Award notice, first published as presolicitation
FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM
N6274225R1301
Department of the Navy, Navfacsyscom Pacific. Commercial and Institutional Building Construction.
Awarded
$157,555,963.99 obligated so far on USAspending
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one was awarded in 2025
193 like it are open now in commercial and institutional building construction
- Y1DA | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical Use
Department of Veterans Affairs, 247-Network Contract Office 7
SolicitationSDVOSBNAICS 236220Alabama36C24726R0134Due todayNov 26 - 614-326 Construct Parking Garage West Lot Addition Minor Construction
Department of Veterans Affairs, Pcac
PresolicitationSDVOSBNAICS 236220Memphis, TN36C77627B0003_1Due todayNov 26 - Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support
Department of the Air Force, FA6648 482 LSS LGC
Sources soughtNAICS 236220Ship to Homestead, FLHARBSS-2027-01Due tomorrowNov 27
All 193 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Award notice. Who won, when, and for how much. Glossary
- Time to respond
- Bidders had 106 days from the day the solicitation was posted, October 30, 2024, to the deadline. The deadline moved 4 times: it was first January 9, 2025 and ended as February 13, 2025.
- Before the solicitation
- The agency published a presolicitation on October 10, 2024, 20 days before the solicitation.
- How it ended
- Awarded to Core Tech-Hdcc-Kajima LLC on July 3, 2025, 140 days after offers were due. The contracting office reported 4 offers (full and open competition).
Description
As published on SAM.gov with the solicitation of March 26, 2025.
The work for this project includes the construction (design-bid-build) of a Guam Defense Radar System Command Center (CC), power generation facility, switchgear building, fuel storage facility, entry control facility, and associated equipment. The CC will include functional areas to accommodate personnel, computing equipment, user interfaces, and communications needed for planning, controlling, and directing mission activities. The power generation facility will provide power via the switchgear facility for the command center and associated infrastructure with fuel from the storage facility consisting of above ground fuel tanks, fuel off-loading infrastructure, and associated containment. The CC facility and power generation facility will be designed for Risk Category IV to meet site specific ground motion and seismic requirements to include base isolation.
Construction scope and methods that will be required as part of this project include, but are not limited to:
- Demolition of existing housing units and the associated mitigation/disposal of asbestos, lead contaminated materials, and pesticide contaminated soil
- Civil site work, including grading, paving, and retaining walls
- Concrete construction meeting the requirements of ICC-500 Storm Shelter and including coordination of cast-in-place, tilt-up, and precast elements
- 150 foot Galvanized Steel Antenna Tower and associated foundation
- Seismic Isolation Bearings requiring a specialized installation procedure and building erection sequence involving extensive construction shoring and bracing
- Protection measures for nonstructural components, including flex loops for piping & conduit to accommodate seismic movement
- Security infrastructure includes real property features to support the installation of Security System Level (SSL)-C and Integrated Electronic Security System (IESS), site security measures, entry control, and material procurement & inspection requirements
- Facilities will be designed to provide cyber security engineering and validation
- Control System Integration requiring the aggregation of multiple control systems, including Building Controls, Fuel System Controls, and Utility Controls
- Complex schedule due to the nature of the concrete & isolated foundation construction, long lead times for major equipment such as Tier 2 Emergency Generators and Mechanical equipment, and multiple Joint Occupancy Date (JOD) milestones in the construction schedule to accommodate work of other contractors outfitting systems, installing equipment, and integrating controls
- Electrical (lighting and distribution), fiber optic and telecommunications, fire protection, sanitary sewer, and storm drainage
The work will include four (4) pre-priced options. Option 1 is the price for one generator and fuel tank #2. Option 2 is the price for one generator. Option 3 is the price for one generator. Option 4 is the price for the Uninterruptible Power Supply in the command center. Option 5 is the price for B-side systems and equipment in the power plant and command center. In accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item, the Government may exercise the options by written notice to the Contractor within 365 days of contract award.
The magnitude of this project is estimated between $250,000,000 and $500,000,000. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE IS 236220 AND AVERAGE ANNUAL RECEIPTS IS $45.0 MILLION OVER THE PAST THREE YEARS. The contract completion period is anticipated to be 1,323 calendar days.
A sources sought notice (N62742GDSCC) for this procurement was posted on 16 March 2024 on the System for Award Management (SAM) website https://www.ssam.gov/, and a market survey was conducted that included an assessment of relevant qualifications and capabilities of potentially qualified firms. As a result of the market research analysis, a determination was made to solicit this procurement on an unrestricted basis inviting full and open competition. The NAVFAC Pacific small business office concurs with this decision.
