{"canonical":"https://sealedbidder.com/opportunities/n0038326rla76","key":"N0038326RLA76","url":"https://sealedbidder.com/opportunities/n0038326rla76","title":"16--CHOPPER ASSEMBLY,ED- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF","solicitation_number":"N0038326RLA76","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-04-24T18:00:00Z","first_posted":"2026-02-27","last_posted":"2026-03-25","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE NAVY","office":"NAVSUP WEAPON SYSTEMS SUPPORT","naics":"336413","psc":"1680","set_aside":null,"place_state":null,"place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"Product purchase (PSC 1680)","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"e46685aacf284a39858afacf0685da6d","title":"16--CHOPPER ASSEMBLY,ED- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF","solicitation_number":"N0038326RLA76","notice_type":"p","base_type":"p","posted":"2026-02-27","posted_at":"2026-02-27T13:03:16.230Z","due_at":"2026-04-14T04:00:00Z","due_date":"2026-04-14","cancelled":false,"archived":true,"archive_date":"2026-04-29","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e46685aacf284a39858afacf0685da6d/view","enriched":true,"history":[{"index":3,"title":"16--CHOPPER ASSEMBLY,ED- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-27T13:03:16.230Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"e46685aacf284a39858afacf0685da6d","solicitation_number":"N0038326RLA76"}]},{"notice_id":"58c69340e74d417783e7f9511d7c617a","title":"16--CHOPPER ASSEMBLY,ED- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF","solicitation_number":"N0038326RLA76","notice_type":"o","base_type":"o","posted":"2026-03-25","posted_at":"2026-03-25T11:29:40.368Z","due_at":"2026-04-24T18:00:00Z","due_date":"2026-04-24","cancelled":false,"archived":true,"archive_date":"2026-05-09","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/58c69340e74d417783e7f9511d7c617a/view","enriched":true,"history":[{"index":3,"title":"16--CHOPPER ASSEMBLY,ED- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-25T11:29:40.368Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"58c69340e74d417783e7f9511d7c617a","solicitation_number":"N0038326RLA76"}]}],"latest_notice_id":"58c69340e74d417783e7f9511d7c617a","first_type":"p","notices":[{"dates":{"posted":"2026-02-27","posted_at":"2026-02-27T13:03:16.230Z","created_at":"2026-02-27T13:03:16.172Z","modified_at":"2026-04-30T03:55:46.667Z","response_deadline":{"raw":"2026-04-14T00:00:00-04:00","utc":"2026-04-14T04:00:00Z","date":"2026-04-14","time":"00:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e46685aacf284a39858afacf0685da6d/view"},"naics":{},"title":"16--CHOPPER ASSEMBLY,ED- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF","agency":{"office":{"code":"N00383","name":"NAVSUP WEAPON SYSTEMS SUPPORT"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500021098","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-29","archive_type":"auto_custom"},"history":[{"index":3,"title":"16--CHOPPER ASSEMBLY,ED- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-27T13:03:16.230Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"e46685aacf284a39858afacf0685da6d","solicitation_number":"N0038326RLA76"}],"contacts":[{"name":"KRISTIN CLEMENS, N792.07, PHONE (215)697-3814, EMAIL KRISTIN.CLEMENS2.CIV@US.NAVY.MIL","role":"primary","email":"KRISTIN.CLEMENS2.CIV@US.NAVY.MIL"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"e46685aacf284a39858afacf0685da6d","lineage_id":"e46685aacf284a39858afacf0685da6d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T02:35:50.356078010Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"a7391b37f356285306d405a7f94f0232743bd356424bc45e56ea43703b27c081","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T02:35:50.356078010Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"NSN 7R-1680-016216686-EY, TDP VER 002, QTY 13 EA, DELIVERY FOB ORIGIN. The data needed to acquire/repair this part competitively is not physically available, it cannot be obtained economically, nor is it possibleto draft adequate specifications or any other adequate, economical description of the material for a competitive solicitation. The Government does not own the data or the rights to the data needed to purchase / contract repair of this part from additional sources. It has been determined to be uneconomical to buy the data or rights to the data. It is uneconomical to reverse engineer the part. The subject item requires Government source approval prior to contract award, as the item is flight critical and/or the technical data available has not been determined adequate to support acquisition via full and open competition. Only the source(s) previously approved by the Government for this item have been solicited. The time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source. If you are not an approved source you must submit, together with your proposal, the information detailed in one of the NAVSUP Weapon Systems Support (NAVSUP WSS) Source Approval Information Brochures listed below. Spares: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Sup port/Business-Opps/ Repair: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP -Weapon-Systems-Support/Business-Opps/ technical data required to be submitted based on your company's experience in production of the same or similar item, or if this is an item you have never made. If your request for source approval is currently being evaluated at NAVSUP WSS submit with your offer a copy of the cover letter which forwarded your request for source approval. Offers received which fail to provide all data required by the Source Approval Brochure or document previous submission of all data required by the Source Approval Brochure will not be considered for award under this solicitation. Please note, if evaluation of a source approval request submitted hereunder cannot be processed in time and/or approval requirements preclude the ability to obtain subject items in time to meet Government requirements, award of the subject requirement may continue based on Fleet support needs. The NAVSUP WSS Commercial Item Identification Brochure is now available at: \"https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Bus iness-Opps/\" Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-2667 or 215-697-2179 (DSN: 442-2667), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. The proposed contract action is for supplies or services for which theGovernment intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.Award will be made only if the offeror, the product/service, or themanufacturer meets the qualification requirement(s) at time of award, inaccordance with FAR clause 52.209-1. The solicitation identifies the officewhere additional information can be obtained concerning qualificationrequirements and is cited in each individual solicitation.Based upon market research, the Government is not using the policies containedin FAR Part 12, Acquisition of Commercial Items, in its solicitation for thedescribed supplies or services. However, interested persons may identify tothe contracting officer their interest and capability to satisfy theGovernment's requirement with a commercial item within 15 days of this notice.One or more of the items under this acquisition is subject to: Free Trade Agreements, if DFARS clause 252.225-7036 Buy American Act--Free Trade Agreements--Balance of Payments Program, is included in thesolicitation. The World Trade Organization Government Procurement Agreement and Free Trade Agreements, if DFARS clause 252.225-7021 Trade Agreements, is included in the solicitation.","text":"NSN 7R-1680-016216686-EY, TDP VER 002, QTY 13 EA, DELIVERY FOB ORIGIN. The data needed to acquire/repair this part competitively is not physically available, it cannot be obtained economically, nor is it possibleto draft adequate specifications or any other adequate, economical description of the material for a competitive solicitation. The Government does not own the data or the rights to the data needed to purchase / contract repair of this part from additional sources. It has been determined to be uneconomical to buy the data or rights to the data. It is uneconomical to reverse engineer the part. The subject item requires Government source approval prior to contract award, as the item is flight critical and/or the technical data available has not been determined adequate to support acquisition via full and open competition. Only the source(s) previously approved by the Government for this item have been solicited. The time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source. If you are not an approved source you must submit, together with your proposal, the information detailed in one of the NAVSUP