Sources sought
Guam Ship Repair MAC IDIQ
N4044626R4001
Department of the Navy, Military Sealift Fleet Support CMD. Ship Building and Repairing.
Response deadline
June 3, 2026 at 10:00 AM EDT
Closed 176 days ago. Posted May 5, 2026. Scheduled to archive July 30, 2026.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2026
107 like it are open now in ship building and repairing
- YRBM-25 Dry-Docking Selected Restricted Availability (DSRA) and Vessel Transportation
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
Sources soughtNAICS 336611GuamN62649-27-SS-YRBM25-DSRACloses in 66 daysJan 31, 2027 - USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due tomorrowNov 27 - Ship Repair
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 336611Outside the USN6817127QN013Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of May 5, 2026. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This SOURCES SOUGHT NOTICE is for market research purposes only and does not constitute a Request for Proposal or Quotation. It is not a commitment by the Government to award a contract nor will the Government pay for any information provided; no basis for claim against the Government shall arise as a result of a response to this Sources Sought Notice or Government use of any information provided.
Pursuant to FAR Part 10 (Market Research), the primary purpose of this notice is to determine if sources capable of satisfying the agency's requirements exist.
However, pursuant to FAR Part 6 and FAR Part 19, competition and set-aside decisions may be based on the results of this market research. This notice in no way obligates the Government to any further action.
REQUIREMENT: This notice is issued by Military Sealift Command SSU Guam located in Santa Rita, GU. the requirement for general ship repair (GSR) to be performed primarily on the island of Guam.
CURRENT ACQUISITION STRATEGY: The Government currently anticipates procuring GSR under a multiple award contract (MAC) for non-complex ship repair requirements. MSC intends to solicit and award this IDIQ contract as HUBZONE small business set-asides.
NAICS CODE/SIZE STANDARD: The applicable NAICS Code is 336611, Ship Building and Repairing and the size standard is 1,300 employees.
SCOPE OF WORK: The proposed procurement covers GSR work including, but not limited to: compressor, boiler, engine, pipe, valve, pump, motor, generator, elevator, conveyor, switchboard, control panels, circuits/breakers, lighting, evaporator/watermakers, oily water separators, insulation, lagging, painting, decking/floor covering, non-skid, cleaning services (general, tanks, bilges), gas freeing, mobile crane service, rigging service, staging and scaffolding service, galley system repairs, structural repairs, pipe repairs, heating/ventilation/air conditioning/refrigeration (HVAC) maintenance, cleaning, and repair, ventilation ducting fabrication and installation, ventilation system efficiency air flow and heat balance verification, ship's cranes repairs and weight tests, hydrostatic test and refill of gas cylinders, main propulsion and electrical generator maintenance and repairs, underwater hull and propeller inspection and cleaning, rigid hulled inflatable boat, lifeboat and davit maintenance and repair, navigation system maintenance and repair, hydraulic system maintenance and repairs (anchor windlass, capstan, steering, heavy overboard systems, and under way replenishment systems), ordnance handling equipment inspect, repair, test, and certify, and provide working, redlined, and final as-built drawings (when specified). The contractor will be required to subcontract with specialized and/or authorized service providers in accordance with individual DO requirements. Finally, the contractor may be required to procure parts and materials.
PLACE OF PERFORMANCE: Work will primarily be performed at Government piers on Naval Base Guam. Work may also be performed in the Commonwealth of the Northern Mariana Islands (CNMI) or at the Contractor’s facility. Although unlikely, performance may be required in other locations in support of MSC’s worldwide mission.
ESTIMATED MAGNITUDE: Although subject to change based on further market research (e.g. results of this sources sought) and acquisition planning, the Government currently anticipates the following:
MAC IDIQ Ceiling – $349MIL total
MAC IDIQ DO Value – $2500 to $25M
ANTICIPATED ORDERING PERIOD: The Government anticipates awarding on or around July 2027. The contract will include a potential ordering period of five years.
INCUMBENT CONTRACTS: The following contracts comprise the current MAC, which has a not to exceed ceiling of $249MIL.
Contract Number
Contractor
N4044623D0001
Cabras Marine Corporation
N4044623D0002
Guam Shipyard
N4044623D0003
Seafix Incorporated
N4044626D0001
Blue Steel
The current IDIQ MAC was solicited and awarded as a HUBZONE small business set-aside.
SUBMISSION OF INFORMATION: Small business concerns having capabilities necessary to meet or exceed the stated requirements are invited to provide information to contribute to this sources sought notice.
Interested parties shall complete the attached Contractor Response Workbook and email it to donnie.s.leger.civ@us.navy.mil no later than 3 June 2026. The first worksheet should be completed by all interested parties. The second worksheet is an optional opportunity for offerors to provide constructive feedback for the Government’s consideration.
When printed, the two worksheets shall not exceed four single-sided pages. No additional attachments or pages will be considered by the Government.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Contractor Response Workbook.xlsx14 KB, May 6, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 6, 2026
Sources sought
Due June 3, 2026 at 10:00 AM EDT. SAM.gov, notice 68bbfed5bfea4735af65fc9920627576
1 revision on SAM
- May 6, 2026: publish, sources sought
Points of contact
- Donnie Legerdonnie.s.leger.civ@us.navy.mil6713394036
- Amber M. San Gilamber.m.sangil.civ@us.navy.mil6713392082