Special notice
Kitsap Industrial Readiness Summit and NAVFAC Northwest Shipyard Infrastructure Optimization Program Industry Day
N4425526R0005_Industry_Day
Department of the Navy, Navfacsyscom Northwest. Commercial and Institutional Building Construction.
Response deadline
August 11, 2026 at 7:00 PM EDT
Closed 108 days ago. Posted August 24, 2026, first published August 4, 2026. Scheduled to archive September 30, 2026.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2026
191 like it are open now in commercial and institutional building construction
- $300M Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Facilities Sustainment, Restoration, and Modernization (FSRM) Program at Joint Base Lewis-McChord (JBLM)
Department of the Army, W071 Endist Seattle
Due in 4 daysDec 1 - Design-Build Modernization of the LPOE in Lynden, Washington Sources Sought
Public Buildings Service, PBS Capital Projects - Zones 5 & 6 Branch
Sources soughtNAICS 236220Lynden, WALPOE_LYNDEN_SSDue in 6 daysDec 3 - JOINT BASE LEWIS MCCHORD MULTI DOMAIN TASK FORCE BUILDINGS 3223-3224, WASHINGTON
Department of the Army, W071 Endist Seattle
Closes in 14 daysDec 11
All 191 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
Title: Kitsap Industrial Readiness Summit and NAVFAC Northwest Shipyard Infrastructure Optimization Program Industry Day
Type: Special Notice – Industry Day
Event: Kitsap Industrial Readiness Summit and Naval Facilities Engineering Systems Command (NAVFAC) Northwest Shipyard Infrastructure Optimization Program (SIOP) Industry Day
Location: Kitsap Conference Center, 100 Washington Ave, Bremerton, WA 98337
Date: Thursday, August 20
Time: 08:00 AM – 04:00 PM PDT
Registration Deadline: Close of business Tuesday, August 11
Registration Link: https://multimissiondrydock.com/keda-industry-day-sign-up/
Anticipated Agenda:
Morning Session: Kitsap Industrial Readiness Summit
8:00 AM: Doors Open
- Setup: Prime Contractors may access the main hall to set up their perimeter tables.
9:00am – 9:15am: Opening Remarks
9:15am – 9:45am Shipyard Infrastructure Optimization (SIOP) Across the Nation
- Purpose: The nationwide aspect of SIOP and impacts to PSNS and IMF.
9:45am – 10:30am Keynote: Ongoing Construction at PSNS & IMF
- Purpose: Ongoing construction at PSNS (DD4, P891, P859, and Phase-0 Preparatory activities. Seismic upgrades, electrical/mechanical system modernizations, tunnel repairs, and shoreline restoration efforts.
10:30am – 10:45am: Break
10:45am – 11:15am: Multi-Mission Dry Dock Construction, EIS Status
- Purpose: Ongoing construction at PSNS (DD4, P891, P859, and Phase-0 Preparatory activities).
11:15am – 12:00pm: Navy Panel Audience Q&A Session
12:00pm – 1:00pm: Lunch Break (On Your Own)
Afternoon Session: SIOP Industry Day & Matchmaking
1:00pm: SIOP Industry Day
1:00pm – 1:30pm: How to do Business with the Government
- Speaker: Representative from APEX Accelerator Kitsap Washington
- Purpose: Navigating federal regulations, certifications, small business goals (NAVFAC NW aims for 47% small business utilization), and proposal best practices.
1:30pm – 2:00pm: Cybersecurity Maturity Model Certification (CMMC)
- Speaker: Representative from APEX Accelerator Kitsap Washington
- Purpose: Regulations and guidelines to navigate CMMC.
2:00pm – 2:30pm: Proposal Preparation Information
- Speaker: Representatives from NAVFAC Northwest
- Purpose: Broad solicitation overview, proposal to award process, common pitfalls. Waterfront MACC background.
2:30pm – 3:45pm, Breakout Time: Prime & Subcontractor Matchmaking
- Format: Open networking and teaming session.
- Setup:
- Prime Contractors will be stationed at designated tables around the perimeter of the room.
- Subcontractors & Suppliers will rotate through the tables to introduce themselves and hand off capability statements.
- APEX Accelerator Kitsap Washington Table: A dedicated service hub located centrally to provide instant technical assistance, compliance advice, and resources.
3:45 PM – 4:00 PM: Closing Remarks & Adjournment
- Final Q&A and next steps for the Multi-Mission Dry Dock (MMDD) Multiple Award Construction Contract (MACC) solicitation phase.
4:00pm – 4:30pm: Overflow Time
Additional Information:
For more information on the proposed Multi-Mission Dry Dock project see:
https://bremertonwaterfrontimprovementseis.com/
https://multimissiondrydock.com/
Competition Description: This notice does NOT constitute a request for proposal (RFP), request for quote (RFQ), or invitation for bid (IFB). There is no bid package or solicitation at this time. No reimbursement will be made for any costs associated with responding to this announcement or for any participation in the Industry Day event. Respondents will NOT be notified of the results of the Industry Day event. No contracts will be awarded from this announcement.
Contracting POC: Jodus Hortin, jodus.d.hortin.civ@us.navy.mil
Secondary POC: Nancy Coffee, nancy.m.coffee.civ@us.navy.mil
Attachments
Files and links listed on SAM.gov. Files we hold a copy of download from here; the rest open SAM's download, which needs no account. Links open the sites the agency named.
- SIOP Industry Day (20-Aug-26)_Sign-In Sheet_Final.pdf272 KB, August 24, 2026
- Bremerton Waterfront Infrastructure Improvements Environmental Impact StatementLink to bremertonwaterfrontimprovementseis.com, August 4, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 4, 2026
Special notice, originally sources sought
Due August 11, 2026 at 7:00 PM EDT. SAM.gov, notice e51cc65657e2410093d58837a7e7a380
4 revisions on SAM
- August 24, 2026: publish, special notice
- August 24, 2026: publish, special notice
- August 4, 2026: publish, special notice
- July 1, 2026: publish, sources sought
August 24, 2026
Special notice
Due August 11, 2026 at 7:00 PM EDT. SAM.gov, notice b9a34ce05b9d46de92becd8458538278
4 revisions on SAM
- August 24, 2026: publish, special notice
- August 24, 2026: publish, special notice
- August 4, 2026: publish, special notice
- July 1, 2026: publish, sources sought
August 24, 2026
Special notice
Due August 11, 2026 at 7:00 PM EDT. SAM.gov, notice c4915244afe64840abb9b477803b62de
4 revisions on SAM
- August 24, 2026: publish, special notice
- August 24, 2026: publish, special notice
- August 4, 2026: publish, special notice
- July 1, 2026: publish, sources sought
Points of contact
- Jodus Hortinjodus.d.hortin.civ@us.navy.mil
- Nancy Coffeenancy.m.coffee.civ@us.navy.mil