This is a best-value, trade off source selection procurement requiring the submission of both non-price and price proposals. All technical factors, when combined are of equal importance to past performance; and all evaluation factors other than price, when combined, are approximately equal to price. Proposals submitted in response to this solicitation shall be in the English language and in U.S. dollars.
Contract award will be made to the responsible offeror whose offer, conforming to the solicitation, is determined to be the lowest evaluated price of proposals meeting or exceeding the acceptability standards for technical factors. The technical factors are as follows: (1) Experience, (2) Small Business Utilization and Participation, (3) Safety, (4) Management Plan, and (5) Past Performance. For evaluation of experience and past performance, a relevant construction project is defined as:
- New construction of an administrative, office or communications facility approximately $80 million or more in dollar value and completed or substantially completed within the past ten (10) years from the date of issuance of the solicitation.
- New construction of a secure space conforming to the requirements of ICD-705 approximately $10 million or more in dollar value and completed or substantially completed within the past ten (10) years from the date of the issuance of the solicitation.
- New construction of essential facilities located in moderate to high seismic areas approximately $80 million or more in dollar value and completed or substantially completed within the past ten (10) years from the date of the issuance of the solicitation.
“Moderate to high seismic areas” are defined as geographic areas with a Peak Ground Acceleration (PGA) greater than 0.5g and a probability of ground motion exceedance equal or less than 2% in 50 years. The Whole Building Design Guide (WBDG) Structural Load Tool for UFC 3-301-01 can be used to identify the PGA of geographic areas. This tool can be found at Structural Load Data Tool for UFC 3-301-01 | WBDG - Whole Building Design Guide. Examples of areas with these characteristics include but are not limited to Guam, California, Alaska, and Japan.
The Request for Proposal (RFP) will be available on 30 October 2024. Printed copies of the RFP will not be issued. The RFP, including the specifications and drawings, can be accessed via the System for Award Management (SAM) website at https://sam.gov/. Contractors must register at the SAM website to obtain access to the RFP. Registration instructions can be found on the SAM website. Amendments will also be posted at https://sam.gov/. It is highly recommended that firms register on the SAM website as this will be the only plan holder’s list available. It is the offeror’s responsibility to check the SAM website periodically for any amendments to the solicitation.
A one-time pre-proposal site visit has been scheduled for 11 December 2024, 9:00 a.m. Chamorro Standard Time (ChST). The pre-proposal site visit is to provide offerors with an opportunity to familiarize themselves with the jobsite and conditions to be encountered, and it is not for the purpose of answering questions. Offerors interested in attending the site visit shall submit the following forms:
- Base Access Request – Contractor Memo (Fill-in information in red).
- III Log (Complete in accordance with the attached “How to Fill Out the III Log” instructions located at the end of this Document.)
- Base Access Affidavit 2020 (completed for each visitor that does NOT have DBIDS pass)
- Foreign National Access Request Form
- Contractor Policy Update Memo
- Either a U.S. Passport or REAL ID Act Driver’s License/ID
The completed forms shall be submitted to Dayna Matsumura, Contract Specialist, at dayna.n.matsumura.civ@us.navy.mil on or before 14 November 2024, 2:00 p.m., Hawaii Standard Time (HST). Once approved for base access, a Tracking Number will be emailed to attendees for use when obtaining base passes at the Visitor Control Center (Northgate), Andersen Air Force Base.
PLEASE BE INFORMED: The Visitor Control Center (Northgate) requires sufficient processing time for each visitor. Consequently, if an attendee submits the application forms after the specified due date and time, the attendee may not be able to attend the site visit.
The furnishing of the above information, including your Social Security Number, is voluntary. However, your failure to furnish all or part of the information request may result in the Government's denial of access to the jobsite. Any of the above information furnished by you and protected under the Privacy Act shall not be released unless permitted by law and/or you have consented to such release.
Upon receipt of the above information, our office will submit a letter to the Pass and ID office authorizing your entrance.