Weapon Systems Support (NAVSUP WSS) Source Approval Information Brochures listed below. Spares: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Sup port/Business-Opps/ Repair: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP -Weapon-Systems-Support/Business-Opps/ technical data required to be submitted based on your company's experience in production of the same or similar item, or if this is an item you have never made. If your request for source approval is currently being evaluated at NAVSUP WSS submit with your offer a copy of the cover letter which forwarded your request for source approval. Offers received which fail to provide all data required by the Source Approval Brochure or document previous submission of all data required by the Source Approval Brochure will not be considered for award under this solicitation. Please note, if evaluation of a source approval request submitted hereunder cannot be processed in time and/or approval requirements preclude the ability to obtain subject items in time to meet Government requirements, award of the subject requirement may continue based on Fleet support needs. The NAVSUP WSS Commercial Item Identification Brochure is now available at: \"https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Bus iness-Opps/\" Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-2667 or 215-697-2179 (DSN: 442-2667), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. The proposed contract action is for supplies or services for which theGovernment intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.Award will be made only if the offeror, the product/service, or themanufacturer meets the qualification requirement(s) at time of award, inaccordance with FAR clause 52.209-1. The solicitation identifies the officewhere additional information can be obtained concerning qualificationrequirements and is cited in each individual solicitation.Based upon market research, the Government is not using the policies containedin FAR Part 12, Acquisition of Commercial Items, in its solicitation for thedescribed supplies or services. However, interested persons may identify tothe contracting officer their interest and capability to satisfy theGovernment's requirement with a commercial item within 15 days of this notice.One or more of the items under this acquisition is subject to: Free Trade Agreements, if DFARS clause 252.225-7036 Buy American Act--Free Trade Agreements--Balance of Payments Program, is included in thesolicitation. The World Trade Organization Government Procurement Agreement and Free Trade Agreements, if DFARS clause 252.225-7021 Trade Agreements, is included in the solicitation.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"N0038326RLA76","product_service_code":"1680"},{"dates":{"posted":"2026-03-25","posted_at":"2026-03-25T11:29:40.368Z","created_at":"2026-03-25T11:29:40.312Z","modified_at":"2026-05-09T04:06:38.805Z","response_deadline":{"raw":"2026-04-24T14:00:00-04:00","utc":"2026-04-24T18:00:00Z","date":"2026-04-24","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/58c69340e74d417783e7f9511d7c617a/view"},"naics":{"codes":["336413"],"primary":"336413"},"title":"16--CHOPPER ASSEMBLY,ED- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF","agency":{"office":{"code":"N00383","name":"NAVSUP WEAPON SYSTEMS SUPPORT"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"organization_id":"500021098","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-05-09","archive_type":"auto15"},"history":[{"index":3,"title":"16--CHOPPER ASSEMBLY,ED- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-25T11:29:40.368Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"58c69340e74d417783e7f9511d7c617a","solicitation_number":"N0038326RLA76"}],"contacts":[{"name":"Telephone: 2156973814","role":"primary","email":"KRISTIN.CLEMENS2.CIV@US.NAVY.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"58c69340e74d417783e7f9511d7c617a","lineage_id":"58c69340e74d417783e7f9511d7c617a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-10T01:30:56.749350775Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"b5d4f4aeaa0b3bad0f31918a8d9f55f6de701072aa38402cdd49da96d29c267d","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-10T01:30:56.749350775Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO|N/A|TBD|N00383|TBD|TBD|SEE SCHEDULE|SOURCE|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS PHILADELPHIA|\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rSAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9||||||||||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rLIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1||\rSECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||\rROYALTY INFORMATION (APR 1984)|1||\rTYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||\rThis solicitation is for repair.\rThis is a sole source requirement.\rThe Government physically does not have in its possession sufficient, accurate, or legible data to contract with other than the current source(s).\rThese items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at\rhttps://www.navsup.navy.mil/public/navsup/wss/business_opps/. Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation.\rFor information or questions regarding this notice, please contact Kristin Clemens at the email address: kristin.clemens2.civ@us.navy.mil.\rNAVSUP WSS Requests proposals submitted in response to this solicitation remain valid for a minimum of 120 days following submission.\rAll contractual documents related to the instant procurement are considered to be \"issued\" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email.  The Government's\racceptance of the contractor's proposal constitutes bilateral agreement to \"issue\" contractual documents as detailed herein.\r\\\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command.  Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code).  The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A)  Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B)  Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches.  These plans must note those operations and processes performed by subcontractors/ vendors.\r(C)  Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service.  Provide the most recent copies of the documents.\r(D)  A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval.  This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E)  Copy of inspection method sheets used in the manufacturing and at final inspection.  These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995.  The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc.  Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.4.1 Any item contracted for repair SHALL have a Statement of Work to ensure  compliance with all repair procedures and requirements.\rRepair of:\rNRP,SCR OUTPUT SWT ;1680-01-621-6681; NSN , ;3890AS00481-01; Part Number, Shall be performed IAW: NRP,SCR OUTPUT SWT ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.; Publication\r(s).\r1.4.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r1.5 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.6 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.7 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.8 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.9 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.10 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.11 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWCAD LAKEHURST; drawing number ( ;3890AS000481-01; ) ;80020;      , Revision ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL\rSPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.;\rand all details and specifications referenced therein.\r1.12  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.13  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2.  