{"canonical":"https://sealedbidder.com/opportunities/n6247324r5227","key":"N6247324R5227","url":"https://sealedbidder.com/opportunities/n6247324r5227","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-08-08T21:00:00Z","first_posted":"2024-02-15","last_posted":"2025-09-12","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE NAVY","office":"NAVFACSYSCOM SOUTHWEST","naics":"237130","psc":"Y1NZ","set_aside":null,"place_state":"CA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"06071","place_county_name":"San Bernardino County","place_city":"0680994","place_city_name":"Twentynine Palms","winner":"CITY LIGHT & POWER, INC.","award_amount":null,"publications":[{"notice_id":"0a0e428e0417453d81cefb261249e01b","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"p","base_type":"p","posted":"2024-02-15","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0a0e428e0417453d81cefb261249e01b/view","enriched":false,"history":[]},{"notice_id":"2566b55d34934367acfb2517ad3109f0","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"p","base_type":"p","posted":"2024-02-15","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2566b55d34934367acfb2517ad3109f0/view","enriched":false,"history":[]},{"notice_id":"62f50fae05e84d3b9601c4611bc4154d","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"p","base_type":"p","posted":"2024-02-15","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/62f50fae05e84d3b9601c4611bc4154d/view","enriched":false,"history":[]},{"notice_id":"8e1b33487355466cb5f130abbfc2810b","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"p","base_type":"p","posted":"2024-03-11","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8e1b33487355466cb5f130abbfc2810b/view","enriched":false,"history":[]},{"notice_id":"326f5ba3e03d4084a4453520fffa85cf","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"p","base_type":"p","posted":"2024-03-22","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/326f5ba3e03d4084a4453520fffa85cf/view","enriched":false,"history":[]},{"notice_id":"f264e710bfc14cae837e64a2b9c850cc","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"p","base_type":"p","posted":"2024-04-03","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f264e710bfc14cae837e64a2b9c850cc/view","enriched":false,"history":[]},{"notice_id":"a0086dc630cf414ba3af840dd8e14faa","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"p","base_type":"p","posted":"2024-04-16","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a0086dc630cf414ba3af840dd8e14faa/view","enriched":false,"history":[]},{"notice_id":"d17d861bf24f4f4aa5c8f0e29d64809d","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"p","posted":"2024-04-22","posted_at":null,"due_at":"2024-05-22T21:00:00Z","due_date":"2024-05-22","cancelled":null,"archived":null,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d17d861bf24f4f4aa5c8f0e29d64809d/view","enriched":false,"history":[]},{"notice_id":"c73479f50ec34bd496d2b6538070363d","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2024-05-02","posted_at":null,"due_at":"2024-05-22T21:00:00Z","due_date":"2024-05-22","cancelled":null,"archived":null,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c73479f50ec34bd496d2b6538070363d/view","enriched":false,"history":[]},{"notice_id":"b1e5edbd3fca42ed8b76682d431477ec","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2024-05-17","posted_at":null,"due_at":"2024-05-22T21:00:00Z","due_date":"2024-05-22","cancelled":null,"archived":null,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b1e5edbd3fca42ed8b76682d431477ec/view","enriched":false,"history":[]},{"notice_id":"d1156d29bbaa4756831ed7e432e002a2","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2024-09-20","posted_at":null,"due_at":"2024-09-27T21:00:00Z","due_date":"2024-09-27","cancelled":null,"archived":null,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d1156d29bbaa4756831ed7e432e002a2/view","enriched":false,"history":[]},{"notice_id":"c232d947ebf74fa1aaf58996591adfa9","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-01-17","posted_at":"2025-01-17T14:31:22.547Z","due_at":"2024-09-27T21:00:00Z","due_date":"2024-09-27","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c232d947ebf74fa1aaf58996591adfa9/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"e3d591e2534d4e039c4ff1c15b644df2","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-01-29","posted_at":"2025-01-29T14:42:07.720Z","due_at":"2024-09-27T21:00:00Z","due_date":"2024-09-27","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e3d591e2534d4e039c4ff1c15b644df2/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"d1c86a46ccd3476688f2e9207cdca4ce","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-03-27","posted_at":"2025-03-27T21:55:22.545Z","due_at":"2025-05-15T21:00:00Z","due_date":"2025-05-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d1c86a46ccd3476688f2e9207cdca4ce/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"d8742233b33149a0b2d1508fd62dd915","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-04-01","posted_at":"2025-04-01T20:44:27.168Z","due_at":"2025-05-15T21:00:00Z","due_date":"2025-05-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d8742233b33149a0b2d1508fd62dd915/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"3389941dc6c046a58fad93ee5a8f8ce8","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-04-02","posted_at":"2025-04-02T13:54:51.934Z","due_at":"2025-05-15T21:00:00Z","due_date":"2025-05-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3389941dc6c046a58fad93ee5a8f8ce8/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"ab6bea1721a340339a22bd9d1f2f8d40","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-04-17","posted_at":"2025-04-17T14:55:05.107Z","due_at":"2025-06-03T21:00:00Z","due_date":"2025-06-03","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ab6bea1721a340339a22bd9d1f2f8d40/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"0806881ecf384071b961f0e489072a90","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-05-08","posted_at":"2025-05-08T23:33:57.695Z","due_at":"2025-06-03T21:00:00Z","due_date":"2025-06-03","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0806881ecf384071b961f0e489072a90/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"a9f1b23f50c04d8099ee8dccc7e75a43","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-05-19","posted_at":"2025-05-19T22:32:39.746Z","due_at":"2025-06-09T21:00:00Z","due_date":"2025-06-09","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a9f1b23f50c04d8099ee8dccc7e75a43/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"1fa1b524da954f5c957c01a24568c468","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-05-20","posted_at":"2025-05-20T16:12:13.428Z","due_at":"2025-06-09T21:00:00Z","due_date":"2025-06-09","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1fa1b524da954f5c957c01a24568c468/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"7a20a9efc1d8411cb1a797fd1d474922","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-05-20","posted_at":"2025-05-20T15:45:58.991Z","due_at":"2025-06-09T21:00:00Z","due_date":"2025-06-09","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7a20a9efc1d8411cb1a797fd1d474922/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"7e816db77e054c6fadc0b045f0fd14de","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-05-29","posted_at":"2025-05-29T22:21:04.241Z","due_at":"2025-06-12T21:00:00Z","due_date":"2025-06-12","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7e816db77e054c6fadc0b045f0fd14de/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"c9327b9449a648e3b1efbf86aebee19d","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-06-04","posted_at":"2025-06-04T21:59:11.279Z","due_at":"2025-06-12T21:00:00Z","due_date":"2025-06-12","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c9327b9449a648e3b1efbf86aebee19d/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"d0f8b8ba6cda4c7f924d69d619af5be3","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-06-05","posted_at":"2025-06-05T23:19:18.902Z","due_at":"2025-06-26T21:00:00Z","due_date":"2025-06-26","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d0f8b8ba6cda4c7f924d69d619af5be3/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"a2d061af0bba4fa19f836d971d7422a5","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-06-24","posted_at":"2025-06-24T17:35:36.971Z","due_at":"2025-07-03T21:00:00Z","due_date":"2025-07-03","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a2d061af0bba4fa19f836d971d7422a5/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"3df05b7a8da14fdfaf49df00968fc83a","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-06-30","posted_at":"2025-06-30T23:22:30.703Z","due_at":"2025-07-15T21:00:00Z","due_date":"2025-07-15","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3df05b7a8da14fdfaf49df00968fc83a/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"d59d023e93204c94a35db9f0027ab99d","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-07-01","posted_at":"2025-07-01T21:47:14.271Z","due_at":"2025-07-15T21:00:00Z","due_date":"2025-07-15","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d59d023e93204c94a35db9f0027ab99d/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"d9fb320e3e464e61ae2d2d35758cceea","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-07-02","posted_at":"2025-07-02T20:54:26.489Z","due_at":"2025-07-22T21:00:00Z","due_date":"2025-07-22","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d9fb320e3e464e61ae2d2d35758cceea/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"3c0be71aa86649eb9e3dd247b95a2030","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-07-15","posted_at":"2025-07-15T17:52:56.270Z","due_at":"2025-08-05T21:00:00Z","due_date":"2025-08-05","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3c0be71aa86649eb9e3dd247b95a2030/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"63e1463fed33450194ad91a15ceaeee0","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-07-21","posted_at":"2025-07-21T19:26:57.195Z","due_at":"2025-10-09T21:00:00Z","due_date":"2025-10-09","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/63e1463fed33450194ad91a15ceaeee0/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"3c9c6d3db9b347b28b817a06d7b40682","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-07-31","posted_at":"2025-07-31T21:23:55.729Z","due_at":"2025-08-08T21:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3c9c6d3db9b347b28b817a06d7b40682/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"53b06c97c2334ee78166586c1018070f","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-08-06","posted_at":"2025-08-06T18:33:49.931Z","due_at":"2025-08-08T21:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/53b06c97c2334ee78166586c1018070f/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"3ab0a4b6cdfa4cff877c876c5907801f","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-08-13","posted_at":"2025-08-13T18:50:01.341Z","due_at":"2025-08-08T21:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3ab0a4b6cdfa4cff877c876c5907801f/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"97f2b3cd34f24b5f818264d49d839e47","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-08-14","posted_at":"2025-08-14T22:28:44.831Z","due_at":"2025-08-08T21:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/97f2b3cd34f24b5f818264d49d839e47/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"b0d3ccb2ea0346749a2549ec3a542042","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-08-14","posted_at":"2025-08-14T22:32:09.605Z","due_at":"2025-08-08T21:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b0d3ccb2ea0346749a2549ec3a542042/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"f6daae7304ef45a0a1e50376d0ea01b1","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-08-21","posted_at":"2025-08-21T19:13:54.587Z","due_at":"2025-08-08T21:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f6daae7304ef45a0a1e50376d0ea01b1/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]},{"notice_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","solicitation_number":"N6247324R5227","notice_type":"o","base_type":"o","posted":"2025-09-12","posted_at":"2025-09-12T20:53:06.453Z","due_at":"2025-08-08T21:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-12-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a7feb8077d0d409f8d1d80bf3b15b5e0/view","enriched":true,"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}]}],"latest_notice_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","first_type":"p","notices":[{"dates":{"posted":"2024-02-15"},"links":{"sam":"https://sam.gov/workspace/contract/opp/0a0e428e0417453d81cefb261249e01b/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Sheena