On the day of the visit, attendees shall meet promptly at the Pacific Regional Training Center (PRTC) Gate and bring necessary Base Access Pass, the “III Log” and “new Contractor Letter Memorandum” to the site visit. For those that do NOT have DBIDS, pick up an approved day pass from the Visitor’s Center (Northgate). Attendees shall meet at the Visitor Control Center overflow parking lot.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- P693_Specs_Final_Vol02_20241007.pdf10.5 MB, October 31, 2024
- P693_Specs_Final_Vol01_20241007.pdf33.0 MB, October 31, 2024
- P693_Drawings_Final_Vol14.8_20241007.pdf3.6 MB, October 31, 2024
- P693_Drawings_Final_Vol14.7_20241007.pdf111.6 MB, October 31, 2024
- P693_Drawings_Final_Vol14.6_20241007.pdf6.3 MB, October 31, 2024
- P693_Drawings_Final_Vol14.5_20241007.pdf62.7 MB, October 31, 2024
- P693_Drawings_Final_Vol14.4_20241007-Part5.pdf20.8 MB, October 31, 2024
- P693_Drawings_Final_Vol14.4_20241007-Part4.pdf38.9 MB, October 31, 2024
- P693_Drawings_Final_Vol14.4_20241007-Part3.pdf39.5 MB, October 31, 2024
- P693_Drawings_Final_Vol14.4_20241007-Part2.pdf39.3 MB, October 31, 2024
- P693_Drawings_Final_Vol14.4_20241007-Part1.pdf39.8 MB, October 31, 2024
- P693_Drawings_Final_Vol14.3_20241007.pdf74.3 MB, October 31, 2024
- P693_Drawings_Final_Vol14.2_20241007-Part5.pdf14.6 MB, October 31, 2024
- P693_Drawings_Final_Vol14.2_20241007-Part4.pdf39.3 MB, October 31, 2024
- P693_Drawings_Final_Vol14.2_20241007-Part3.pdf38.7 MB, October 31, 2024
- P693_Drawings_Final_Vol14.2_20241007-Part2.pdf38.7 MB, October 31, 2024
- P693_Drawings_Final_Vol14.2_20241007-Part1.pdf40.0 MB, October 31, 2024
- P693_Drawings_Final_Vol14.1_20241007-Part3.pdf30.8 MB, October 31, 2024
- P693_Drawings_Final_Vol14.1_20241007-Part2.pdf39.2 MB, October 31, 2024
- P693_Drawings_Final_Vol14.1_20241007-Part1.pdf42.7 MB, October 31, 2024
- 25-1301 P-693 RFP.pdf4.1 MB, October 31, 2024
- Am-0001.pdf1.1 MB, November 6, 2024
- Am-0002.pdf19.1 MB, November 8, 2024
- Am-0003 Attachment 1_Revised Drawings dtd 11-8-2024.pdf4.6 MB, November 15, 2024
- Am-0003.pdf2.5 MB, November 15, 2024
- Am-0004 Attachment 1_Revised Drawings dtd 11-15-2024.pdf24.8 MB, November 26, 2024
- Am-0004.pdf3.3 MB, November 26, 2024
- 25-1301 CmdCtrl Notice1.pdf50 KB, October 31, 2024
- 25-1301 CmdCtrl Notice2.pdf295 KB, November 14, 2024
- 25-1301 CmdCtr Notice3.pdf325 KB, November 26, 2024
- 25-1301 CmdCtrl Notice4.pdf224 KB, December 5, 2024
- 25-1301 CmdCtrl Notice5.pdf1.0 MB, December 11, 2024
- 25-1301 CmdCtrl Notice6.pdf567 KB, December 13, 2024
- P693_Sign-in Sheets_Redacted.pdf6.4 MB, December 19, 2024
- R-P693_Drawings_Final_Vol14.8_20241007.pdf6.6 MB, December 5, 2024
- R-P693_Drawings_Final_Vol14.7_20241007.pdf13.3 MB, December 5, 2024
- R-P693_Drawings_Final_Vol14.6_20241007.pdf9.5 MB, December 5, 2024
- R-P693_Drawings_Final_Vol14.5_20241007.pdf20.8 MB, December 5, 2024
- R-P693_Drawings_Final_Vol14.4_20241007.pdf17.0 MB, December 5, 2024
- R-P693_Drawings_Final_Vol14.2_20241007.pdf128.0 MB, December 5, 2024
- R-P693_Drawings_Final_Vol14.1_20241007.pdf90.0 MB, December 5, 2024
- Am-0005 Attachment 1_Revised Drawings dtd 11-22-2024.pdf9.4 MB, December 17, 2024
- Am-0005.pdf2.5 MB, December 17, 2024
- Am-0006 Attachment 1_Revised Drawings dtd 6 Dec 2024.pdf5.0 MB, December 17, 2024
- Am-0006.pdf720 KB, December 17, 2024
- Am-0007 Attachment 1_Revised Drawings dtd 13 Dec 2024.pdf14.9 MB, December 17, 2024
- Am-0007.pdf944 KB, December 17, 2024
- Am-0008.pdf963 KB, December 24, 2024
- Am-0009.pdf23.2 MB, January 7, 2025
- Attachment 1_Revised Drawings_dtd 13 and 20 Dec 2024.pdf10.8 MB, January 7, 2025
- 25-1301 CmdCtrl Notice7.pdf172 KB, December 17, 2024
- 25-1301 CmdCtrl Notice8.pdf447 KB, December 19, 2024
- 25-1301 CmdCtrl Notice9.pdf1.1 MB, January 7, 2025
- 25-1301 CmdCtrl Notice10.pdf264 KB, January 15, 2025
- Am-0010.pdf4.5 MB, January 16, 2025
- Am-0010 Attachment 2_Revised Drawings_Signed.pdf24.4 MB, January 16, 2025
- 25-1301 CmdCtrl Notice11.pdf354 KB, January 24, 2025
- 25-1301 CmdCtrl Notice12.pdf273 KB, February 3, 2025
- 25-1301 CmdCtrl Notice13.pdf183 KB, February 4, 2025
- Am-0011 Attachments 25-44.pdf1.3 MB, February 5, 2025
- Am-0011 Attachments 2-24.pdf3.1 MB, February 5, 2025
- Am-0011 Attachment 1_Revised Drawings dtd 1-28-2025.pdf14.1 MB, February 5, 2025