APPLICABLE DOCUMENTS\rDRAWING DATA=3890AS000481                            |80020| N|   |D|            |  |     |\rDRAWING DATA=3890AS000566-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS000567-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS000568-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS000569-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS000570-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS000571-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS000575-01                         |80020| E|   |D|            |  |     |\rDRAWING DATA=3890AS000917-01                         |80020| F|   |D|            |  |     |\rDRAWING DATA=3890AS001172-01                         |80020| H|   |D|            |  |     |\rDRAWING DATA=3890AS001174-01                         |80020| E|   |D|            |  |     |\rDRAWING DATA=3890AS001494-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS002118-01                         |80020| E|   |D|            |  |     |\rDRAWING DATA=3890AS002119-01                         |80020| E|   |D|            |  |     |\rDRAWING DATA=3890AS002122-01                         |80020| E|   |D|            |  |     |\rDRAWING DATA=3890AS002123-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS002130-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS002132-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS002189-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS002212-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS002216-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS002234-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS002235-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS002343-01                         |80020| F|   |D|            |  |     |\rDRAWING DATA=3890AS002364-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS002367-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS002368-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS002533-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS002665-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS004096-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS004506-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS004507-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS004508-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS004509-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS004510-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS004511-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS004512-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS004513-01                         |80020| B|   |D|            |  |     |\r3.  REQUIREMENTS\r1. Unique Requirements:\r    a. Listed in Official remarks.\r    b. Listed in Official remarks.\r    c. The contractor/overhaul activity shall provide the repair procedure they will follow to NAWCADLKE engineering for review and approval prior to commencing repairs. The repair procedure shall be forwarded per the Overhaul/Repair Procedure CDRL provided in\rthis document. NAWCADLKE engineering POC is Christian.padilla.7.civ@us.navy.mil.\r2. Interim Inspection Requirements: N/A\r3. ALRE CSI parts require certification.\r   a. When certified, an ALRE part is marked with a Material Identification Code (MIC). NAWCADLKE QA will provide the MIC to DCMA if the component is source accepted, and after receipt of all associated data. Application of MIC shall be in the same methodology\ras the drawing note for part marking, and in same area as part marking (next to, above, or below).\r4. Receipt inspection and Certification of Sub-Components:\r   a. P/Ns 3890AS000566-01, 3890AS000570-01, and 3890AS000575-01 will be certified and marked as directed by NAWCADLKE.\r5. Receipt Inspection and Certification of the Top Assembly:\ra. The receipt Inspection and Certification of the Top Assembly, P/N 3890AS000481-01, shall occur during the final inspection.\r6. Contractor Assist and Part Marking:\r   a. The contractor shall assist on the conduct of the inspections (both final and interim) required that are necessary to certify the critical items specified herein. The contractor shall provide adequate facilities, inspection equipment, and skilled\rpersonnel, to support the NAWCADLKE Inspector in the conduct of the interim inspection(s). The contractor shall provide gauges, tools, fixtures, and jigs necessary to perform the inspections. The contractor shall also provide sufficient rigging/material\rhandling services and manpower to setup/configure/operate equipment & machines used to accomplish the inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities. As part of the MRI process, the NAWCADLKE QA\rrepresentative will provide, in writing, a certification number along with direction for marking the Critical Safety Items (CSI).\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing  procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a  Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for  items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract.  Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rNRP,SCR OUTPUT SWT ;3890AS000481-01; P/N, ;1680-01-621-6681; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in  these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract.  Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk.  If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change.  The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which  shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER).  An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract.  Items determined BER are not included in the contract price.  The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER.  All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager.  After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.  The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO.  Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI).  A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs).  Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s).  The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA.  The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO.  Items received by the contractor missing consumable parts are not MOI items.  Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.\r3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA).\r3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:\r3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the\rInventory Manager whether a SRA may be replaced by one or more of the following options:  Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s),  otherwise be provided direction for obtaining the SRA(s) at no cost to the\rcontractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.\r3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s).  When authorized, the procedures set forth in paragraph 3.0 of Section\r6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.\r3.4.10 Over and Above Repair (OAR).  An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and\ris not included in the contract pricing due to the nature or scope of the repair needed for that particular item.   Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units\rdetermined by the contractor to require OAR effort.  All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior\rto undertaking repair of the item.\rAfter receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.  Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations\rand DCMA disposal procedures and requirements.\r3.5 4.0 PARTS AND MATERIALS\r3.5.1 General.  The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM).  All parts and material\rused in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein.\rAuthorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO.  In addition, cannibalization must be approved by the PCO.  Cannibalization of units that have not been inducted is not typically authorized and\rrequires specific approval by the PCO.\r3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract.  Any change to such parts/material drawings or specifications\rrequires Government approval in accordance with the Configuration Management provisions of this Statement of Work.  Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which\rrequire source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item.  If the contractor is the DCA, the contractor may approve approve changes to\rmanufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own\rrisk.  If the Government disapproves the requested change, the contractor shall  replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the\rGovernment's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.\r3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the\rrequirements of this contract.\r3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall\rprovide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of\rsuch inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with\rappropriate pass/fail criteria such as certifications\rand actual dimensonal readings.\r3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE.\r3.5.6\r3.6 SOURCE AND LOCATION OF REPAIR SOURCE:\r3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.\rNRP,SCR OUTPUT SWT ;GENERAL ATOMICS; Company Name , ;3550 GENERAL ATOMICS CT,  SAN DIEGO, CA 92121-1122; Address , ;4V360; Cage Code\rinspection will be accomplished on the contractor's equipment\r3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:\r3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to\rpromptly detect, correct and prevent conditions that adversely affect quality.