Sources sought, first published as special notice
Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.
N6247025R0006
Department of the Navy, Navfacsyscom Atlantic. Power and Communication Line and Related Structures Construction.
Response deadline
October 10, 2025 at 2:00 PM EDT
Closed 412 days ago. Posted September 26, 2025, first published June 2, 2025. Scheduled to archive October 25, 2025.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2025
7 like it are open now in power and communication line and related structures construction
- FCI Marion - Emergency Repair Tornado Damage
Federal Prison System / Bureau of Prisons, Fao
Combined synopsis and solicitationSmall businessNAICS 237130Marion, IL15BBNF26Q40900001Due in 7 daysDec 3 - N6247327R0006 Project Labor Agreement Request for Information
Department of the Navy, Navfacsyscom Southwest
PresolicitationNAICS 237130San Diego, CAN6247327R0006Due in 7 daysDec 3 - DLA DWCF B1907 Backup Power Generator, Yokosuka, Japan
Department of the Army, W2SN Endist Japan
Sources soughtNAICS 237130Outside the USW912HV27Z0002Closes in 15 daysDec 11
All 7 open in power and communication line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237130 (power and communication line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of July 24, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This project replaces primary power service transformers, primary power service distribution switchgear, and connects to existing feeders on Main Site distribution. Increases total system capacity to 168 MVA with three primary transformers. Modernizes the existing electric supervisory control and data acquisition (SCADA) system.
Specifics include:
1. Replaces and increases the capacity of the existing Dominion Gosport Industrial Transformers, circuit breakers, and relay control house with new SO transformers, circuit breakers, and relay control house (WORK BY OTHERS).
2. Replaces and increases the capacity of the Gosport Tie Station switchgear with a climate controlled, preengineered stainless-steel switchgear house on a new elevated platform. Provides new SCADA controls.
3. Connecting Primary feeders to Backbone Ductbank.
4. Demolition of Building 1532, a 53 m2 switch/substation facility; and Building 1702, a 155 m2 switch/substation facility.
5. Two microtunnel railroad crossings for electrical ductbanks.
PLEASE READ FULL SOURCES SOUGHT NOTICE.
PROVIDE CLEAR YES AND NO ANWERS ALONG WITH ANY ADDITIONAL EXPLANATION ANSWERING THE QUESTIONS ON THE PLA QUESTIONAIRE.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- P732 Industry Day Questions.pdf60 KB, June 2, 2025
- P732 Industry Day Flyer - Corrected.pdf96 KB, June 3, 2025
- PLA Request for Information.docx37 KB, July 24, 2025
- Project Matrix Template.xlsx11 KB, July 28, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 2, 2025
Special notice
P732 Industry Day Event for Electrical Distribution System Upgrades Norfolk Naval Shipyard, Portsmouth Virginia
Due June 20, 2025 at 5:00 PM EDT. SAM.gov, notice 52a6ca58cab447258e071e7c30354b38
3 revisions on SAM
- June 3, 2025: publish, special notice
- June 2, 2025: publish, special notice
- June 2, 2025: publish, special notice
June 2, 2025
Special notice
P732 Industry Day Event Electrical Distribution System Upgrades Norfolk Naval Shipyard, Portsmouth Virginia
Due June 20, 2025 at 5:00 PM EDT. SAM.gov, notice 6b3122a2b9724b8ab1e2d77e6371f63d
3 revisions on SAM
- June 3, 2025: publish, special notice
- June 2, 2025: publish, special notice
- June 2, 2025: publish, special notice
June 3, 2025
Special notice
P732 Industry Day Event for Electrical Distribution System Upgrades Norfolk Naval Shipyard, Portsmouth Virginia
Due June 20, 2025 at 5:00 PM EDT. SAM.gov, notice f7aa5b7bdda94237809e3887adb56f7e
4 revisions on SAM
- June 3, 2025: publish, special notice
- July 24, 2025: publish, sources sought
- June 2, 2025: publish, special notice
- June 2, 2025: publish, special notice
July 24, 2025
Sources sought, originally special notice
Due August 8, 2025 at 2:00 PM EDT. SAM.gov, notice fcbecac3e6b64f55918eec995da29b71
6 revisions on SAM
- September 26, 2025: publish, sources sought
- September 26, 2025: publish, sources sought
- July 28, 2025: publish, sources sought
- June 3, 2025: publish, special notice
- July 28, 2025: publish, sources sought
- July 24, 2025: publish, sources sought
July 28, 2025
Sources sought
Due August 8, 2025 at 2:00 PM EDT. SAM.gov, notice 5029b1aa0f96423aa95409300860fcf0
6 revisions on SAM
- September 26, 2025: publish, sources sought
- September 26, 2025: publish, sources sought
- July 28, 2025: publish, sources sought
- June 3, 2025: publish, special notice
- July 28, 2025: publish, sources sought
- July 24, 2025: publish, sources sought
July 28, 2025
Sources sought
Due August 8, 2025 at 2:00 PM EDT. SAM.gov, notice fa5dc023b4ab4930aee508a4e7d935a3
6 revisions on SAM
- September 26, 2025: publish, sources sought
- September 26, 2025: publish, sources sought
- July 28, 2025: publish, sources sought
- June 3, 2025: publish, special notice
- July 28, 2025: publish, sources sought
- July 24, 2025: publish, sources sought
September 26, 2025
Sources sought
Due October 10, 2025 at 2:00 PM EDT. SAM.gov, notice d15819fcd77c499aa1a9b588c3adcfc8
8 revisions on SAM
- December 30, 2025: publish, solicitation
- September 26, 2025: publish, sources sought
- October 15, 2025: publish, special notice
- September 26, 2025: publish, sources sought
- July 28, 2025: publish, sources sought
- June 3, 2025: publish, special notice
- July 28, 2025: publish, sources sought
- July 24, 2025: publish, sources sought
September 26, 2025
Sources sought
Due October 10, 2025 at 2:00 PM EDT. SAM.gov, notice d68c8a8c9033400bbf672acfd67a1245
6 revisions on SAM
- September 26, 2025: publish, sources sought
- September 26, 2025: publish, sources sought
- July 28, 2025: publish, sources sought
- June 3, 2025: publish, special notice
- July 28, 2025: publish, sources sought
- July 24, 2025: publish, sources sought
Points of contact
- Daniel Rochadaniel.r.rocha2.civ@us.navy.mil
- Jennifer W. McDonaldjennifer.w.mcdonald2.civ@us.navy.mil