F. Hess","role":"primary","email":"sheena.f.hess.civ@us.navy.mil","phone":"6197054643"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"0a0e428e0417453d81cefb261249e01b","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"8d9d59474c6727576f298b5753c7437f32d63bf744859aad94d8e87ae9d6a29b","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"THIS IS AN UNRESTRICTED COMPETITIVE PROCUREMENT IN ACCORDANCE WITH FAR SUBPART 6.1 FULL AND OPEN COMPETITION. THIS PROJECT IS BEING RE-SOLICITED. This procurement will use the two-phase design-build selection procedures and consists of one (1) solicitation covering both phases. Source Selection procedures will be used with the intent to award a firm-fixed price construction contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), is the most advantageous and offers the best value to the Government. The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 megawatts (MW) of battery energy storage systems (BESS) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The BESS shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the Project P-1238 Construction of Grid Stability & Resiliency 10 MW Battery Energy Storage, Various Buildings at Marine Corps Air Ground Combat Center, Twentynine Palms, California. The BESS shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESSs (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESSs will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems. The Base Proposal Item includes all bonds, management, labor, materials, incidental engineering, equipment, transportation, supervision, and incidental related work to provide design, construction, procurement, and installation services for 10 megawatts (MW) of battery energy storage systems at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The North American Industry Classification System (NAICS) code is 237130, and the annual size standard is $45 million. The estimated price range for design and construction is between $25,000,000 and $100,000,000. The Government intends to evaluate proposals without discussions. Selection for award will be based on evaluation of the following: Phase I: Factor 1 – Technical Approach, Factor 2 – Experience, Factor 3 – Past Performance; Factor 4 –Safety, Phase II: Factor 5 – Technical Solution, Factor 6 – Small Business Participation, Factor 7 – Price The Phase I evaluation will result in a determination of the most highly qualified Offerors. These Offerors will be requested to submit a Phase II proposal. A maximum of five (5) Offerors will be selected to submit a Phase II proposal. THE SOLICITATION WILL BE AVAILABLE IN ELECTRONIC FORMAT ONLY. The Phase I RFP will be posted on the System for Award Management (SAM) website at https://sam.gov/on or around 06 March 2024. No hard copies will be provided. IT IS THE CONTRACTORS RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Plan holders lists will not be e-mailed and will be available only at the website listed above. A pre-proposal conference for Phase I is planned but no site visit will occur until Phase II.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2024-02-15"},"links":{"sam":"https://sam.gov/workspace/contract/opp/2566b55d34934367acfb2517ad3109f0/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Sheena F. Hess","role":"primary","email":"sheena.f.hess.civ@us.navy.mil","phone":"6197054643"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"2566b55d34934367acfb2517ad3109f0","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"6ab59b7701b5d98c538e36bb7b6d0b27e90a8d65a02be386b73b694615b66d05","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"THIS IS AN UNRESTRICTED COMPETITIVE PROCUREMENT IN ACCORDANCE WITH FAR SUBPART 6.1 FULL AND OPEN COMPETITION. THIS PROJECT IS BEING RE-SOLICITED. This procurement will use the two-phase design-build selection procedures and consists of one (1) solicitation covering both phases. Source Selection procedures will be used with the intent to award a firm-fixed price construction contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), is the most advantageous and offers the best value to the Government. The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 megawatts (MW) of battery energy storage systems (BESS) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California.The BESS shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESSs (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESSs will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems. The Base Proposal Item includes all bonds, management, labor, materials, incidental engineering, equipment, transportation, supervision, and incidental related work to provide design, construction, procurement, and installation services for 10 megawatts (MW) of battery energy storage systems at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The North American Industry Classification System (NAICS) code is 237130, and the annual size standard is $45 million. The estimated price range for design and construction is between $25,000,000 and $100,000,000. The Government intends to evaluate proposals without discussions. Selection for award will be based on evaluation of the following: Phase I: Factor 1 – Technical Approach, Factor 2 – Experience, Factor 3 – Past Performance; Factor 4 –Safety, Phase II: Factor 5 – Technical Solution, Factor 6 – Small Business Participation, Factor 7 – Price The Phase I evaluation will result in a determination of the most highly qualified Offerors. These Offerors will be requested to submit a Phase II proposal. A maximum of five (5) Offerors will be selected to submit a Phase II proposal. THE SOLICITATION WILL BE AVAILABLE IN ELECTRONIC FORMAT ONLY. The Phase I RFP will be posted on the System for Award Management (SAM) website at https://sam.gov/on or around 06 March 2024. No hard copies will be provided. IT IS THE CONTRACTORS RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Plan holders lists will not be e-mailed and will be available only at the website listed above. A pre-proposal conference for Phase I is planned but no site visit will occur until Phase II.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2024-02-15"},"links":{"sam":"https://sam.gov/workspace/contract/opp/62f50fae05e84d3b9601c4611bc4154d/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Sheena F. Hess","role":"primary","email":"sheena.f.hess.civ@us.navy.mil","phone":"6197054643"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"62f50fae05e84d3b9601c4611bc4154d","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"58e024566c122f6af0e5302a9fe8c843c585d4b64045095b6448e2f146d77cb8","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"THIS IS AN UNRESTRICTED COMPETITIVE PROCUREMENT IN ACCORDANCE WITH FAR SUBPART 6.1 FULL AND OPEN COMPETITION. THIS PROJECT IS BEING RE-SOLICITED. This procurement will use the two-phase design-build selection procedures and consists of one (1) solicitation covering both phases. Source Selection procedures will be used with the intent to award a firm-fixed price construction contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), is the most advantageous and offers the best value to the Government. The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 megawatts (MW) of battery energy storage systems (BESS) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The BESS shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the Project P-1238 Construction of Grid Stability & Resiliency 10 MW Battery Energy Storage, Various Buildings at Marine Corps Air Ground Combat Center, Twentynine Palms, California Apr 15, 2022 12:03:02 AM GMT 1 installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems. The Base Proposal Item includes all bonds, management, labor, materials, incidental engineering, equipment, transportation, supervision, and incidental related work to provide design, construction, procurement, and installation services for 10 megawatts (MW) of battery energy storage systems at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The North American Industry Classification System (NAICS) code is 237130, and the annual size standard is $45 million. The estimated price range for design and construction is between $25,000,000 and $100,000,000. The Government intends to evaluate proposals without discussions. Selection for award will be based on evaluation of the following: Phase I: Factor 1 – Technical Approach, Factor 2 – Experience, Factor 3 – Past Performance; Factor 4 –Safety, Phase II: Factor 5 – Technical Solution, Factor 6 – Small Business Participation, Factor 7 – Price The Phase I evaluation will result in a determination of the most highly qualified Offerors. These Offerors will be requested to submit a Phase II proposal. A maximum of five (5) Offerors will be selected to submit a Phase II proposal. THE SOLICITATION WILL BE AVAILABLE IN ELECTRONIC FORMAT ONLY. The Phase I RFP will be posted on the System for Award Management (SAM) website at https://sam.gov/on or around 06 March 2024. No hard copies will be provided. IT IS THE CONTRACTORS RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Plan holders lists will not be e-mailed and will be available only at the website listed above. A pre-proposal conference for Phase I is planned but no site visit will occur until Phase II.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2024-03-11"},"links":{"sam":"https://sam.gov/workspace/contract/opp/8e1b33487355466cb5f130abbfc2810b/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Sheena F. Hess","role":"primary","email":"sheena.f.hess.civ@us.navy.mil","phone":"6197054643"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"8e1b33487355466cb5f130abbfc2810b","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"dc7130463115398bded41b9f64a766220fef3d316bf0571a486a13e30fca53d3","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"THIS IS AN UNRESTRICTED COMPETITIVE PROCUREMENT IN ACCORDANCE WITH FAR SUBPART 6.1 FULL AND OPEN COMPETITION. THIS PROJECT IS BEING RE-SOLICITED. This procurement will use the two-phase design-build selection procedures and consists of one (1) solicitation covering both phases. Source Selection procedures will be used with the intent to award a firm-fixed price construction contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), is the most advantageous and offers the best value to the Government. The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 megawatts (MW) of battery energy storage systems (BESS) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California.The BESS shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESSs (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESSs will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems. The Base Proposal Item includes all bonds, management, labor, materials, incidental engineering, equipment, transportation, supervision, and incidental related work to provide design, construction, procurement, and installation services for 10 megawatts (MW) of battery energy storage systems at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The North American Industry Classification System (NAICS) code is 237130, and the annual size standard is $45 million. The estimated price range for design and construction is between $25,000,000 and $100,000,000. The Government intends to evaluate proposals without discussions. Selection for award will be based on evaluation of the following: Phase I: Factor 1 – Technical Approach, Factor 2 – Experience, Factor 3 – Past Performance; Factor 4 –Safety, Phase II: Factor 5 – Technical Solution, Factor 6 – Small Business Participation, Factor 7 – Price The Phase I evaluation will result in a determination of the most highly qualified Offerors. These Offerors will be requested to submit a Phase II proposal. A maximum of five (5) Offerors will be selected to submit a Phase II proposal. THE SOLICITATION WILL BE AVAILABLE IN ELECTRONIC FORMAT ONLY. The Phase I RFP will be posted on the System for Award Management (SAM) website at https://sam.gov/on or around 21 March 2024. No hard copies will be provided. IT IS THE CONTRACTORS RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Plan holders lists will not be e-mailed and will be available only at the website listed above. A pre-proposal conference for Phase I is planned but no site visit will occur until Phase II.