# P347 Perimeter Security Improvement, Portsmouth Naval Shipyard, NCTS Cutler, Maine

Canonical: https://sealedbidder.com/opportunities/n4008523r2539

- Solicitation number: N4008523R2539
- Notice type: Solicitation
- Status: Closed. Deadline was December 1, 2023 at 2:00 PM EST
- Department: Department of the Navy
- Agency: Department of the Navy
- Contracting office: Navfacsyscom Mid-Atlantic (N40085)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Z2JZ Repair Or Alteration Of Miscellaneous Buildings
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237990)
- Location read from: the notice's title: "VEMENT, PORTSMOUTH NAVAL SHIPYARD, NCTS CUTLER, MAINE"
- First posted: February 4, 2025
- Last posted: February 4, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/323a01c2276c49a68886e99f033c864b/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates.

## Description

This project, P347 DBB Perimeter Security Improvements at Portsmouth Naval Shipyard, NCTS Cutler, Maine, will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations, and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. This project includes an entry control facility (ECF) that includes an entry control point fence, a guard and truck inspection office, a main entry canopy, a Pass and Identification office and a restricted area security fence. The entry control point fence includes a chain link security fence and a sliding gate. The guard and truck inspection office is constructed of metal stud walls with cementitious siding and an exposed steel canopy structure.  The single lane main entry canopy will be used for identification checks, and is comprised of concrete structural elements and an exposed steel canopy structure. The guard and truck inspection office will be attached to the main entry canopy. Building #129, the existing one-story security building, will be renovated and enlarged to provide required components to support security personnel functions and the pass and identification office. The project also constructs a security fence around the restricted area, which comprises the entire peninsula.