- Am-0011.pdf3.9 MB, February 5, 2025
- 25-1301 CmdCtrl Notice14.pdf206 KB, February 7, 2025
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Core Tech-Hdcc-Kajima LLC
- UEI
- H3PJV2J2DAA2
- CAGE
- 7HD12
- Vendor location
- Tamuning, GU
- Contract
- N6274225C1301, definitive contract
- Obligated
- $157,555,963.99, current value $295,079,107, potential $297,570,150
- Actions
- 5 between July 3, 2025 and June 2, 2026
- Competition
- Full and Open Competition, 4 offers received
- Set-aside reported
- No Set Aside Used.
- Described as
- FY25 Mcon P-693 Pdi: Guam Defense System Command Center, Joint Region Marianas, Guam
- Match
- award number N6274225C1301 equals the contract number; same awarding office N62742 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 10, 2024
Presolicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice a46f59bbd6aa432b99af30ca9b2c7d28
October 30, 2024
Presolicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice daa68fc13eba4e6fa14afa38620b737f
October 30, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice dd7dba995fec4a15b4347dc534a0c815
October 30, 2024
Solicitation, originally presolicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice ea49622653b44aed8dd36998843be82c
November 6, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice 0faadbe2043f450f890b72dff91c3b5c
November 6, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice 632a1802a1e148f29edd38df9f871cfc
November 7, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice fc927fd3c3ee49ed9e603d820474b180
November 13, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice b8a75ca4f1664ae6b956fbd1534acaf1
November 15, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice 076066512d9f430388925e5897d632c5
November 26, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice 0808b213aaee4ce1aa82d368d39edc01
December 5, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice 8af779f6c80c40abb959072f822c9c42
December 11, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice 7deba0d10ad54c558371bce4ff5e37e5
December 12, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice 086a44c447774577b985880bedf74bfc
December 16, 2024
Solicitation
Due January 23, 2025 at 7:00 PM EST. SAM.gov, notice 69f792149ec1470589f3902f7da9d1fe
December 16, 2024
Solicitation
Due January 9, 2025 at 7:00 PM EST. SAM.gov, notice 938f9e921ac14126be6b7eee1473fb52
December 19, 2024
Solicitation
Due January 23, 2025 at 7:00 PM EST. SAM.gov, notice 9097404130544ac6bec687b7bdd61624
December 23, 2024
Solicitation
Due January 23, 2025 at 7:00 PM EST. SAM.gov, notice c4b1a95f95894be8bb54bab45cb9930f
January 7, 2025
Solicitation
Due January 23, 2025 at 7:00 PM EST. SAM.gov, notice 22dea131ef28456795edafecd52342c5
26 revisions on SAM
- March 26, 2025: publish, solicitation
- February 7, 2025: publish, solicitation
- February 5, 2025: publish, solicitation
- February 4, 2025: publish, solicitation
- February 3, 2025: publish, solicitation
- October 30, 2024: publish, presolicitation
- January 24, 2025: publish, solicitation
- January 16, 2025: publish, solicitation
- January 15, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- December 24, 2024: publish, solicitation
- December 19, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 13, 2024: publish, solicitation
- December 11, 2024: publish, solicitation
- December 5, 2024: publish, solicitation
- November 26, 2024: publish, solicitation
- November 15, 2024: publish, solicitation
- November 14, 2024: publish, solicitation
- November 8, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
January 7, 2025
Solicitation
Due January 23, 2025 at 7:00 PM EST. SAM.gov, notice 59b328fb3a1f4504a9dae7b2ded1ac5e
26 revisions on SAM
- March 26, 2025: publish, solicitation
- February 7, 2025: publish, solicitation
- February 5, 2025: publish, solicitation
- February 4, 2025: publish, solicitation
- February 3, 2025: publish, solicitation
- October 30, 2024: publish, presolicitation
- January 24, 2025: publish, solicitation
- January 16, 2025: publish, solicitation
- January 15, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- December 24, 2024: publish, solicitation
- December 19, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 13, 2024: publish, solicitation