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2024-03-22"},"links":{"sam":"https://sam.gov/workspace/contract/opp/326f5ba3e03d4084a4453520fffa85cf/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Sheena F. Hess","role":"primary","email":"sheena.f.hess.civ@us.navy.mil","phone":"6197054643"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"326f5ba3e03d4084a4453520fffa85cf","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"b835e28067f7acb3c7d84928fa22e9638ef61e2ef96d956578f9178cf21f9962","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"THIS IS AN UNRESTRICTED COMPETITIVE PROCUREMENT IN ACCORDANCE WITH FAR SUBPART 6.1 FULL AND OPEN COMPETITION. THIS PROJECT IS BEING RE-SOLICITED. This procurement will use the two-phase design-build selection procedures and consists of one (1) solicitation covering both phases. Source Selection procedures will be used with the intent to award a firm-fixed price construction contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), is the most advantageous and offers the best value to the Government. The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 megawatts (MW) of battery energy storage systems (BESS) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California.The BESS shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESSs (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESSs will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems. The Base Proposal Item includes all bonds, management, labor, materials, incidental engineering, equipment, transportation, supervision, and incidental related work to provide design, construction, procurement, and installation services for 10 megawatts (MW) of battery energy storage systems at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The North American Industry Classification System (NAICS) code is 237130, and the annual size standard is $45 million. The estimated price range for design and construction is between $25,000,000 and $100,000,000. The Government intends to evaluate proposals without discussions. Selection for award will be based on evaluation of the following: Phase I: Factor 1 – Technical Approach, Factor 2 – Experience, Factor 3 – Past Performance; Factor 4 –Safety, Phase II: Factor 5 – Technical Solution, Factor 6 – Small Business Participation, Factor 7 – Price The Phase I evaluation will result in a determination of the most highly qualified Offerors. These Offerors will be requested to submit a Phase II proposal. A maximum of five (5) Offerors will be selected to submit a Phase II proposal. THE SOLICITATION WILL BE AVAILABLE IN ELECTRONIC FORMAT ONLY. The Phase I RFP will be posted on the System for Award Management (SAM) website at https://sam.gov/on or around 29 March 2024. No hard copies will be provided. IT IS THE CONTRACTORS RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Plan holders lists will not be e-mailed and will be available only at the website listed above. A pre-proposal conference for Phase I is planned but no site visit will occur until Phase II.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2024-04-03"},"links":{"sam":"https://sam.gov/workspace/contract/opp/f264e710bfc14cae837e64a2b9c850cc/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Sheena F. Hess","role":"primary","email":"sheena.f.hess.civ@us.navy.mil","phone":"6197054643"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"f264e710bfc14cae837e64a2b9c850cc","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"ab42e0f54680fb4792ea6c60a03cce3d57a22a0df6bcde08c56c527418220d78","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"THIS IS AN UNRESTRICTED COMPETITIVE PROCUREMENT IN ACCORDANCE WITH FAR SUBPART 6.1 FULL AND OPEN COMPETITION. THIS PROJECT IS BEING RE-SOLICITED. This procurement will use the two-phase design-build selection procedures and consists of one (1) solicitation covering both phases. Source Selection procedures will be used with the intent to award a firm-fixed price construction contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), is the most advantageous and offers the best value to the Government. The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 megawatts (MW) of battery energy storage systems (BESS) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California.The BESS shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESSs (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESSs will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems. The Base Proposal Item includes all bonds, management, labor, materials, incidental engineering, equipment, transportation, supervision, and incidental related work to provide design, construction, procurement, and installation services for 10 megawatts (MW) of battery energy storage systems at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The North American Industry Classification System (NAICS) code is 237130, and the annual size standard is $45 million. The estimated price range for design and construction is between $25,000,000 and $100,000,000. The Government intends to evaluate proposals without discussions. Selection for award will be based on evaluation of the following: Phase I: Factor 1 – Technical Approach, Factor 2 – Experience, Factor 3 – Past Performance; Factor 4 –Safety, Phase II: Factor 5 – Technical Solution, Factor 6 – Small Business Participation, Factor 7 – Price The Phase I evaluation will result in a determination of the most highly qualified Offerors. These Offerors will be requested to submit a Phase II proposal. A maximum of five (5) Offerors will be selected to submit a Phase II proposal. THE SOLICITATION WILL BE AVAILABLE IN ELECTRONIC FORMAT ONLY. The Phase I RFP will be posted on the System for Award Management (SAM) website at https://sam.gov/on or around 11 April 2024. No hard copies will be provided. IT IS THE CONTRACTORS RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Plan holders lists will not be e-mailed and will be available only at the website listed above. A pre-proposal conference for Phase I is planned but no site visit will occur until Phase II.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2024-04-16"},"links":{"sam":"https://sam.gov/workspace/contract/opp/a0086dc630cf414ba3af840dd8e14faa/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Sheena F. Hess","role":"primary","email":"sheena.f.hess.civ@us.navy.mil","phone":"6197054643"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"a0086dc630cf414ba3af840dd8e14faa","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"c5f924cb842975ddb87e79a04824566ac31a12fd7c8bddb68210404682aee213","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"THIS IS AN UNRESTRICTED COMPETITIVE PROCUREMENT IN ACCORDANCE WITH FAR SUBPART 6.1 FULL AND OPEN COMPETITION. THIS PROJECT IS BEING RE-SOLICITED. This procurement will use the two-phase design-build selection procedures and consists of one (1) solicitation covering both phases. Source Selection procedures will be used with the intent to award a firm-fixed price construction contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), is the most advantageous and offers the best value to the Government. The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 megawatts (MW) of battery energy storage systems (BESS) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California.The BESS shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESSs (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESSs will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems. The Base Proposal Item includes all bonds, management, labor, materials, incidental engineering, equipment, transportation, supervision, and incidental related work to provide design, construction, procurement, and installation services for 10 megawatts (MW) of battery energy storage systems at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The North American Industry Classification System (NAICS) code is 237130, and the annual size standard is $45 million. The estimated price range for design and construction is between $25,000,000 and $100,000,000. The Government intends to evaluate proposals without discussions. Selection for award will be based on evaluation of the following: Phase I: Factor 1 – Technical Approach, Factor 2 – Experience, Factor 3 – Past Performance; Factor 4 –Safety, Phase II: Factor 5 – Technical Solution, Factor 6 – Small Business Participation, Factor 7 – Price The Phase I evaluation will result in a determination of the most highly qualified Offerors. These Offerors will be requested to submit a Phase II proposal. A maximum of five (5) Offerors will be selected to submit a Phase II proposal. THE SOLICITATION WILL BE AVAILABLE IN ELECTRONIC FORMAT ONLY. The Phase I RFP will be posted on the System for Award Management (SAM) website at https://sam.gov/on or around 22 April 2024. No hard copies will be provided. IT IS THE CONTRACTORS RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Plan holders lists will not be e-mailed and will be available only at the website listed above. A pre-proposal conference for Phase I is planned but no site visit will occur until Phase II.