## Attachments

- [Department of Defense Procurement Toolbox](https://dodprocurementtoolbox.com/) (link)
- [Registration Instructions for the PIEE Solicitation Module](https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf) (link)
- [Web Based Training for the PIEE Solicitation Module](https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml) (link)
- [PIEE Solicitation Module Link for N4008523R2539](https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N4008523R2539) (link)
- [Cutler Site Access Requirements-Contractor Instructions.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5ba9dab0313c43909f3ceadb9098b42b/download)
- [Cutler Site Access Requirements-NAVFAC Instructions.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/04b717d6353f4a5c9a945e8dc2fb3291/download)
- [SECNAV_5512_1_dtd_May21.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7c54a800509c419abab5666d1604ebaf/download)
- [P347 AMENDMENT 0001.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/784c773f82ce491e9778d97aca126c4e/download)
- [P347 AMENDMENT 0002.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/30be69d382d746efa5fc05b9546feb51/download)
- [P347 AMENDMENT 0003.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/37749abe75a3486385c65cdf8626de6f/download)
- [1614700dwg02of22HAZMAT_GEOTECH.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bf6990dc793e44589903d693656a0d95/download)
- [1614700dwg03of22EXISTING_CONDITION.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bf1180e30e9f426cb3d1c1bab3cf7106/download)
- [1614700dwg01of22GENERAL.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/42bddec687394d35aa8213b6b66b2515/download)
- [1614700dwg05of22CIVIL_SITE.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a6e5272f0a63443697c4a1272de1c739/download)
- [1614700dwg04of22CIVIL_ALIGNMENT_DEMO.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2abda8b8780b4734aea96d5a9e2cd874/download)
- [1614700dwg08of22CIVIL_SIGNING_UTILITIES.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/02b74dd2007a4036b6aa3281986b5cbf/download)
- [1614700dwg07of22CIVIL_GRADING_DRAINAGE_02.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/eb04c5b37c404a8bbd7592a6ce3ca7c4/download)
- [1614700dwg10of22CIVIL_EROSION_02.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4341f724cf44421987f02ece8090391f/download)
- [1614700dwg09of22CIVIL_EROSION_01.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d220ed8aac954a918afc75404653f244/download)
- [1614700dwg06of22CIVIL_GRADING_DRAINAGE_01.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ed5f8a2170ac44758517d17b8c684d23/download)
- [1614700dwg12of22CIVIL_EROSION_04.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4f4a8dc5ad454a2d9ccda3172d023911/download)
- [1614700dwg15of22ENVIRONMENTAL.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/310e7adcce1941d6ad279552672c0e4d/download)
- [1614700dwg14of22LANDSCAPING.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2b407eb739994ee8943e86f18b5758f8/download)
- [1614700dwg13of22WETLAND.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4a5f6b3be18b403fbbb4344743261408/download)
- [1614700dwg11of22CIVIL_EROSION_03.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6265dd89024e45b1a6dd2193443665bb/download)
- [1614700dwg18of22FIRE.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0c15969778d34e22ac1b29b86109cba4/download)
- [1614700dwg19of22PLUMBING.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c092c5e6c99c4af199a46a5acfcf8df3/download)
- [1614700dwg20of22MECHANICAL.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bcb7b87f09f24960a53f24cf66bb084f/download)
- [1614700dwg16of22STRUCTURAL.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fe0312c7c9464530b8e70b74d47ed39e/download)
- [1614700dwg21of22ELECTRICAL.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/30d202740fef4dda84dc200fcf629b1e/download)
- [1614700dwg22of22TELECOM_SECURITY_AUDIO.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e03303720ddc43f4b9ecf9533577fe60/download)
- [1614700dwg17of22ARCHITECTURAL_INTERIOR.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a35e6f7cdf98492dbfa8126d095cb44a/download)
- [1614700spc1of1.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/67208a2795244de2938508cbea6b3776/download)
- [P347 AMENDMENT 0004.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/563f9c3540cf415dacc16b7ffc8b8c6f/download)
- [P347 AMENDMENT 0005.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1e6befc7405d4202ba90b42d01c68d33/download)
- [CS507 - FENCING DETAILS.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d84081eef323448b89784fd47cd0dff5/download)
- [P347 AMENDMENT 0006.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4929933ac4fc4153a39cfabafdd783dc/download)
- [08 14 00.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5801e520916c42c6bcc6ef284bd6db73/download)
- [09 26 00.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/49bece5f4f0e4de78f19f3f2e868f4db/download)
- [Uline IH-2769-SPFR.PDF](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/50aa49c162d04c0facf2e5f7b5607cfe/download)
- [Uline IH-1119-SPFR.PDF](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e5bcf08b4fce4afc892cfb647064add0/download)
- [P347 AMENDMENT 0007.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b807a564f32c4cb79de7a8a5229ed079/download)
- [P347 AMENDMENT 0008.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a44460133abd42a684b2f33116c0e2c0/download)
- [P347 AMENDMENT 0009.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1033fd14b971475d83f09a54b761c5f2/download)
- [P347 J-A Interior Finishes Redacted.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6d89a0f0f5f44eac9c37e4023d694bbd/download)
- [P347 AMENDMENT 0010.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2e03dd71b7af4b5292db14d3baa7a50d/download)
- [Prospect Harbor Canopy Drawings Calcs Data.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/120055c1f9c2443781c7db786ef8d46c/download)
- [1614700Amend0011spc.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dc71d447fd2245f7a9238e2672b96ae1/download)
- [P347 AMENDMENT 0011.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a442804862b54716a3212ca82da344f9/download)
- [1614700Amend0011dwg.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4961189d38734c2a854384edec66e97a/download)
- [Amendment 0012.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/04c7e34916c84a69b66d08babbbad1f0/download)
- [P-347 Price Proposal Form AMD 0012.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7c1b46b3c7d8435a8fd781a4235cc2dd/download)

## Open now in the same industry

143 open in NAICS 237990.

- United States Air Force Academy (USAFA) Varsity Baseball Stadium (NAF128F27B0001), due November 27, 2026 at 3:00 AM EST. https://sealedbidder.com/opportunities/naf128f27b0001
- Thomas J O???????????????????????????Brien Lock and Dam Major Rehabilitation ??????????????????????????? Construction, Chicago, Cook County, Illinois (PANGLR26P0000029409), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/panglr26p0000029409
- Dredged Material Containment Area (DMCA) O&M Construction IDC (W912HN27RA006), due November 27, 2026 at 6:00 PM EST. https://sealedbidder.com/opportunities/w912hn27ra006

## Publications

- February 4, 2025: Solicitation, due December 1, 2023 at 2:00 PM EST. Notice 323a01c2276c49a68886e99f033c864b. https://sam.gov/workspace/contract/opp/323a01c2276c49a68886e99f033c864b/view

## Points of contact

- Georgia Scott, georgia.scott@navy.mil, 7573410691

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/n4008523r2539.