\r3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.\r3.8 6.0 CONFIGURATION MANAGEMENT (CM):\r3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).\r3.9 7.0 MARKINGS.\r3.9.1 Marking shall be as indicated in the contract when applicable.\r3.10 8.0 STORAGE;\r3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.\r4.  QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The solicitation/contract shall contain the NAWCADLKE inspection surveillance clause as follows:\r   a. Because of the critical nature of this material, a representative of the Naval Air Warfare Center Aircraft Division Lakehurst (NAWCADLKE) is available to furnish technical assistance on Quality Assurance (QA) matters and shall have the option of\rconducting QA surveillance for the first lot produced under this contract (and all subsequent lots if necessary). This requirement will be performed in conjunction with the government QAS of the cognizant Defense Contract Management Activity and does not\rabrogate the authority or responsibility of the designated government QAS. The contractor agrees to notify Gianpiero.geranio.civ@us.navy.mil, NAWC QA section Code BL41600, Lakehurst, NJ 08733-5035 and the PCO when the material is scheduled to be presented to\rthe DCMA government QAS for Government inspection and acceptance. This notice shall afford the NAWCADLKE QA representative the option of being present during the inspection. A minimum of fourteen (14) working days is required to arrange the surveillance visit.\rNotification shall include the following information: Company Name, Cage Code, Phone number, Fax number, Contract number, Point of Contact, Part Nomenclature, Part Number, NIIN, Type of Inspection, and Quantity of parts.\r    b. N/A\r 2. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\r   a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\r   b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\r   c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\r   d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r 3. The material covered in this contract/purchase order will be used in a crucial shipboard system supporting the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious\rpersonnel injury, loss of life, loss of vital shipboard systems, or loss of aircraft. Therefore, the material has been designated as Critical Safety Item (CSI) material and special control procedures are invoked to ensure receipt of correct material.\r4. First Article Testing: N/A\r5. Production Lot Special Tests: N/A\r6. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing.\r7. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed be-low as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be\rbear the symbols of accreditation and the accreditation body:\r   a. American Association for Laboratory Accreditation (A2LA)\r   b. ANSI National Accreditation Board (ANAB)\r   c. International Accreditation Service, Inc. (IAS)\r   d. National Voluntary Laboratory Accreditation Program (NVLAP)\r   e. Perry Johnson Laboratory Accreditation, Inc. (PJLA)\r   f. Canadian Association for Laboratory Accreditation Inc.\r      (CALA)\r   g. Standards Council of Canada (SCC)\r4.1  Review documentation as provided under DD 1423 requirements.\r4.2 .  Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r  A.  Level of Inspection (LOI).\r      1.  Critical characteristics:  100% inspection shall apply.\r      2.  Major and Minor characteristics:  LOI shall be in accordance with a           sampling plan acceptable to the QAR.\r  B.  Critical characteristics:\r      ;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\r   C.  Major and Minor characteristics\r      1.  Shall be defined by the contractor subject to QAR concurrence,       unless defined on applicable drawings and associated specifications.\r4.3 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\rto arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r4.4 IN PROCESS INSPECTION REQUIREMENTS:\rDue to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA\r;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\rto arrange for the in-process inspection.\rA minimum of 10 days is needed for advance notice for each occurrence.\rThe authority of the QAR shall not be abrogated. The QAR shall verify that\rtimely notification was given all parties listed below.\rCHARACTERISICS TO BE INSPECTED:\r;SEE QUALITY ASSURANCE REQUIREMENTS FOR FURTHER DETAILS1. Document CSI ii. P/N;\r; ; ; ; ; ; ; ; ; ;\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10102)\r                       REPAIR TDR (25-10050)\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMITTED & BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION\rANY COMPANY NOT PREVIOUSLY APPROVED MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rAll records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE CognizantTechnical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection\rData Requirements:\r   a. Copies of all approved requests for variations.\r   b. Test results as recorded in Appendix A of Test Procedure 33000P00198.\r   c. All required torque values, as well as QA verification of them, as cited in \"51-5AGS-1 Operational, Organizational Level, Intermediate Level, and Depot Level Maintenance Manual with Illustrated Parts Breakdown - SCR Output Switch Assembly\".\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Prior to commencing overhaul\rIf the extent of the repair effort for this assembly is beyond the scope of the existing NAWCADLKE/NAVAIR approved overhaul/repair procedure for this assembly then the overhauling contractor or activity shall provide a step-by-step overhaul procedure for\rdisassembly and reassembly. NAWCADLKE engineering POC is Christian Padilla, christian.padilla7.civ@us.navy.mil.\rThe overhaul procedure shall be subject to NAVAIR approval prior to commencing overhaul. The procedure shall include SUGGESTED quality assurance \"hold points\" as required to ensure that any CSI/CAI components or processes that cannot be adequately inspected at\rfinal assembly are accessible for proper interim inspection.\r1.  SCOPE\r1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure  compliance with all repair procedures and requirements.\rRepair of:\rCHOPPER ASSEMBLY,ED ;1680-016216686; NSN , ;3890AS000508-01; Part Number, Shall be performed IAW: CHOPPER ASSEMBLY,ED ;Repair/overhaul/inspect in accordance with applicable repair manual, technical specifications, engineering orders and drawings.; Publication\r(s).\r1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r2.  APPLICABLE DOCUMENTS - NOT APPLICABLE\r3.  REQUIREMENTS\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing  procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a  Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for  items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract.  Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rCHOPPER ASSEMBLY,ED ;3890AS000508-01; P/N, ;1680-016216686; NSN, ;Repair/overhaul/inspect in accordance with applicable repair manual, technical specifications, engineering orders and drawings.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in  these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract.  Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk.  If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change.  The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which  shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER).  An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract.  Items determined BER are not included in the contract price.  The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER.  All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager.  After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.  The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO.  Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI).  A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs).  Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s).  The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA.  The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO.  Items received by the contractor missing consumable parts are not MOI items.  Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.\r3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA).\r3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:\r3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the\rInventory Manager whether a SRA may be replaced by one or more of the following options:  Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s),  otherwise be provided direction for obtaining the SRA(s) at no cost to the\rcontractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.\r3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s).  