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2024-04-22","response_deadline":{"raw":"2024-05-22T14:00:00-07:00","utc":"2024-05-22T21:00:00Z","date":"2024-05-22","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d17d861bf24f4f4aa5c8f0e29d64809d/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Sheena F. Hess","role":"primary","email":"sheena.f.hess.civ@us.navy.mil","phone":"6197054643"},{"name":"Victor Mariscal","role":"secondary","email":"victor.m.mariscal.civ@us.navy.mil","phone":"6197054657"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"c28532c6d49ad9da1abe9208c201738c554ae1a176135689540e86a15858da32","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of 10 MW (6.5 MW Base Item and 4MW in option items) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the estimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2024-05-02","response_deadline":{"raw":"2024-05-22T14:00:00-07:00","utc":"2024-05-22T21:00:00Z","date":"2024-05-22","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c73479f50ec34bd496d2b6538070363d/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Sheena F. Hess","role":"primary","email":"sheena.f.hess.civ@us.navy.mil","phone":"6197054643"},{"name":"Victor Mariscal","role":"secondary","email":"victor.m.mariscal.civ@us.navy.mil","phone":"6197054657"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c73479f50ec34bd496d2b6538070363d","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"d03c3f65492e0859da09b43d35b05c205772e5a850933c78cdd4a8fbedd0c7b4","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of 10 MW (6.5 MW Base Item and 4MW in option items) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the estimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2024-05-17","response_deadline":{"raw":"2024-05-22T14:00:00-07:00","utc":"2024-05-22T21:00:00Z","date":"2024-05-22","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b1e5edbd3fca42ed8b76682d431477ec/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Victor Mariscal","role":"secondary","email":"victor.m.mariscal.civ@us.navy.mil","phone":"6197054657"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b1e5edbd3fca42ed8b76682d431477ec","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"b31f4711dedea9589168fb45bcb444bb0adbc5d8c124166b749f45a47b35b68d","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 8.5 MW(5.5MW at cogeneration site 1 and 3.0MW at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the estimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2024-09-20","response_deadline":{"raw":"2024-09-27T14:00:00-07:00","utc":"2024-09-27T21:00:00Z","date":"2024-09-27","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d1156d29bbaa4756831ed7e432e002a2/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Victor Mariscal","role":"secondary","email":"victor.m.mariscal.civ@us.navy.mil","phone":"6197054657"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d1156d29bbaa4756831ed7e432e002a2","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"dba294a918e7cdb1a3ca91c723a9f59029f40cf503193d364d6eae706960407d","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 8.5 MW(5.5MW at cogeneration site 1 and 3.0MW at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the estimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"name":"Twentynine Palms"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-01-17","posted_at":"2025-01-17T14:31:22.547Z","created_at":"2025-01-16T19:28:00.462Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2024-09-27T14:00:00-07:00","utc":"2024-09-27T21:00:00Z","date":"2024-09-27","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c232d947ebf74fa1aaf58996591adfa9/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Victor Mariscal","role":"secondary","email":"victor.m.mariscal.civ@us.navy.mil","phone":"6197054657"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c232d947ebf74fa1aaf58996591adfa9","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-25T01:46:23.392740026Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"ba936e064aaa5346adeac4662e48bff32e7c6b798bd90814835cb2a48465f680","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-25T01:46:23.392740026Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build<br />\ncontract for the design and construction of a total of 8.5 MW(5.5MW at cogeneration site 1 and 3.0MW at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nestimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the<br />\nassociated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV)<br />\narrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s<br />\nelectric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the<br />\ninstallation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV<br />\nvariability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and<br />\nislanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy<br />\nmanagement/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber<br />\nsecure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The<br />\nproject installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV<br />\nsystems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build\n\ncontract for the design and construction of a total of 8.5 MW(5.5MW at cogeneration site 1 and 3.0MW at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nestimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the\n\nassociated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV)\n\narrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's\n\nelectric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the\n\ninstallation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV\n\nvariability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and\n\nislanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy\n\nmanagement/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber\n\nsecure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The\n\nproject installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV\n\nsystems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-01-29","posted_at":"2025-01-29T14:42:07.720Z","created_at":"2025-01-29T14:40:58.274Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2024-09-27T14:00:00-07:00","utc":"2024-09-27T21:00:00Z","date":"2024-09-27","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e3d591e2534d4e039c4ff1c15b644df2/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Victor Mariscal","role":"secondary","email":"victor.m.mariscal.civ@us.navy.mil","phone":"6197054657"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e3d591e2534d4e039c4ff1c15b644df2","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-24T03:52:06.820898762Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c953575178136d10390745acc93fda235566d6df23b0e65b6453c33a6c9b5429","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-24T03:52:06.820898762Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build<br />\ncontract for the design and construction of a total of 8.5 MW(5.5MW at cogeneration site 1 and 3.0MW at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nestimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the<br />\nassociated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV)<br />\narrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s<br />\nelectric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the<br />\ninstallation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV<br />\nvariability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and<br />\nislanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy<br />\nmanagement/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber<br />\nsecure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The<br />\nproject installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV<br />\nsystems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build\n\ncontract for the design and construction of a total of 8.5 MW(5.5MW at cogeneration site 1 and 3.0MW at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nestimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the\n\nassociated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV)\n\narrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's\n\nelectric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the\n\ninstallation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV\n\nvariability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and\n\nislanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy\n\nmanagement/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber\n\nsecure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The\n\nproject installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV\n\nsystems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-03-27","posted_at":"2025-03-27T21:55:22.545Z","created_at":"2025-03-27T21:42:39.827Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-05-15T14:00:00-07:00","utc":"2025-05-15T21:00:00Z","date":"2025-05-15","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d1c86a46ccd3476688f2e9207cdca4ce/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d1c86a46ccd3476688f2e9207cdca4ce","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-19T13:52:15.207268529Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"4177a88a0cf97e59ab9c96b18e8b5dee84316329e9eef3a7b703d0cacf64da90","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-19T13:52:15.207268529Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-04-01","posted_at":"2025-04-01T20:44:27.168Z","created_at":"2025-04-01T20:43:10.725Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-05-15T14:00:00-07:00","utc":"2025-05-15T21:00:00Z","date":"2025-05-15","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d8742233b33149a0b2d1508fd62dd915/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d8742233b33149a0b2d1508fd62dd915","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-19T09:34:57.690608380Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"59aecfddf42a0de95c0939dfead5c5c49a3c011c16a5f9bf00edce9c79c43a76","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-19T09:34:57.690608380Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-04-02","posted_at":"2025-04-02T13:54:51.934Z","created_at":"2025-04-02T13:53:21.713Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-05-15T14:00:00-07:00","utc":"2025-05-15T21:00:00Z","date":"2025-05-15","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3389941dc6c046a58fad93ee5a8f8ce8/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3389941dc6c046a58fad93ee5a8f8ce8","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-19T04:24:26.927194004Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"1e3b4acdd6d55f13c1341c89b77979fc902678535b11cc8578446ee3aa332693","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-19T04:24:26.927194004Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-04-17","posted_at":"2025-04-17T14:55:05.107Z","created_at":"2025-04-17T14:50:29.430Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-06-03T14:00:00-07:00","utc":"2025-06-03T21:00:00Z","date":"2025-06-03","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ab6bea1721a340339a22bd9d1f2f8d40/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ab6bea1721a340339a22bd9d1f2f8d40","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T09:55:23.289243315Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f52c529f9f2ab4b2680ce9035535f0be25a848929330bc37a46ea91a36290bc5","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T09:55:23.289243315Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-05-08","posted_at":"2025-05-08T23:33:57.695Z","created_at":"2025-05-08T23:33:09.236Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-06-03T14:00:00-07:00","utc":"2025-06-03T21:00:00Z","date":"2025-06-03","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0806881ecf384071b961f0e489072a90/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"0806881ecf384071b961f0e489072a90","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T09:31:04.355288166Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"e62d4ad83a746c4cd73a810ddec8c28e8589dba2f65d18b96086d13a840af798","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T09:31:04.355288166Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-05-19","posted_at":"2025-05-19T22:32:39.746Z","created_at":"2025-05-19T22:20:54.263Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-06-09T14:00:00-07:00","utc":"2025-06-09T21:00:00Z","date":"2025-06-09","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a9f1b23f50c04d8099ee8dccc7e75a43/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a9f1b23f50c04d8099ee8dccc7e75a43","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T01:12:52.423058375Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"098816ddd3c1f40dccae529d8eee13306f2c3be8e395180393b0141155004821","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