opp/9cfe291d3d2d45d4a5759223933e7007/view

## Points of contact

- Merbby Corpuz, merbbyjoyce.n.corpuz.civ@us.navy.mil, 808-474-4550
- Adele Murakami, adele.m.murakami.civ@us.navy.mil, 8084711887

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/n6274225r1319.