When authorized, the procedures set forth in paragraph 3.0 of Section\r6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.\r3.4.10 Over and Above Repair (OAR).  An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and\ris not included in the contract pricing due to the nature or scope of the repair needed for that particular item.   Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units\rdetermined by the contractor to require OAR effort.  All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior\rto undertaking repair of the item.\rAfter receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.  Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations\rand DCMA disposal procedures and requirements.\r3.5 4.0 PARTS AND MATERIALS\r3.5.1 General.  The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM).  All parts and material\rused in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein.\rAuthorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO.  In addition, cannibalization must be approved by the PCO.  Cannibalization of units that have not been inducted is not typically authorized and\rrequires specific approval by the PCO.\r3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract.  Any change to such parts/material drawings or specifications\rrequires Government approval in accordance with the Configuration Management provisions of this Statement of Work.  Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which\rrequire source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item.  If the contractor is the DCA, the contractor may approve approve changes to\rmanufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own\rrisk.  If the Government disapproves the requested change, the contractor shall  replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the\rGovernment's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.\r3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the\rrequirements of this contract.\r3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall\rprovide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of\rsuch inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with\rappropriate pass/fail criteria such as certifications\rand actual dimensonal readings.\r3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE.\r3.5.6\r3.6 SOURCE AND LOCATION OF REPAIR SOURCE:\r3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.\rCHOPPER ASSEMBLY,ED ;GENERAL ATOMICS; Company Name , ;3550 GENERAL ATOMICS CT, SAN DIEGO CA 92121-1122        ; Address , ;4V360; Cage Code\rinspection will be accomplished on the contractor's equipment\r3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:\r3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to\rpromptly detect, correct and prevent conditions that adversely affect quality.\r3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.\r3.8 6.0 CONFIGURATION MANAGEMENT (CM):\r3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).\r3.9 7.0 MARKINGS.\r3.9.1 Marking shall be as indicated in the contract when applicable.\r3.10 8.0 STORAGE;\r3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.\r4.  QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE\rTHIS ALRE ITEM HAS BEEN IDENTIFIED AS NON-CRITICAL.\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 .  The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility.  These sheets shall not be\rrevised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO.\r1.3 . Unless otherwise specified, for fabricated parts, the Inspection\rMethod Sheets/ Final Inspection Sheets shall list the characteristics\rof each item produced under the contract.\rThe manufacturer shall be required to provide certifications of all raw\rmaterial including castings and forgings. the material source shall be\ridentified and the documentation shall be able to identify the customer\rand/or contract number. The manufacturer shall maintain all raw material\rdocumentation for a minimum of ten (10) years.\rThe contractor  is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for\rALL Characteristics,in addition, critical characteristics shall be\rannotated.\rThe contractor shall notify NAVICP Code 072 when material required by this contract has been shipped to Destination.This shall be accomplished by sending\ra copy of the DD Form 250, Material Inspection and Receiving Report to:\rNaval Inventory Control Point\rATTN: Code 072\r700 Robbins Avenue, Phila., PA 19111\ror by submitting a facsimile to FAX: (215)697-2524, ATTN: Code 072.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;0401741041   ; drawing number ( ;5B2G7; ) ;QINETIQ ;      , Revision ;LATEST REVISION APPLICABLE; and all details and specifications referenced therein.\r1.11  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r1.13 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.13.1 Any item contracted for repair SHALL have a Statement of Work to ensure  compliance with all repair procedures and requirements.\rRepair of:\rPOSITION SENSOR CON ;1680-01-644-7167; NSN , ;0401741041; Part Number, Shall be performed IAW: POSITION SENSOR CON ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.; Publication (s).\r1.13.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r2.  APPLICABLE DOCUMENTS - NOT APPLICABLE\r3.  REQUIREMENTS\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing  procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a  Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for  items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract.  Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rPOSITION SENSOR CON ;0401741041; P/N, ;1680-01-644-7167; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in  these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract.  Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk.  If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change.  The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which  shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER).  An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract.  Items determined BER are not included in the contract price.  The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER.  All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager.  After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.  The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO.  Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI).  A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs).  Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s).  The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA.  The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO.  Items received by the contractor missing consumable parts are not MOI items.  Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under t","text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO|N/A|TBD|N00383|TBD|TBD|SEE SCHEDULE|SOURCE|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS PHILADELPHIA|\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rSAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9||||||||||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rLIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1||\rSECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||\rROYALTY INFORMATION (APR 1984)|1||\rTYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||\rThis solicitation is for repair.\rThis is a sole source requirement.\rThe Government physically does not have in its possession sufficient, accurate, or legible data to contract with other than the current source(s).\rThese items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at\rhttps://www.navsup.navy.mil/public/navsup/wss/business_opps/. Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation.\rFor information or questions regarding this notice, please contact Kristin Clemens at the email address: kristin.clemens2.civ@us.navy.mil.\rNAVSUP WSS Requests proposals submitted in response to this solicitation remain valid for a minimum of 120 days following submission.\rAll contractual documents related to the instant procurement are considered to be \"issued\" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's\racceptance of the contractor's proposal constitutes bilateral agreement to \"issue\" contractual documents as detailed herein.\r\\\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors.\r(C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents.\r(D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.4.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements.\rRepair of:\rNRP,SCR OUTPUT SWT ;1680-01-621-6681; NSN , ;3890AS00481-01; Part Number, Shall be performed IAW: NRP,SCR OUTPUT SWT ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.; Publication\r(s).