T01:12:52.423058375Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-05-20","posted_at":"2025-05-20T16:12:13.428Z","created_at":"2025-05-20T16:11:29.797Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-06-09T14:00:00-07:00","utc":"2025-06-09T21:00:00Z","date":"2025-06-09","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1fa1b524da954f5c957c01a24568c468/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"1fa1b524da954f5c957c01a24568c468","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-14T04:13:40.554260017Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"954856ba94a7a41f4c78550005550d8f6ea21bb34f29dfd805517305661f9d24","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-14T04:13:40.554260017Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-05-20","posted_at":"2025-05-20T15:45:58.991Z","created_at":"2025-05-20T15:45:02.973Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-06-09T14:00:00-07:00","utc":"2025-06-09T21:00:00Z","date":"2025-06-09","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7a20a9efc1d8411cb1a797fd1d474922/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7a20a9efc1d8411cb1a797fd1d474922","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T00:06:23.623474579Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c7433bb900f882b34a129b5e7a4011d93bb32dc73b77047758376d77dc10ef80","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T00:06:23.623474579Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-05-29","posted_at":"2025-05-29T22:21:04.241Z","created_at":"2025-05-29T22:18:38.120Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-06-12T14:00:00-07:00","utc":"2025-06-12T21:00:00Z","date":"2025-06-12","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7e816db77e054c6fadc0b045f0fd14de/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7e816db77e054c6fadc0b045f0fd14de","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T11:05:34.930688687Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"979064af31c84ea71458276a4f3b2df423037a28c51e7e8517bfc6fb8671d2bd","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T11:05:34.930688687Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-06-04","posted_at":"2025-06-04T21:59:11.279Z","created_at":"2025-06-04T21:58:30.929Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-06-12T14:00:00-07:00","utc":"2025-06-12T21:00:00Z","date":"2025-06-12","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c9327b9449a648e3b1efbf86aebee19d/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c9327b9449a648e3b1efbf86aebee19d","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T04:44:21.342167602Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"1e966c04a5bdfdae460e6cd4efcef8f241158fbda894a62069aafea8b0a3f5ec","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T04:44:21.342167602Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-06-05","posted_at":"2025-06-05T23:19:18.902Z","created_at":"2025-06-05T23:17:22.300Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-06-26T14:00:00-07:00","utc":"2025-06-26T21:00:00Z","date":"2025-06-26","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d0f8b8ba6cda4c7f924d69d619af5be3/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d0f8b8ba6cda4c7f924d69d619af5be3","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T03:58:53.747958166Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c526e13eb221fe73be486437f508c99824a0a35c085a44e145af7794e5c9b039","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T03:58:53.747958166Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-06-24","posted_at":"2025-06-24T17:35:36.971Z","created_at":"2025-06-24T17:33:11.728Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-07-03T14:00:00-07:00","utc":"2025-07-03T21:00:00Z","date":"2025-07-03","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a2d061af0bba4fa19f836d971d7422a5/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a2d061af0bba4fa19f836d971d7422a5","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T02:12:35.286492913Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"2ce70db44344511f158069623fdc626fedddda3d3d7dddcf09e11348f3b34098","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-12T02:12:35.286492913Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-06-30","posted_at":"2025-06-30T23:22:30.703Z","created_at":"2025-06-30T23:21:06.458Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-07-15T14:00:00-07:00","utc":"2025-07-15T21:00:00Z","date":"2025-07-15","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3df05b7a8da14fdfaf49df00968fc83a/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3df05b7a8da14fdfaf49df00968fc83a","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T15:26:20.969917959Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7d48467ecd487d76ca876fee65858e7fdb0b7695db1cc29ad7a105bcf22fb01e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-11T15:26:20.969917959Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-07-01","posted_at":"2025-07-01T21:47:14.271Z","created_at":"2025-07-01T21:44:50.770Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-07-15T14:00:00-07:00","utc":"2025-07-15T21:00:00Z","date":"2025-07-15","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d59d023e93204c94a35db9f0027ab99d/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d59d023e93204c94a35db9f0027ab99d","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T14:41:39.442540822Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"892cfce69df31d55057d109e0b5a5ff2b39d5129c506a756bc6d38fec2d6dfcd","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-11T14:41:39.442540822Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-07-02","posted_at":"2025-07-02T20:54:26.489Z","created_at":"2025-07-02T20:53:25.817Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-07-22T14:00:00-07:00","utc":"2025-07-22T21:00:00Z","date":"2025-07-22","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d9fb320e3e464e61ae2d2d35758cceea/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d9fb320e3e464e61ae2d2d35758cceea","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T13:12:50.928876897Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"2d5a1a56f711701d3507cb5adf356021d7a39851dd6bef7b130a7f0dae92925d","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-11T13:12:50.928876897Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-07-15","posted_at":"2025-07-15T17:52:56.270Z","created_at":"2025-07-15T17:50:55.048Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-08-05T14:00:00-07:00","utc":"2025-08-05T21:00:00Z","date":"2025-08-05","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3c0be71aa86649eb9e3dd247b95a2030/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3c0be71aa86649eb9e3dd247b95a2030","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-10T01:07:36.583142225Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8f203e26e26646aa35deaec1b0e5a7e0b5ce5d653fb4f2aaa99176a7fd212e86","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-10T01:07:36.583142225Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-07-21","posted_at":"2025-07-21T19:26:57.195Z","created_at":"2025-07-21T19:23:35.525Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-10-09T14:00:00-07:00","utc":"2025-10-09T21:00:00Z","date":"2025-10-09","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/63e1463fed33450194ad91a15ceaeee0/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"63e1463fed33450194ad91a15ceaeee0","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-09T01:04:40.243692634Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a9edb505a5457852294720c8f4840902bd39f6ffa067e49d2e54df21b0ca18d7","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-09T01:04:40.243692634Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-07-31","posted_at":"2025-07-31T21:23:55.729Z","created_at":"2025-07-31T21:19:23.379Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-08-08T14:00:00-07:00","utc":"2025-08-08T21:00:00Z","date":"2025-08-08","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3c9c6d3db9b347b28b817a06d7b40682/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3c9c6d3db9b347b28b817a06d7b40682","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-06T04:00:12.246683214Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a355e634e1b8f35eaaa114418e5f90d6c4ed79ae3248a909ccbbeba540fc7f41","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-06T04:00:12.246683214Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-08-06","posted_at":"2025-08-06T18:33:49.931Z","created_at":"2025-08-06T18:30:43.718Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-08-08T14:00:00-07:00","utc":"2025-08-08T21:00:00Z","date":"2025-08-08","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/53b06c97c2334ee78166586c1018070f/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"53b06c97c2334ee78166586c1018070f","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-05T03:44:11.738607849Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f0d60fd0db32e359a2cf2fed0177e4a44a610dda11d3a5e6a05837253687f33f","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-05T03:44:11.738607849Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-08-13","posted_at":"2025-08-13T18:50:01.341Z","created_at":"2025-08-13T18:48:18.805Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-08-08T14:00:00-07:00","utc":"2025-08-08T21:00:00Z","date":"2025-08-08","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3ab0a4b6cdfa4cff877c876c5907801f/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3ab0a4b6cdfa4cff877c876c5907801f","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-04T01:45:04.073080285Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"b065064cb59361744ec871cea68c4cfe5f3e9cd809bc7553b512333afb3bd066","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-04T01:45:04.073080285Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-08-14","posted_at":"2025-08-14T22:28:44.831Z","created_at":"2025-08-14T22:26:48.639Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-08-08T14:00:00-07:00","utc":"2025-08-08T21:00:00Z","date":"2025-08-08","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/97f2b3cd34f24b5f818264d49d839e47/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"97f2b3cd34f24b5f818264d49d839e47","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-04T00:36:30.403043044Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"e69a588aa7c431a4ee1908da93a57678ff80399cd2f9138243a0852560b00a38","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-04T00:36:30.403043044Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-08-14","posted_at":"2025-08-14T22:32:09.605Z","created_at":"2025-08-14T22:30:49.761Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-08-08T14:00:00-07:00","utc":"2025-08-08T21:00:00Z","date":"2025-08-08","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b0d3ccb2ea0346749a2549ec3a542042/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b0d3ccb2ea0346749a2549ec3a542042","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-04T00:47:06.151135387Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"05afc82c035bcb098b0f09d97b7197503116270edea0c7533193d18ec5360332","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-04T00:47:06.151135387Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-08-21","posted_at":"2025-08-21T19:13:54.587Z","created_at":"2025-08-21T19:08:54.239Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-08-08T14:00:00-07:00","utc":"2025-08-08T21:00:00Z","date":"2025-08-08","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f6daae7304ef45a0a1e50376d0ea01b1/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f6daae7304ef45a0a1e50376d0ea01b1","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-03T03:40:41.288348349Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f14603403b52858ad4bf9b3257599ef232a04387593e4b61c9153e730af7fbfe","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-03T03:40:41.288348349Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-09-12","posted_at":"2025-09-12T20:53:06.453Z","created_at":"2025-09-12T20:49:32.832Z","modified_at":"2026-01-01T04:55:46.112Z","response_deadline":{"raw":"2025-08-08T14:00:00-07:00","utc":"2025-08-08T21:00:00Z","date":"2025-08-08","time":"14:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a7feb8077d0d409f8d1d80bf3b15b5e0/view"},"naics":{"codes":["237130"],"primary":"237130"},"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","agency":{"office":{"code":"N62473","name":"NAVFACSYSCOM