Award notice, total small business set-aside, first published as presolicitation
Results - Demolish Bulk Fuel Facility Cutler
N4008524B2507
Department of the Navy, Navfacsyscom Mid-Atlantic. Oil and Gas Pipeline and Related Structures Construction.
Awarded
Specpro Environmental Services LLC
$11,898,741.50 obligated so far on USAspending
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one was awarded in 2024
5 like it are open now in oil and gas pipeline and related structures construction
- Mather Fueling System Repairs
Department of the Army, W071 Endist Omaha
SolicitationSmall businessNAICS 237120Mather, CAPANNWD26P028176Closes in 9 daysDec 4 - Savannah ANG Repairs Pre-Solicitation Notice
Department of the Army, W071 Endist Omaha
PresolicitationSmall businessNAICS 237120GeorgiaW9128F27RA053PNCloses in 9 daysDec 4 - WH Ford RTC Fueling System Repairs
Department of the Army, W071 Endist Omaha
SolicitationSmall businessNAICS 237120Location not publishedW9128F27RA054Closes in 26 daysDec 21
All 5 open in oil and gas pipeline and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Award notice. Who won, when, and for how much. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237120 (oil and gas pipeline and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 37 days from the day the solicitation was posted, June 12, 2024, to the deadline. The deadline moved 2 times: it was first June 7, 2024 and ended as July 19, 2024.
- Before the solicitation
- The agency published a presolicitation on May 23, 2024, 20 days before the solicitation.
- How it ended
- Awarded to Specpro Environmental Services LLC on August 2, 2024, 14 days after offers were due. The contracting office reported 3 offers (full and open competition after exclusion of sources).
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov with the solicitation of July 19, 2024.
The work includes all labor, material, equipment, transportation, supervision, and incidental related work to demolish three existing bulk tanks and associated piping in the bulk tank area at NSA Cutler in Cutler, Maine. It also includes the demo of the four transient fuel tanks and their corresponding dog houses covering the utility pits. A total of four new 50,000 gal tanks will be installed in the existing bulk tank area and four 20,000 gal tanks will be installed in the transient fuel area.
There are 11 bid options. Bid option 1: Includes the demo of the bulk tank berm oil water separator. Bid option 2: Includes providing a 6 inch concrete slab on abandoned bulk tank foundation. Bid option 3: Includes the demo of cantilevered concrete pan at transient tank dog house. Bid option 4: Includes providing a reinforced membrane waterproofing system to building. Bid option 5: Includes providing concrete repairs inside transient utility tunnel - Crack Injection.
Bid option 6: Includes providing concrete repairs inside transient utility tunnel - Type B Spall. Bid option 7: Includes painting the bulk fuel tank support pipes. Bid option 8: Includes mill and overlay of roadways around project area. Bid option 9: Includes Fuel oil delivery and tank filling upon completion of Phase 2. Bid option 10: Includes on site temporary fuel storage for fuel oil removed as part of Phase 2. Bid option 11: provides for the installation of bollards for transient tank parking lot.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Specpro Environmental Services LLC
- UEI
- NLCRUT3KG9R6
- CAGE
- 39HU1
- Vendor location
- Knoxville, TN
- Contract
- N4008524C0027, definitive contract
- Obligated
- $11,898,741.50
- Actions
- 1 between August 2, 2024 and August 2, 2024
- Competition
- Full and Open Competition After Exclusion of Sources, 3 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Base Bid - Demolish Bulk Fuel Facility
- Match
- award number N4008524C0027 equals the contract number; same awarding office N40085 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 23, 2024
Presolicitation
Demolish Bulk Fuel Facility Cutler
Due June 7, 2024 at 12:00 PM EDT. SAM.gov, notice 9576d255ba4841e1909250c0ad0acaba
June 12, 2024
Solicitation, originally presolicitation
Demolish Bulk Fuel Facility Cutler
Due July 12, 2024 at 11:00 AM EDT. SAM.gov, notice c90dfb69ba3a4a88a0940a1cfc2c6911
July 8, 2024
Solicitation
AMENDMENT 0001 - Demolish Bulk Fuel Facility Cutler
Due July 12, 2024 at 11:00 AM EDT. SAM.gov, notice 4c973563139f4d5d9b5a740736795b67
July 9, 2024
Solicitation
AMENDMENT 0002 - Demolish Bulk Fuel Facility Cutler
Due July 19, 2024 at 11:00 AM EDT. SAM.gov, notice 73aeb7c64b4c4946a682844874a6b28d
July 19, 2024
Solicitation
Due July 19, 2024 at 11:00 AM EDT. SAM.gov, notice b86ba6e138614ba2a6e0bfdbe6b1012d
August 2, 2024
Award notice, originally solicitation
Awarded to SPECPRO ENVIRONMENTAL SERVICES LLC Knoxville for $11,898,742. SAM.gov, notice 477dc6f0c4ce40baa9d6db924d87fe47
Points of contact
- Matthew Thomsenmatthew.j.thomsen2.civ@us.navy.mil
- Jonathan Ericksonjonathan.p.erickson3.civ@us.navy.mil