\r1.4.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r1.5 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.6 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.7 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.8 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.9 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.10 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.11 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWCAD LAKEHURST; drawing number ( ;3890AS000481-01; ) ;80020; , Revision ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL\rSPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.;\rand all details and specifications referenced therein.\r1.12 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.13 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2. APPLICABLE DOCUMENTS\rDRAWING DATA=3890AS000481 |80020| N| |D| | | |\rDRAWING DATA=3890AS000566-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS000567-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS000568-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS000569-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS000570-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS000571-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS000575-01 |80020| E| |D| | | |\rDRAWING DATA=3890AS000917-01 |80020| F| |D| | | |\rDRAWING DATA=3890AS001172-01 |80020| H| |D| | | |\rDRAWING DATA=3890AS001174-01 |80020| E| |D| | | |\rDRAWING DATA=3890AS001494-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS002118-01 |80020| E| |D| | | |\rDRAWING DATA=3890AS002119-01 |80020| E| |D| | | |\rDRAWING DATA=3890AS002122-01 |80020| E| |D| | | |\rDRAWING DATA=3890AS002123-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS002130-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS002132-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS002189-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS002212-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS002216-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS002234-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS002235-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS002343-01 |80020| F| |D| | | |\rDRAWING DATA=3890AS002364-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS002367-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS002368-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS002533-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS002665-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS004096-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS004506-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS004507-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS004508-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS004509-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS004510-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS004511-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS004512-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS004513-01 |80020| B| |D| | | |\r3. REQUIREMENTS\r1. Unique Requirements:\r a. Listed in Official remarks.\r b. Listed in Official remarks.\r c. The contractor/overhaul activity shall provide the repair procedure they will follow to NAWCADLKE engineering for review and approval prior to commencing repairs. The repair procedure shall be forwarded per the Overhaul/Repair Procedure CDRL provided in\rthis document. NAWCADLKE engineering POC is Christian.padilla.7.civ@us.navy.mil.\r2. Interim Inspection Requirements: N/A\r3. ALRE CSI parts require certification.\r a. When certified, an ALRE part is marked with a Material Identification Code (MIC). NAWCADLKE QA will provide the MIC to DCMA if the component is source accepted, and after receipt of all associated data. Application of MIC shall be in the same methodology\ras the drawing note for part marking, and in same area as part marking (next to, above, or below).\r4. Receipt inspection and Certification of Sub-Components:\r a. P/Ns 3890AS000566-01, 3890AS000570-01, and 3890AS000575-01 will be certified and marked as directed by NAWCADLKE.\r5. Receipt Inspection and Certification of the Top Assembly:\ra. The receipt Inspection and Certification of the Top Assembly, P/N 3890AS000481-01, shall occur during the final inspection.\r6. Contractor Assist and Part Marking:\r a. The contractor shall assist on the conduct of the inspections (both final and interim) required that are necessary to certify the critical items specified herein. The contractor shall provide adequate facilities, inspection equipment, and skilled\rpersonnel, to support the NAWCADLKE Inspector in the conduct of the interim inspection(s). The contractor shall provide gauges, tools, fixtures, and jigs necessary to perform the inspections. The contractor shall also provide sufficient rigging/material\rhandling services and manpower to setup/configure/operate equipment & machines used to accomplish the inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities. As part of the MRI process, the NAWCADLKE QA\rrepresentative will provide, in writing, a certification number along with direction for marking the Critical Safety Items (CSI).\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rNRP,SCR OUTPUT SWT ;3890AS000481-01; P/N, ;1680-01-621-6681; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.\r3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA).\r3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:\r3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the\rInventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the\rcontractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.\r3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section\r6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.\r3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and\ris not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units\rdetermined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior\rto undertaking repair of the item.\rAfter receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations\rand DCMA disposal procedures and requirements.\r3.5 4.0 PARTS AND MATERIALS\r3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material\rused in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein.\rAuthorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and\rrequires specific approval by the PCO.\r3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications\rrequires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which\rrequire source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to\rmanufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own\rrisk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the\rGovernment's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.\r3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the\rrequirements of this contract.\r3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall\rprovide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of\rsuch inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with\rappropriate pass/fail criteria such as certifications\rand actual dimensonal readings.\r3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE.\r3.5.6\r3.6 SOURCE AND LOCATION OF REPAIR SOURCE:\r3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.\rNRP,SCR OUTPUT SWT ;GENERAL ATOMICS; Company Name , ;3550 GENERAL ATOMICS CT, SAN DIEGO, CA 92121-1122; Address , ;4V360; Cage Code\rinspection will be accomplished on the contractor's equipment\r3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:\r3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to\rpromptly detect, correct and prevent conditions that adversely affect quality.\r3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.\r3.8 6.0 CONFIGURATION MANAGEMENT (CM):\r3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).\r3.9 7.0 MARKINGS.\r3.9.1 Marking shall be as indicated in the contract when applicable.\r3.10 8.0 STORAGE;\r3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.\r4. QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The solicitation/contract shall contain the NAWCADLKE inspection surveillance clause as follows:\r a. Because of the critical nature of this material, a representative of the Naval Air Warfare Center Aircraft Division Lakehurst (NAWCADLKE) is available to furnish technical assistance on Quality Assurance (QA) matters and shall have the option of\rconducting QA surveillance for the first lot produced under this contract (and all subsequent lots if necessary). This requirement will be performed in conjunction with the government QAS of the cognizant Defense Contract Management Activity and does not\rabrogate the authority or responsibility of the designated government QAS. The contractor agrees to notify Gianpiero.geranio.civ@us.navy.mil, NAWC QA section Code BL41600, Lakehurst, NJ 08733-5035 and the PCO when the material is scheduled to be presented to\rthe DCMA government QAS for Government inspection and acceptance. This notice shall afford the NAWCADLKE QA representative the option of being present during the inspection. A minimum of fourteen (14) working days is required to arrange the surveillance visit.