SOUTHWEST"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"organization_id":"500045870","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-31","archive_type":"auto_custom"},"history":[{"index":33,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-12T20:53:06.453Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":31,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T19:13:54.587Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f6daae7304ef45a0a1e50376d0ea01b1","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":30,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:32:09.605Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b0d3ccb2ea0346749a2549ec3a542042","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":29,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-14T22:28:44.831Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f2b3cd34f24b5f818264d49d839e47","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":28,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-13T18:50:01.341Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3ab0a4b6cdfa4cff877c876c5907801f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":27,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T18:33:49.931Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"53b06c97c2334ee78166586c1018070f","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":26,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:23:55.729Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c9c6d3db9b347b28b817a06d7b40682","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":25,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T19:26:57.195Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"63e1463fed33450194ad91a15ceaeee0","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":24,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-15T17:52:56.270Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3c0be71aa86649eb9e3dd247b95a2030","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":23,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T20:54:26.489Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d9fb320e3e464e61ae2d2d35758cceea","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":22,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T21:47:14.271Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d59d023e93204c94a35db9f0027ab99d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":21,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-30T23:22:30.703Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3df05b7a8da14fdfaf49df00968fc83a","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":20,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-24T17:35:36.971Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a2d061af0bba4fa19f836d971d7422a5","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":19,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T23:19:18.902Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d0f8b8ba6cda4c7f924d69d619af5be3","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":18,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-04T21:59:11.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c9327b9449a648e3b1efbf86aebee19d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":17,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T22:21:04.241Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e816db77e054c6fadc0b045f0fd14de","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":16,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T16:12:13.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1fa1b524da954f5c957c01a24568c468","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":15,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T15:45:58.991Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7a20a9efc1d8411cb1a797fd1d474922","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":14,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T22:32:39.746Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a9f1b23f50c04d8099ee8dccc7e75a43","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":13,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-08T23:33:57.695Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"0806881ecf384071b961f0e489072a90","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":12,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T14:55:05.107Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ab6bea1721a340339a22bd9d1f2f8d40","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":11,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T13:54:51.934Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3389941dc6c046a58fad93ee5a8f8ce8","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":10,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-01T20:44:27.168Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8742233b33149a0b2d1508fd62dd915","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":9,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-27T21:55:22.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1c86a46ccd3476688f2e9207cdca4ce","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":8,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-29T14:42:07.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e3d591e2534d4e039c4ff1c15b644df2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":7,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T14:31:22.547Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c232d947ebf74fa1aaf58996591adfa9","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":6,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-16T22:50:25.678Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a0086dc630cf414ba3af840dd8e14faa","solicitation_number":"N6247324R5227","parent_opportunity_id":"62f50fae05e84d3b9601c4611bc4154d"},{"index":5,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-20T22:07:15.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d1156d29bbaa4756831ed7e432e002a2","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":4,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-17T14:12:17.359Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b1e5edbd3fca42ed8b76682d431477ec","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":3,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-05-02T21:59:17.908Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c73479f50ec34bd496d2b6538070363d","solicitation_number":"N6247324R5227","parent_opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"},{"index":2,"title":"P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-04-23T00:13:46.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d17d861bf24f4f4aa5c8f0e29d64809d","solicitation_number":"N6247324R5227","related_opportunity_id":"a0086dc630cf414ba3af840dd8e14faa"}],"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","lineage_id":"d17d861bf24f4f4aa5c8f0e29d64809d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-30T03:29:03.679351404Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a93fdb24421d653e0c2d033bee9e3bd9a3beacdd866bd99090dd078fc1861499","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-30T03:29:03.679351404Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N6247324R5227","place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NZ"}],"due_at":"2025-08-08T21:00:00Z","due_date":"2025-08-08","closes_at":"2025-08-08T21:00:00Z","awardable":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62473","office_name":"NAVFACSYSCOM SOUTHWEST","state":"CA","county":"06071","county_name":"San Bernardino County","city":"0680994","city_name":"Twentynine Palms","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"NAJMSTQC7D75","amount":null,"linked_awards":37,"cancelled":false,"archived":true,"updated_at":"2026-10-30T03:41:17.879115Z","principal_notice_id":"a7feb8077d0d409f8d1d80bf3b15b5e0","description":{"text":"This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the\n\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.","html":"<p>This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the<br />\nBESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation&#39;s electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation&#39;s microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.</p>","origin":"detail"},"contacts":[{"name":"Kathryn Cranford","role":"primary","email":"kathryn.r.cranford.civ@us.navy.mil","phone":"6197054644"},{"name":"Jaime Flores","role":"secondary","email":"jaime.r.flores4.civ@us.navy.mil","phone":"6197054873"}],"place_of_performance":{"zip":"92277","city":{"code":"80994","name":"Twentynine Palms"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"92132-0001","city":"SAN DIEGO","state":"CA","country":"USA"},"naics_codes":["237130"],"award":null,"attachments":[{"resource_id":"fffa849f48a541f7b9f629f213cd212d","name":"N6247324R5227_FINAL_22APR 24.pdf","kind":"file","mime_type":".pdf","size_bytes":1440567,"posted_at":"2024-04-23T00:13:46.577Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fffa849f48a541f7b9f629f213cd212d/download","mirrored":false},{"resource_id":"37f59c846a254714bd27e2a0d0de216a","name":"EXHIBIT A_5227.pdf","kind":"file","mime_type":".pdf","size_bytes":295835,"posted_at":"2024-04-23T00:13:46.577Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/37f59c846a254714bd27e2a0d0de216a/download","mirrored":false},{"resource_id":"d736f897330f4405b52ac347b4410f7a","name":"EXHIBIT B_5227.pdf","kind":"file","mime_type":".pdf","size_bytes":359772,"posted_at":"2024-04-23T00:13:46.577Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d736f897330f4405b52ac347b4410f7a/download","mirrored":false},{"resource_id":"dcd4e489304d415fa060fab73715464d","name":"EXHIBIT C_5227.pdf","kind":"file","mime_type":".pdf","size_bytes":1620088,"posted_at":"2024-04-23T00:13:46.577Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dcd4e489304d415fa060fab73715464d/download","mirrored":false},{"resource_id":"23b3b8d2aa2e400982fdd812af2d388e","name":"EXHIBIT D_5227.pdf","kind":"file","mime_type":".pdf","size_bytes":342715,"posted_at":"2024-04-23T00:13:46.577Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/23b3b8d2aa2e400982fdd812af2d388e/download","mirrored":false},{"resource_id":"b8287f498ecf4488a82376901c1572ea","name":"EXHIBIT E_5227.pdf","kind":"file","mime_type":".pdf","size_bytes":335388,"posted_at":"2024-04-23T00:13:46.577Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b8287f498ecf4488a82376901c1572ea/download","mirrored":false},{"resource_id":"56da1c077add456c973ec4fe6417f0a0","name":"EXHIBIT F_ 5227.pdf","kind":"file","mime_type":".pdf","size_bytes":306936,"posted_at":"2024-04-23T00:13:46.577Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/56da1c077add456c973ec4fe6417f0a0/download","mirrored":false},{"resource_id":"f3a62c0fbd7e41049170225d6f46d43c","name":"RFI FORM N6247322R5227.xlsx","kind":"file","mime_type":".xlsx","size_bytes":18354,"posted_at":"2024-04-23T00:13:46.577Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f3a62c0fbd7e41049170225d6f46d43c/download","mirrored":false},{"resource_id":"4b7013828ee04d51a2d99f36b5352815","name":"AMENDMENT 