- December 11, 2024: publish, solicitation
- December 5, 2024: publish, solicitation
- November 26, 2024: publish, solicitation
- November 15, 2024: publish, solicitation
- November 14, 2024: publish, solicitation
- November 8, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
January 15, 2025
Solicitation
Due January 23, 2025 at 7:00 PM EST. SAM.gov, notice b2f6f4b1b4274e1c8c7bdcd737c071a0
26 revisions on SAM
- March 26, 2025: publish, solicitation
- February 7, 2025: publish, solicitation
- February 5, 2025: publish, solicitation
- February 4, 2025: publish, solicitation
- February 3, 2025: publish, solicitation
- October 30, 2024: publish, presolicitation
- January 24, 2025: publish, solicitation
- January 16, 2025: publish, solicitation
- January 15, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- December 24, 2024: publish, solicitation
- December 19, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 13, 2024: publish, solicitation
- December 11, 2024: publish, solicitation
- December 5, 2024: publish, solicitation
- November 26, 2024: publish, solicitation
- November 15, 2024: publish, solicitation
- November 14, 2024: publish, solicitation
- November 8, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
January 16, 2025
Solicitation
Due February 13, 2025 at 7:00 PM EST. SAM.gov, notice d1bb9729a01a4b6182bbeba67d83ef14
26 revisions on SAM
- March 26, 2025: publish, solicitation
- February 7, 2025: publish, solicitation
- February 5, 2025: publish, solicitation
- February 4, 2025: publish, solicitation
- February 3, 2025: publish, solicitation
- October 30, 2024: publish, presolicitation
- January 24, 2025: publish, solicitation
- January 16, 2025: publish, solicitation
- January 15, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- December 24, 2024: publish, solicitation
- December 19, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 13, 2024: publish, solicitation
- December 11, 2024: publish, solicitation
- December 5, 2024: publish, solicitation
- November 26, 2024: publish, solicitation
- November 15, 2024: publish, solicitation
- November 14, 2024: publish, solicitation
- November 8, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
January 24, 2025
Solicitation
Due February 13, 2025 at 7:00 PM EST. SAM.gov, notice 1201bf9953ce43fe89dde54ea214abd2
26 revisions on SAM
- March 26, 2025: publish, solicitation
- February 7, 2025: publish, solicitation
- February 5, 2025: publish, solicitation
- February 4, 2025: publish, solicitation
- February 3, 2025: publish, solicitation
- October 30, 2024: publish, presolicitation
- January 24, 2025: publish, solicitation
- January 16, 2025: publish, solicitation
- January 15, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- December 24, 2024: publish, solicitation
- December 19, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 13, 2024: publish, solicitation
- December 11, 2024: publish, solicitation
- December 5, 2024: publish, solicitation
- November 26, 2024: publish, solicitation
- November 15, 2024: publish, solicitation
- November 14, 2024: publish, solicitation
- November 8, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
February 3, 2025
Solicitation
Due February 13, 2025 at 7:00 PM EST. SAM.gov, notice 7aa4831b1d4043c390eca0a4d13d630d
26 revisions on SAM
- March 26, 2025: publish, solicitation
- February 7, 2025: publish, solicitation
- February 5, 2025: publish, solicitation
- February 4, 2025: publish, solicitation
- February 3, 2025: publish, solicitation
- October 30, 2024: publish, presolicitation
- January 24, 2025: publish, solicitation
- January 16, 2025: publish, solicitation
- January 15, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- December 24, 2024: publish, solicitation
- December 19, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 13, 2024: publish, solicitation
- December 11, 2024: publish, solicitation
- December 5, 2024: publish, solicitation
- November 26, 2024: publish, solicitation
- November 15, 2024: publish, solicitation
- November 14, 2024: publish, solicitation
- November 8, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
February 4, 2025
Solicitation
Due February 13, 2025 at 7:00 PM EST. SAM.gov, notice cd1f06c3d1044b548b35dcdbfe2da77e
26 revisions on SAM
- March 26, 2025: publish, solicitation