\rNotification shall include the following information: Company Name, Cage Code, Phone number, Fax number, Contract number, Point of Contact, Part Nomenclature, Part Number, NIIN, Type of Inspection, and Quantity of parts.\r b. N/A\r 2. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\r a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\r b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\r c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\r d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r 3. The material covered in this contract/purchase order will be used in a crucial shipboard system supporting the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious\rpersonnel injury, loss of life, loss of vital shipboard systems, or loss of aircraft. Therefore, the material has been designated as Critical Safety Item (CSI) material and special control procedures are invoked to ensure receipt of correct material.\r4. First Article Testing: N/A\r5. Production Lot Special Tests: N/A\r6. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing.\r7. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed be-low as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be\rbear the symbols of accreditation and the accreditation body:\r a. American Association for Laboratory Accreditation (A2LA)\r b. ANSI National Accreditation Board (ANAB)\r c. International Accreditation Service, Inc. (IAS)\r d. National Voluntary Laboratory Accreditation Program (NVLAP)\r e. Perry Johnson Laboratory Accreditation, Inc. (PJLA)\r f. Canadian Association for Laboratory Accreditation Inc.\r (CALA)\r g. Standards Council of Canada (SCC)\r4.1 Review documentation as provided under DD 1423 requirements.\r4.2 . Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r A. Level of Inspection (LOI).\r 1. Critical characteristics: 100% inspection shall apply.\r 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR.\r B. Critical characteristics:\r ;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\r C. Major and Minor characteristics\r 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications.\r4.3 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\rto arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r4.4 IN PROCESS INSPECTION REQUIREMENTS:\rDue to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA\r;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\rto arrange for the in-process inspection.\rA minimum of 10 days is needed for advance notice for each occurrence.\rThe authority of the QAR shall not be abrogated. The QAR shall verify that\rtimely notification was given all parties listed below.\rCHARACTERISICS TO BE INSPECTED:\r;SEE QUALITY ASSURANCE REQUIREMENTS FOR FURTHER DETAILS1. Document CSI ii. P/N;\r; ; ; ; ; ; ; ; ; ;\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10102)\r REPAIR TDR (25-10050)\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMITTED & BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION\rANY COMPANY NOT PREVIOUSLY APPROVED MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rAll records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE CognizantTechnical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection\rData Requirements:\r a. Copies of all approved requests for variations.\r b. Test results as recorded in Appendix A of Test Procedure 33000P00198.\r c. All required torque values, as well as QA verification of them, as cited in \"51-5AGS-1 Operational, Organizational Level, Intermediate Level, and Depot Level Maintenance Manual with Illustrated Parts Breakdown - SCR Output Switch Assembly\".\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Prior to commencing overhaul\rIf the extent of the repair effort for this assembly is beyond the scope of the existing NAWCADLKE/NAVAIR approved overhaul/repair procedure for this assembly then the overhauling contractor or activity shall provide a step-by-step overhaul procedure for\rdisassembly and reassembly. NAWCADLKE engineering POC is Christian Padilla, christian.padilla7.civ@us.navy.mil.\rThe overhaul procedure shall be subject to NAVAIR approval prior to commencing overhaul. The procedure shall include SUGGESTED quality assurance \"hold points\" as required to ensure that any CSI/CAI components or processes that cannot be adequately inspected at\rfinal assembly are accessible for proper interim inspection.\r1. SCOPE\r1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements.\rRepair of:\rCHOPPER ASSEMBLY,ED ;1680-016216686; NSN , ;3890AS000508-01; Part Number, Shall be performed IAW: CHOPPER ASSEMBLY,ED ;Repair/overhaul/inspect in accordance with applicable repair manual, technical specifications, engineering orders and drawings.; Publication\r(s).\r1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r2. APPLICABLE DOCUMENTS - NOT APPLICABLE\r3. REQUIREMENTS\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rCHOPPER ASSEMBLY,ED ;3890AS000508-01; P/N, ;1680-016216686; NSN, ;Repair/overhaul/inspect in accordance with applicable repair manual, technical specifications, engineering orders and drawings.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.\r3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA).\r3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:\r3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the\rInventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the\rcontractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.\r3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section\r6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.\r3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and\ris not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units\rdetermined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior\rto undertaking repair of the item.\rAfter receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations\rand DCMA disposal procedures and requirements.\r3.5 4.0 PARTS AND MATERIALS\r3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material\rused in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein.\rAuthorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and\rrequires specific approval by the PCO.\r3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications\rrequires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which\rrequire source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to\rmanufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own\rrisk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the\rGovernment's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.\r3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the\rrequirements of this contract.\r3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall\rprovide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of\rsuch inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with\rappropriate pass/fail criteria such as certifications\rand actual dimensonal readings.\r3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE.\r3.5.6\r3.6 SOURCE AND LOCATION OF REPAIR SOURCE:\r3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.\rCHOPPER ASSEMBLY,ED ;GENERAL ATOMICS; Company Name , ;3550 GENERAL ATOMICS CT, SAN DIEGO CA 92121-1122 ; Address , ;4V360; Cage Code\rinspection will be accomplished on the contractor's equipment\r3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:\r3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to\rpromptly detect, correct and prevent conditions that adversely affect quality.\r3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.\r3.8 6.0 CONFIGURATION MANAGEMENT (CM):\r3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).\r3.9 7.0 MARKINGS.\r3.9.1 Marking shall be as indicated in the contract when applicable.\r3.10 8.0 STORAGE;\r3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.\r4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE\rTHIS ALRE ITEM HAS BEEN IDENTIFIED AS NON-CRITICAL.\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be\rrevised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO.\r1.3 . Unless otherwise specified, for fabricated parts, the Inspection\rMethod Sheets/ Final Inspection Sheets shall list the characteristics\rof each item produced under the contract.