0001_P1238_24R5227_FINAL.pdf","kind":"file","mime_type":".pdf","size_bytes":730317,"posted_at":"2024-05-02T21:59:17.908Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4b7013828ee04d51a2d99f36b5352815/download","mirrored":false},{"resource_id":"5d8ab612f18740f9b8e7afa8215ddbdc","name":"RFI RESPONSES_ N6247322R5227_02MAY24.xlsx","kind":"file","mime_type":".xlsx","size_bytes":20450,"posted_at":"2024-05-02T21:59:17.908Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5d8ab612f18740f9b8e7afa8215ddbdc/download","mirrored":false},{"resource_id":"8af747893d7d447b99e3154e05df0e31","name":"AMENDMENT 0002_24R5227_FINAL.pdf","kind":"file","mime_type":".pdf","size_bytes":405813,"posted_at":"2024-05-17T14:12:17.359Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8af747893d7d447b99e3154e05df0e31/download","mirrored":false},{"resource_id":"ffb3bf0273af41e8aab3dcac0725788c","name":"AMENDMENT 0002_EXHIBITS_ATTACHMENTS_24RF5227.zip","kind":"file","mime_type":".zip","size_bytes":3511202,"posted_at":"2024-05-17T14:12:17.359Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ffb3bf0273af41e8aab3dcac0725788c/download","mirrored":false},{"resource_id":"8307249a555f44b682ff8f86ad29fa8a","name":"RFI_RESPONSES_N6247322R5227_16MAY24_FINAL.xlsx","kind":"file","mime_type":".xlsx","size_bytes":25371,"posted_at":"2024-05-17T14:12:17.359Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8307249a555f44b682ff8f86ad29fa8a/download","mirrored":false},{"resource_id":"fb0332b145134576ac6409a7779174ee","name":"EXHIBIT B_Construction Design Controls System Experience Project Data Sheet.pdf","kind":"file","mime_type":".pdf","size_bytes":359772,"posted_at":"2024-09-20T22:07:15.720Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fb0332b145134576ac6409a7779174ee/download","mirrored":false},{"resource_id":"d3b86032b5ae4b87b7a46c0843c403e7","name":"Amendment 0003.pdf","kind":"file","mime_type":".pdf","size_bytes":627908,"posted_at":"2024-09-20T22:07:15.720Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d3b86032b5ae4b87b7a46c0843c403e7/download","mirrored":false},{"resource_id":"2a23a65343614118b40f4c13a308aba7","name":"WD CA20240026-09-06-2024.pdf","kind":"file","mime_type":".pdf","size_bytes":153326,"posted_at":"2024-09-20T22:07:15.720Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2a23a65343614118b40f4c13a308aba7/download","mirrored":false},{"resource_id":"369ef96d268d4631a5c186c07afa81ee","name":"AMENDMENT 0004 Opening Discussions.pdf","kind":"file","mime_type":".pdf","size_bytes":227208,"posted_at":"2025-01-17T14:31:22.547Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/369ef96d268d4631a5c186c07afa81ee/download","mirrored":false},{"resource_id":"cc51eb8d0af749a78e0d773bbf8d909c","name":"AMENDMENT 0005 Close Discussions and Request FRPs.pdf","kind":"file","mime_type":".pdf","size_bytes":186232,"posted_at":"2025-01-29T14:42:07.720Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cc51eb8d0af749a78e0d773bbf8d909c/download","mirrored":false},{"resource_id":"37edcb7a72594107a301e9703991f633","name":"N6247324R5227_Amendment 0006.pdf","kind":"file","mime_type":".pdf","size_bytes":678951,"posted_at":"2025-03-27T21:55:22.545Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/37edcb7a72594107a301e9703991f633/download","mirrored":false},{"resource_id":"a9e2ecafc84d4b6a8f6e1a67f356630b","name":"Phase Two Enclosure 1 - P1238_RFP Part 1.pdf","kind":"file","mime_type":".pdf","size_bytes":191532,"posted_at":"2025-03-27T21:55:22.545Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a9e2ecafc84d4b6a8f6e1a67f356630b/download","mirrored":false},{"resource_id":"3cf34fdf70fa417bad0a9c912aa7c137","name":"Phase Two Enclosure 4 - P1238_RFI Submission Form.xlsx","kind":"file","mime_type":".xlsx","size_bytes":18403,"posted_at":"2025-03-27T21:55:22.545Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3cf34fdf70fa417bad0a9c912aa7c137/download","mirrored":false},{"resource_id":"a4a8e08451c644778d9f01bb938cb6e8","name":"Phase Two Enclosure 5 - P1238_Wage Determination CA20250017.pdf","kind":"file","mime_type":".pdf","size_bytes":266839,"posted_at":"2025-03-27T21:55:22.545Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a4a8e08451c644778d9f01bb938cb6e8/download","mirrored":false},{"resource_id":"b6885bfbd7cc484f91eb2c1ec4e17e1d","name":"Phase Two Enclosure 3 - P1238_Blank_OfferSchedule.xlsx","kind":"file","mime_type":".xlsx","size_bytes":17124,"posted_at":"2025-03-27T21:55:22.545Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b6885bfbd7cc484f91eb2c1ec4e17e1d/download","mirrored":false},{"resource_id":"808c8ac6ec19424ca4478b81120f7f9f","name":"N6247324R5227 Amendment 0007.pdf","kind":"file","mime_type":".pdf","size_bytes":163035,"posted_at":"2025-04-01T20:44:27.168Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/808c8ac6ec19424ca4478b81120f7f9f/download","mirrored":false},{"resource_id":"9774391fb0d5469ba4c9bfcfb2a01f0e","name":"Phase Two Enclosure 1 - P1238_RFP Part 1_Revised 01APR25.pdf","kind":"file","mime_type":".pdf","size_bytes":191755,"posted_at":"2025-04-01T20:44:27.168Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9774391fb0d5469ba4c9bfcfb2a01f0e/download","mirrored":false},{"resource_id":"2b5499e92298454484d6eabf792b234b","name":"N6247324R5227_Amendment 0008.pdf","kind":"file","mime_type":".pdf","size_bytes":154792,"posted_at":"2025-04-02T13:54:51.934Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2b5499e92298454484d6eabf792b234b/download","mirrored":false},{"resource_id":"5f8fa84121ae43e2aec963f38e5bad06","name":"Phase Two Enclosure 1 - P1238_RFP Part 1_Revision 2_02APR2025.pdf","kind":"file","mime_type":".pdf","size_bytes":187706,"posted_at":"2025-04-02T13:54:51.934Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5f8fa84121ae43e2aec963f38e5bad06/download","mirrored":false},{"resource_id":"125b1cd46b5148aca92d8c6de52a3a17","name":"N6247324R5227_Amendment 0009_SF30.pdf","kind":"file","mime_type":".pdf","size_bytes":309466,"posted_at":"2025-04-17T14:55:05.107Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/125b1cd46b5148aca92d8c6de52a3a17/download","mirrored":false},{"resource_id":"d7ed854bd76a4c94a7b152b744136a8f","name":"Phase Two Enclosure 1_P1238_RFP Part 1_Revised.pdf","kind":"file","mime_type":".pdf","size_bytes":190803,"posted_at":"2025-04-17T14:55:05.107Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d7ed854bd76a4c94a7b152b744136a8f/download","mirrored":false},{"resource_id":"0509105e05e44b538305351c7b6d1cb9","name":"Phase Two Enclosure 3_P1238_Blank_OfferSchedule_Revised.xlsx","kind":"file","mime_type":".xlsx","size_bytes":17498,"posted_at":"2025-04-17T14:55:05.107Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0509105e05e44b538305351c7b6d1cb9/download","mirrored":false},{"resource_id":"4b357d89c37b4685b09dfc92f15e5893","name":"EXHIBIT E_P1238_Historical Small Business Utilization.pdf","kind":"file","mime_type":".pdf","size_bytes":335388,"posted_at":"2025-04-17T14:55:05.107Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4b357d89c37b4685b09dfc92f15e5893/download","mirrored":false},{"resource_id":"ae61ec6ba9794ecbb814add65c39af7f","name":"Revised Standard Form (SF) 1442_P1238_N6247324R5227.pdf","kind":"file","mime_type":".pdf","size_bytes":1665469,"posted_at":"2025-04-17T14:55:05.107Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ae61ec6ba9794ecbb814add65c39af7f/download","mirrored":false},{"resource_id":"ec58860394c9410bbf7417119cdf9d83","name":"P1238_RFI Submission Form_Responses_17APR2025.xlsx","kind":"file","mime_type":".xlsx","size_bytes":38760,"posted_at":"2025-04-17T14:55:05.107Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ec58860394c9410bbf7417119cdf9d83/download","mirrored":false},{"resource_id":"5f6c20ceea42413dbb4c6c96e97ce765","name":"P1238_N6247322R5227_RFI_Submission - Non-Amendment Responses_08MAY25.xlsx","kind":"file","mime_type":".xlsx","size_bytes":67596,"posted_at":"2025-05-08T23:33:57.695Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5f6c20ceea42413dbb4c6c96e97ce765/download","mirrored":false},{"resource_id":"ccae8617926c4e2c852c8e37aa0e2b0f","name":"Amendment 0010_P1238_RFI Responses_19MAY25.pdf","kind":"file","mime_type":".pdf","size_bytes":186860,"posted_at":"2025-05-19T22:32:39.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ccae8617926c4e2c852c8e37aa0e2b0f/download","mirrored":false},{"resource_id":"44bb7aaa7a1f4b95a4d77c1c01bb8196","name":"ENCL A_ESR_A10_P1238.pdf","kind":"file","mime_type":".pdf","size_bytes":127678,"posted_at":"2025-05-19T22:32:39.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/44bb7aaa7a1f4b95a4d77c1c01bb8196/download","mirrored":false},{"resource_id":"18dc2d41d7474992adc50a33398c73ea","name":"ENCL B_ESR_D20_P1238.pdf","kind":"file","mime_type":".pdf","size_bytes":122839,"posted_at":"2025-05-19T22:32:39.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/18dc2d41d7474992adc50a33398c73ea/download","mirrored":false},{"resource_id":"d644a91ecf5a4b34b0ced4a12e42c26e","name":"ENCL D_Utilities_P1238.pdf","kind":"file","mime_type":".pdf","size_bytes":7651542,"posted_at":"2025-05-19T22:32:39.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d644a91ecf5a4b34b0ced4a12e42c26e/download","mirrored":false},{"resource_id":"35c217cd430c4978b19b495693e170f8","name":"ENCL E_2a- P-495 Geotech Report 1999-01-19.pdf","kind":"file","mime_type":".pdf","size_bytes":622188,"posted_at":"2025-05-19T22:32:39.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/35c217cd430c4978b19b495693e170f8/download","mirrored":false},{"resource_id":"4333e316ab0f422ea5a49c940c9a93a7","name":"ENCL F_Geotech Report.pdf","kind":"file","mime_type":".pdf","size_bytes":7338708,"posted_at":"2025-05-19T22:32:39.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4333e316ab0f422ea5a49c940c9a93a7/download","mirrored":false},{"resource_id":"85d8c9fa88ef4b6db7bc635ea9b7ab2d","name":"ENCL G_EXHIBIT E_P1238_Historical Small Business Utilization.docx","kind":"file","mime_type":".docx","size_bytes":25367,"posted_at":"2025-05-19T22:32:39.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/85d8c9fa88ef4b6db7bc635ea9b7ab2d/download","mirrored":false},{"resource_id":"3420d4967db942b885e662aa88e1ccf4","name":"ENCL H_EXHIBIT F_P1238_Small Business Participation Commitment.docx","kind":"file","mime_type":".docx","size_bytes":12335,"posted_at":"2025-05-19T22:32:39.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3420d4967db942b885e662aa88e1ccf4/download","mirrored":false},{"resource_id":"492c96a5b1044b8b9e6f8317d14c9acb","name":"ENCL J_UFGS 01 91 00.15-DBContract_P1238.pdf","kind":"file","mime_type":".pdf","size_bytes":138980,"posted_at":"2025-05-19T22:32:39.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/492c96a5b1044b8b9e6f8317d14c9acb/download","mirrored":false},{"resource_id":"b79c4c31bc9a4323ba1fb299d6edd8a9","name":"ENCL K_P1238_N6247324R5227_RFI_Responses_Amendment 0010.xlsx","kind":"file","mime_type":".xlsx","size_bytes":111010,"posted_at":"2025-05-19T22:32:39.