Solicitation
B103 Repair Mechanical Systems and Building Improvements
N40080-24-R-3956
Department of the Navy, Navfacsyscom Washington. Commercial and Institutional Building Construction.
Response deadline
June 3, 2024 at 2:00 PM EDT
Closed 905 days ago. Posted May 3, 2024. Scheduled to archive June 18, 2024.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2024
194 like it are open now in commercial and institutional building construction
- Chesapeake and Delaware (C and D) Canal Building Replacement Project.
Department of the Army, W2SD Endist Philadelphia
PresolicitationSmall businessNAICS 236220MarylandW912BU27RA009Due todayNov 25 - NIH MULTIPLE-AWARD CONSTRUCTION CONTRACT (MACC) FOR GENERAL CONSTRUCTION SERVICES
National Institutes of Health, NIH a E Construction
SolicitationNAICS 236220Bethesda, MD75N99027R00002Closes in 20 daysDec 15 - 512A5-22-700 | EHRM Infra Upgrades | Perry Point, MD CO: Samantha Mihaila CS: Ric Sochor
Department of Veterans Affairs, Pcac
SolicitationSDVOSBNAICS 236220Maryland36C77626R0118Closes in 42 daysJan 6, 2027
All 194 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 31 days from the day the solicitation was posted, May 3, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The project includes but is not limited to replacement of deteriorating (27) hydronic floor mounted fan coil units to include associated fittings, piping, valves, and accessories. (2) 7.5 ton rooftop package units to include associated, disconnect switches, circuit breakers, conduits, wirings, piping, valves, temperature sensors, controls, and accessories.
(2) Mini-split type a/c unit to include associated disconnect switches, circuit breakers, conduits, wirings, piping and accessories located in IDF room and locker room. (4) Ceiling exhaust fans and associated accessories located in first floor toilet male and female rooms, locker room, and weather office room– 104. (1) Baseboard heater unit and associated accessories located in second floor corridor 100 entryway. The new work includes of the following:
1) Provide and install (27) new ceiling cassette type fan coil units to include associated fittings, valves, piping, insulation, hanger support, digital control, and accessories. Provide fan coil units that match the existing chiller unit brand.
2) Modify existing fan coil units piping (cold/hot) as required for proper installation of new ceiling cassette type units. Remove any unused piping, fittings, valves, and associated accessories. Where required, drywall is removed add layer of ½ rigid expanded polystyrene (EPS) foam.
3) Provide and install (2) new 7.5 ton rooftop package units to include associated, disconnect switches, circuit breakers, conduits, wirings, piping, valves, temperature sensors, digital controls, and accessories. Provide necessary equipment required for ductwork cleaning. At no time both units will be down. Provide and install (2) pole metal mounted for disconnect switches.
4) Provide and install new (2) mini-split type a/c unit with cooling only to include associated disconnect switches, circuit breakers, conduits, wirings, piping and accessories located in IDF room and locker room. Existing housekeeping pads may reused if good condition is acceptable.
5) Provide and install new (4) ceiling exhaust fans located in first floor toilet male and female rooms, locker room, and weather office room– 104.
6) Provide and install new baseboard heater unit and associated accessories located in second floor corridor 100 entryway.
7) Provide and install new ceiling exhaust fan in second floor room 205; shower and toilet rooms to include circuit breakers, conduits, wirings, and associated accessories.
8) Provide and install new dedicated outdoor air system (DOAS) unit to include associated ductwork, housekeeping pad, disconnect switch, circuit breakers, conduits, wirings, control, sensors, and accessories. Provide design for DOAS unit to include ductwork and electrical systems. Perform load calculation to determine appropriate size unit.
9) Provide and install new acoustical ceiling tiles and associated accessories that match the existing patterns and finishes.
10) Modify existing electrical panel to adapt serve new DOAS unit and ceiling exhaust fans. Existing electrical wiring may reused if capacity is adequate and in good condition. Building will remain occupied during construction. Very important, heating, cooling, and dehumidification shall be maintained in the Air Traffic control operation room during this project.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 3, 2024
Solicitation
Due June 3, 2024 at 2:00 PM EDT. SAM.gov, notice d3222a37d03c4f958cc55a380a4d2381
Points of contact
- Jennifer Bowlingjennifer.l.bowling5.civ@us.navy.mil2025384189
- Keetje Straubkeetje.straub@navy.mil2027354002