- February 7, 2025: publish, solicitation
- February 5, 2025: publish, solicitation
- February 4, 2025: publish, solicitation
- February 3, 2025: publish, solicitation
- October 30, 2024: publish, presolicitation
- January 24, 2025: publish, solicitation
- January 16, 2025: publish, solicitation
- January 15, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- December 24, 2024: publish, solicitation
- December 19, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 13, 2024: publish, solicitation
- December 11, 2024: publish, solicitation
- December 5, 2024: publish, solicitation
- November 26, 2024: publish, solicitation
- November 15, 2024: publish, solicitation
- November 14, 2024: publish, solicitation
- November 8, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
February 5, 2025
Solicitation
Due February 13, 2025 at 7:00 PM EST. SAM.gov, notice 477d82cc5565403c8e4ee44e43ee6535
26 revisions on SAM
- March 26, 2025: publish, solicitation
- February 7, 2025: publish, solicitation
- February 5, 2025: publish, solicitation
- February 4, 2025: publish, solicitation
- February 3, 2025: publish, solicitation
- October 30, 2024: publish, presolicitation
- January 24, 2025: publish, solicitation
- January 16, 2025: publish, solicitation
- January 15, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- December 24, 2024: publish, solicitation
- December 19, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 13, 2024: publish, solicitation
- December 11, 2024: publish, solicitation
- December 5, 2024: publish, solicitation
- November 26, 2024: publish, solicitation
- November 15, 2024: publish, solicitation
- November 14, 2024: publish, solicitation
- November 8, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
February 7, 2025
Solicitation
Due February 13, 2025 at 7:00 PM EST. SAM.gov, notice 83a6249069034eb687e58b884e6eeb42
26 revisions on SAM
- March 26, 2025: publish, solicitation
- February 7, 2025: publish, solicitation
- February 5, 2025: publish, solicitation
- February 4, 2025: publish, solicitation
- February 3, 2025: publish, solicitation
- October 30, 2024: publish, presolicitation
- January 24, 2025: publish, solicitation
- January 16, 2025: publish, solicitation
- January 15, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- December 24, 2024: publish, solicitation
- December 19, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 13, 2024: publish, solicitation
- December 11, 2024: publish, solicitation
- December 5, 2024: publish, solicitation
- November 26, 2024: publish, solicitation
- November 15, 2024: publish, solicitation
- November 14, 2024: publish, solicitation
- November 8, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
March 26, 2025
Solicitation
Due February 13, 2025 at 7:00 PM EST. SAM.gov, notice 4e126876c6ba4bd6aea08f2a12ee1962
27 revisions on SAM
- March 26, 2025: publish, solicitation
- July 3, 2025: publish, award notice
- February 7, 2025: publish, solicitation
- February 5, 2025: publish, solicitation
- February 4, 2025: publish, solicitation
- February 3, 2025: publish, solicitation
- October 30, 2024: publish, presolicitation
- January 24, 2025: publish, solicitation
- January 16, 2025: publish, solicitation
- January 15, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- January 7, 2025: publish, solicitation
- December 24, 2024: publish, solicitation
- December 19, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 17, 2024: publish, solicitation
- December 13, 2024: publish, solicitation
- December 11, 2024: publish, solicitation
- December 5, 2024: publish, solicitation
- November 26, 2024: publish, solicitation
- November 15, 2024: publish, solicitation
- November 14, 2024: publish, solicitation
- November 8, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- November 6, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
- October 31, 2024: publish, solicitation
July 3, 2025
Award notice, originally solicitation
Awarded to Core Tech-Hdcc-Kajima LLC for $295,019,906. SAM.gov, notice f9c952566adc4232b1e3d3910f0e7902
2 revisions on SAM
- March 26, 2025: publish, solicitation
- July 3, 2025: publish, award notice
Points of contact
- Dayna Matsumuradayna.n.matsumura.civ@us.navy.mil8084713694
- Erin Hoeerin.y.hoe.civ@us.navy.mil8084745356