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b79c4c31bc9a4323ba1fb299d6edd8a9/download","mirrored":false},{"resource_id":"46186a315f814c7f8d4218ed321fcbba","name":"ENCL C_ESR_D30_P1238.pdf","kind":"file","mime_type":".pdf","size_bytes":85683,"posted_at":"2025-05-20T15:45:58.991Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/46186a315f814c7f8d4218ed321fcbba/download","mirrored":false},{"resource_id":"c882bc60798f4cf28e53a550f77e1189","name":"Amendment 0011_P1238_29MAY25.pdf","kind":"file","mime_type":".pdf","size_bytes":123626,"posted_at":"2025-05-29T22:21:04.241Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c882bc60798f4cf28e53a550f77e1189/download","mirrored":false},{"resource_id":"1940833396da4023852e511bc058674a","name":"Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0011_Revised 29MAY25.pdf","kind":"file","mime_type":".pdf","size_bytes":187266,"posted_at":"2025-05-29T22:21:04.241Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1940833396da4023852e511bc058674a/download","mirrored":false},{"resource_id":"70d9635ae80c40bc81e4476f78abf55f","name":"Wage Determination_CA20250017_Modification 8_29MAY25.pdf","kind":"file","mime_type":".pdf","size_bytes":267460,"posted_at":"2025-05-29T22:21:04.241Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/70d9635ae80c40bc81e4476f78abf55f/download","mirrored":false},{"resource_id":"b72e902325c042ef955b14b24b7ab6e8","name":"PLA Request for Information N6247324R5227.docx","kind":"file","mime_type":".docx","size_bytes":37745,"posted_at":"2025-06-04T21:59:11.279Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b72e902325c042ef955b14b24b7ab6e8/download","mirrored":false},{"resource_id":"8be042296d414042a50c4c1df0da0776","name":"Amendment 0012_P1238_05JUN25.pdf","kind":"file","mime_type":".pdf","size_bytes":115063,"posted_at":"2025-06-05T23:19:18.902Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8be042296d414042a50c4c1df0da0776/download","mirrored":false},{"resource_id":"ecfd404769d14c2ba31f65f17239f192","name":"Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0012_Revised 05JUN25.pdf","kind":"file","mime_type":".pdf","size_bytes":179751,"posted_at":"2025-06-05T23:19:18.902Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ecfd404769d14c2ba31f65f17239f192/download","mirrored":false},{"resource_id":"166d1d80b6f24287967a9f4e15bf0965","name":"Phase Two Enclosure 3 - P1238_Blank_OfferSchedule_Revised 04JUN25.xlsx","kind":"file","mime_type":".xlsx","size_bytes":17923,"posted_at":"2025-06-05T23:19:18.902Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/166d1d80b6f24287967a9f4e15bf0965/download","mirrored":false},{"resource_id":"09a55baa38384d2b8a0efa7cb21a35dc","name":"Amendment 0013_P1238_24JUN25.pdf","kind":"file","mime_type":".pdf","size_bytes":117837,"posted_at":"2025-06-24T17:35:36.971Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/09a55baa38384d2b8a0efa7cb21a35dc/download","mirrored":false},{"resource_id":"435b59902bcc4762836c27a1f2bd8808","name":"Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0013_Revised 24JUN25.pdf","kind":"file","mime_type":".pdf","size_bytes":187189,"posted_at":"2025-06-24T17:35:36.971Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/435b59902bcc4762836c27a1f2bd8808/download","mirrored":false},{"resource_id":"b13783b0e8124645986af23b40df283d","name":"Wage Determination CA 20250026 dated 06062025.pdf","kind":"file","mime_type":".pdf","size_bytes":212683,"posted_at":"2025-06-24T17:35:36.971Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b13783b0e8124645986af23b40df283d/download","mirrored":false},{"resource_id":"71f43daf022c43f7a87ae6e6c1fe909b","name":"Amendment 0014_P1238_30JUN25.pdf","kind":"file","mime_type":".pdf","size_bytes":201469,"posted_at":"2025-06-30T23:22:30.703Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/71f43daf022c43f7a87ae6e6c1fe909b/download","mirrored":false},{"resource_id":"1b6910333211498992e3fb1d0f4c21a3","name":"Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0014_Revised 30JUN25.pdf","kind":"file","mime_type":".pdf","size_bytes":187523,"posted_at":"2025-06-30T23:22:30.703Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1b6910333211498992e3fb1d0f4c21a3/download","mirrored":false},{"resource_id":"b549ee2424fd47fface1c42932191ff1","name":"Section 00 45 00 Reps and Certs_24R5227_AMEND 0014.docx","kind":"file","mime_type":".docx","size_bytes":51748,"posted_at":"2025-06-30T23:22:30.703Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b549ee2424fd47fface1c42932191ff1/download","mirrored":false},{"resource_id":"4f83761d1b1e479c8fa0f2540997010e","name":"Amendment 0015_P1238_01JUL25.pdf","kind":"file","mime_type":".pdf","size_bytes":207450,"posted_at":"2025-07-01T21:47:14.271Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4f83761d1b1e479c8fa0f2540997010e/download","mirrored":false},{"resource_id":"43826557ce114fe78b01b7c8eae478cc","name":"Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0015_Revised 01JUL25.pdf","kind":"file","mime_type":".pdf","size_bytes":205809,"posted_at":"2025-07-01T21:47:14.271Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/43826557ce114fe78b01b7c8eae478cc/download","mirrored":false},{"resource_id":"a2e80e8c18154cf8b27bca8933a16173","name":"Amendment 0016_P1238_02JUL25.pdf","kind":"file","mime_type":".pdf","size_bytes":117228,"posted_at":"2025-07-02T20:54:26.489Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a2e80e8c18154cf8b27bca8933a16173/download","mirrored":false},{"resource_id":"0a48547dd5734fdd88560cb0daf57e78","name":"Phase Two Enclosure 1 - P1238_RFP Part 1_AMEND 0016_Revised 02JUL25.pdf","kind":"file","mime_type":".pdf","size_bytes":205936,"posted_at":"2025-07-02T20:54:26.489Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0a48547dd5734fdd88560cb0daf57e78/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_N6247325C0036_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_N6247325C0036_9700_-NONE-_-NONE-/","piid":"N6247325C0036","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"NAJMSTQC7D75","recipient_name":"CITY LIGHT & POWER, INC.","recipient_uei":"NAJMSTQC7D75","recipient_cage":"3KCT4","recipient_city":"GREENWOOD VILLAGE","recipient_state":"CO","sub_name":"Department of the Navy","office_name":"NAVFACSYSCOM SOUTHWEST","office_key":"o-N62473","first_action_date":"2025-09-18","last_action_date":"2025-09-18","actions":1,"obligated":"44511436.00","current_total_value":"44511436.00","potential_total_value":"44511436.00","naics":"237130","psc":"Y1NZ","extent_competed":"FULL AND OPEN COMPETITION","set_aside":"NO SET ASIDE USED.","offers_received":2,"description":"DESIGN-BUILD MILCON PROJECT P-1238 CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW BATTERY ENERGY STORAGE, VARIOUS BUILDINGS AT MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA","method":"solicitation","confidence":"high","evidence":["solicitation number N6247324R5227 equals the FPDS solicitation identifier","same awarding office N62473"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"N6247327RP00038","latest_notice_id":"7c27e49dea7a4a7780a1de2e448d545b","title":"Request for Proposals (RFP) Eight (8) Fully Furnished Apartment Units for Navy Trauma Training Center (NTTC) Students, Los Angeles, CA","solicitation_number":"N6247327RP00038","notice_type":"o","first_type":"o","first_posted":"2026-11-05","last_posted":"2026-11-23","notices":3,"due_at":"2026-12-03T00:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-03T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62473","office_name":"NAVFACSYSCOM SOUTHWEST","naics":"531110","psc":"X1FZ","set_aside":null,"state":"CA","county":"06037","county_name":"Los Angeles County","city":"0644000","city_name":"Los Angeles","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"N6247327R0006","latest_notice_id":"1484bb1bdb784f7c965ddab80dcfcf54","title":"N6247327R0006 Project Labor Agreement Request for Information","solicitation_number":"N6247327R0006","notice_type":"p","first_type":"r","first_posted":"2026-09-15","last_posted":"2026-11-19","notices":2,"due_at":"2026-12-03T22:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62473","office_name":"NAVFACSYSCOM SOUTHWEST","naics":"237130","psc":"Y1MZ","set_aside":null,"state":"CA","county":"06073","county_name":"San Diego County","city":"0666000","city_name":"San Diego","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"N6247326R9953","latest_notice_id":"081809a883964dffaf485090be4a155a","title":"Base Operations Support Contract (BOSC) for Naval Air Weapons Station (NAWS) China Lake, California and Other Locations as Approved","solicitation_number":"N6247326R9953","notice_type":"o","first_type":"o","first_posted":"2026-06-01","last_posted":"2026-11-24","notices":11,"due_at":"2026-12-08T22:00:00Z","due_date":"2026-12-08","closes_at":"2026-12-08T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62473","office_name":"NAVFACSYSCOM SOUTHWEST","naics":"561210","psc":"S216","set_aside":"SBA","state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"NAVAL AIR WEAPONS STATION (NAWS) CHINA LAKE, CALIFORNIA","site":"China Lake","site_key":"china-lake-ca","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"N6247325R0004","latest_notice_id":"7aee513b670c4568b172f27fee5ed789","title":"IDIQ SMALL BUSINESS SET-ASIDE MACC FOR PAVING PROJECTS AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN CA, AZ, NV, UT, CO, AND NM","solicitation_number":"N6247325R0004","notice_type":"o","first_type":"r","first_posted":"2025-03-20","last_posted":"2026-11-25","notices":3,"due_at":"2026-12-08T22:00:00Z","due_date":"2026-12-08","closes_at":"2026-12-08T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62473","office_name":"NAVFACSYSCOM SOUTHWEST","naics":"237310","psc":"Z1LB","set_aside":"SBA","state":"CA","county":"06073","county_name":"San Diego County","city":"0666000","city_name":"San Diego","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"},{"key":"N6247327R0014","latest_notice_id":"9e36b34d0e1d48d494fcd19d70cdcbcf","title":"IDIQ JOC 8(a) SMALL BUSINESS SET-ASIDE UNDER NAICS 238210 FOR ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS AT VARIOUS GOVERNMENT FACILITIES LOCATED WITHIN THE MCAGCC 29 PALMS AOR","solicitation_number":"N6247327R0014","notice_type":"o","first_type":"o","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":1,"due_at":"2026-12-09T18:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-09T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62473","office_name":"NAVFACSYSCOM SOUTHWEST","naics":"238210","psc":"Z2AZ","set_aside":null,"state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"MARINE CORPS AIR GROUND COMBAT CENTER TWENTYNINE PALMS, CALIFORNIA 92278","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"}],"similar_open":[{"key":"N6247327R0006","latest_notice_id":"1484bb1bdb784f7c965ddab80dcfcf54","title":"N6247327R0006 Project Labor Agreement Request for Information","solicitation_number":"N6247327R0006","notice_type":"p","first_type":"r","first_posted":"2026-09-15","last_posted":"2026-11-19","notices":2,"due_at":"2026-12-03T22:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62473","office_name":"NAVFACSYSCOM SOUTHWEST","naics":"237130","psc":"Y1MZ","set_aside":null,"state":"CA","county":"06073","county_name":"San Diego County","city":"0666000","city_name":"San Diego","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"15BBNF26Q40900001","latest_notice_id":"2e004e540d5d4c2f88bf44f758d84ac3","title":"FCI Marion - Emergency Repair Tornado Damage","solicitation_number":"15BBNF26Q40900001","notice_type":"k","first_type":"k","first_posted":"2026-10-05","last_posted":"2026-10-05","notices":1,"due_at":"2026-12-03T17:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15BFA0","office_name":"FAO","naics":"237130","psc":"Z2FF","set_aside":"SBA","state":"IL","county":"17199","county_name":"Williamson County","city":"1746916","city_name":"Marion","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-06T03:51:26.035830Z"},{"key":"W912HV27Z0002","latest_notice_id":"29c3ca3500084b549344c86608cdfd32","title":"DLA DWCF B1907 Backup Power Generator, Yokosuka, Japan","solicitation_number":"W912HV27Z0002","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-12-11T14:59:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T14:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HV","office_name":"W2SN ENDIST JAPAN","naics":"237130","psc":"Y1MZ","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"JPN","place_scope":"overseas","state_source":null,"state_evidence":"JAPAN","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"}],"similar_open_total":7,"indexable":false}