Award notice
Airborne Instrumentation Modular Data Recorder (MDR) system hardware and associated repair services
N00421-25-D-0003
Department of the Navy, Naval Air Warfare Center Air Div. Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing.
Awarded
$47,914,381.00 on the award notice, October 24, 2024, contract N0042125D0003
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one was awarded in 2024
100 like it are open now in search, detection, navigation, guidance, aeronautical, and nautical system and instrument manufacturing
- Market Survey for Procurement of Doppler GPS Navigation System
Department of the Army, W6QK ACC-APG
Sources soughtNAICS 334511Ship to Aberdeen Proving Ground, MDW15P7T-25-R-0007Due tomorrowNov 26 - MH-60R Airborne Low Frequency Sonar (ALFS) Weapon Replaceable Assemblies (WRA) Support and Sustainment
Department of the Navy, Naval Air Systems Command
Combined synopsis and solicitationNAICS 334511Clarksburg, MDN0001926RFPREQAPM2990566Due in 3 daysNov 28 - MH-60 Airborne Mine Countermeasure (AMCM) Carriage, Stream, Tow and Recovery System (CSTRS) Obsolescence Support
Department of the Navy, Naval Air Systems Command
Sources soughtSmall businessNAICS 334511MarylandN00019-27-RFPREQ-APM299-0678Closes in 9 daysDec 4
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Award notice. Who won, when, and for how much. Glossary
- How it ended
- Awarded to Safran Defense & Space, Inc. on October 24, 2024. The contracting office reported 1 offer (not competed).
Description
As published on SAM.gov.
A multitude of Navy aircraft programs have instrumentation systems that utilize SDS MDR units. These recorder system’s design is proprietary to SDS. Specific areas that make SDS MDRs highly specialized include:
size, weight, physical interface compatibility, software and programming compatibility, unique data bandwidth requirements, and ability to adapt to different size requirements.
Since SDS's products have gone through the significant environmental testing required for each program, as well as flight readiness reviews prior to installation, utilizing any other vendor's recorders would require the Navy to duplicate these efforts with regard to aircraft data system modifications in building, installing, testing, and qualifying a completely new data recording system. The required recorders have to be identical in form and fit, so they are compatible with recorders that are currently deployed.
The existing proprietary technical data and specifications for the items developed by SDS include a design that is a complex collection of data recorder system and subsystem components. Components of existing SDS systems must be completely compatible in order to work as part of an integrated instrumentation system. Many of the items to be procured will be direct replacements for existing hardware in use.
While other manufacturers make aircraft instrumentation recorders that are similar in function, the equipment is neither electrically or mechanically compatible with the existing SDS hardware in use; and therefore, will not work as part of the developed integrated system. As a result, changing to a different vendor would result in a substantial duplication of costs to integrate, test, and certify a new recorder to systems of the aircraft.
First, changing to another contractor’s MDR system would require the replacement of $15 million in existing SDS hardware due to incompatibility issues that would arise with another MDR product. In addition, the Government would incur as much as $250K per aircraft to certify a new recorder unit based on the required environmental testing and flight readiness reviews described above.
In addition, changing to another instrumentation vendor would pose unacceptable schedule risks to current and future flight test programs. At the Test and Evaluation (T&E) phase of development, schedules are critical to ensure programs are able to meet major milestones.
For each program utilizing MDR instrumentation hardware under the current contract, a one-month delay in schedule due to certification testing and flight reviews of new MDR instrumentation, could cause up to $1 million per month in increased costs to staff the entire Integrated Test Team (ITT).
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Safran Defense & Space, Inc.
- UEI
- DVYZAD8GXL45
- CAGE
- 1UAE7
- Vendor location
- Norcross, GA
- Contract
- N0042125D0003
- Obligated
- $0.00, potential $47,014,381
- Actions
- 3 between October 24, 2024 and July 29, 2025
- Competition
- Not Competed, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- Airborne Instrumentation MDR Hardware
- Match
- award number N0042125D0003 equals the contract number; same awarding office N00421 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 29, 2024
Award notice, originally combined synopsis and solicitation
Awarded to SAFRAN DEFENSE & SPACE, Inc. Norcross for $47,914,381. SAM.gov, notice 5b8bff546c4c4dd6945fd882fbad7c39
Points of contact
- Marilyn Retzlermarilyn.m.retzler.civ@us.navy.mil2405384736
- Candice D. Byrdcandice.byrd@navy.mil2408085367