\rThe manufacturer shall be required to provide certifications of all raw\rmaterial including castings and forgings. the material source shall be\ridentified and the documentation shall be able to identify the customer\rand/or contract number. The manufacturer shall maintain all raw material\rdocumentation for a minimum of ten (10) years.\rThe contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for\rALL Characteristics,in addition, critical characteristics shall be\rannotated.\rThe contractor shall notify NAVICP Code 072 when material required by this contract has been shipped to Destination.This shall be accomplished by sending\ra copy of the DD Form 250, Material Inspection and Receiving Report to:\rNaval Inventory Control Point\rATTN: Code 072\r700 Robbins Avenue, Phila., PA 19111\ror by submitting a facsimile to FAX: (215)697-2524, ATTN: Code 072.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;0401741041 ; drawing number ( ;5B2G7; ) ;QINETIQ ; , Revision ;LATEST REVISION APPLICABLE; and all details and specifications referenced therein.\r1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r1.13 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.13.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements.\rRepair of:\rPOSITION SENSOR CON ;1680-01-644-7167; NSN , ;0401741041; Part Number, Shall be performed IAW: POSITION SENSOR CON ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.; Publication (s).\r1.13.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r2. APPLICABLE DOCUMENTS - NOT APPLICABLE\r3. REQUIREMENTS\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rPOSITION SENSOR CON ;0401741041; P/N, ;1680-01-644-7167; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under t","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N0038326RLA76","product_service_code":"1680"}],"due_at":"2026-04-24T18:00:00Z","due_date":"2026-04-24","closes_at":"2026-04-24T18:00:00Z","awardable":true,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00383","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":null,"state_evidence":"Product purchase (PSC 1680)","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-10T01:47:10.954949Z","principal_notice_id":"58c69340e74d417783e7f9511d7c617a","description":{"text":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO|N/A|TBD|N00383|TBD|TBD|SEE SCHEDULE|SOURCE|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS PHILADELPHIA|\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rSAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9||||||||||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rLIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1||\rSECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||\rROYALTY INFORMATION (APR 1984)|1||\rTYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||\rThis solicitation is for repair.\rThis is a sole source requirement.\rThe Government physically does not have in its possession sufficient, accurate, or legible data to contract with other than the current source(s).\rThese items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at\rhttps://www.navsup.navy.mil/public/navsup/wss/business_opps/. Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation.\rFor information or questions regarding this notice, please contact Kristin Clemens at the email address: kristin.clemens2.civ@us.navy.mil.\rNAVSUP WSS Requests proposals submitted in response to this solicitation remain valid for a minimum of 120 days following submission.\rAll contractual documents related to the instant procurement are considered to be \"issued\" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's\racceptance of the contractor's proposal constitutes bilateral agreement to \"issue\" contractual documents as detailed herein.\r\\\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors.\r(C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents.\r(D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.4.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements.\rRepair of:\rNRP,SCR OUTPUT SWT ;1680-01-621-6681; NSN , ;3890AS00481-01; Part Number, Shall be performed IAW: NRP,SCR OUTPUT SWT ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.; Publication\r(s).\r1.4.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r1.5 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.6 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.7 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.8 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.9 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.10 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.11 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWCAD LAKEHURST; drawing number ( ;3890AS000481-01; ) ;80020; , Revision ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL\rSPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.;\rand all details and specifications referenced therein.\r1.12 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.13 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2. APPLICABLE DOCUMENTS\rDRAWING DATA=3890AS000481 |80020| N| |D| | | |\rDRAWING DATA=3890AS000566-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS000567-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS000568-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS000569-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS000570-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS000571-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS000575-01 |80020| E| |D| | | |\rDRAWING DATA=3890AS000917-01 |80020| F| |D| | | |\rDRAWING DATA=3890AS001172-01 |80020| H| |D| | | |\rDRAWING DATA=3890AS001174-01 |80020| E| |D| | | |\rDRAWING DATA=3890AS001494-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS002118-01 |80020| E| |D| | | |\rDRAWING DATA=3890AS002119-01 |80020| E| |D| | | |\rDRAWING DATA=3890AS002122-01 |80020| E| |D| | | |\rDRAWING DATA=3890AS002123-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS002130-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS002132-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS002189-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS002212-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS002216-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS002234-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS002235-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS002343-01 |80020| F| |D| | | |\rDRAWING DATA=3890AS002364-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS002367-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS002368-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS002533-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS002665-01 |80020| A| |D| | | |\rDRAWING DATA=3890AS004096-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS004506-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS004507-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS004508-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS004509-01 |80020| D| |D| | | |\rDRAWING DATA=3890AS004510-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS004511-01 |80020| B| |D| | | |\rDRAWING DATA=3890AS004512-01 |80020| C| |D| | | |\rDRAWING DATA=3890AS004513-01 |80020| B| |D| | | |\r3. REQUIREMENTS\r1. Unique Requirements:\r a. Listed in Official remarks.\r b. Listed in Official remarks.\r c. The contractor/overhaul activity shall provide the repair procedure they will follow to NAWCADLKE engineering for review and approval prior to commencing repairs. The repair procedure shall be forwarded per the Overhaul/Repair Procedure CDRL provided in\rthis document. NAWCADLKE engineering POC is Christian.padilla.7.civ@us.navy.mil.\r2. Interim Inspection Requirements: N/A\r3. ALRE CSI parts require certification.\r a. When certified, an ALRE part is marked with a Material Identification Code (MIC). NAWCADLKE QA will provide the MIC to DCMA if the component is source accepted, and after receipt of all associated data. Application of MIC shall be in the same methodology\ras the drawing note for part marking, and in same area as part marking (next to, above, or below).\r4. Receipt inspection and Certification of Sub-Components:\r a. P/Ns 3890AS000566-01, 3890AS000570-01, and 3890AS000575-01 will be certified and marked as directed by NAWCADLKE.\r5. Receipt Inspection and Certification of the Top Assembly:\ra. The receipt Inspection and Certification of the Top Assembly, P/N 3890AS000481-01, shall occur during the final inspection.\r6. Contractor Assist and Part Marking:\r a. The contractor shall assist on the conduct of the inspections (both final and interim) required that are necessary to certify the critical items specified herein. The contractor shall provide adequate facilities, inspection equipment, and skilled\rpersonnel, to support the NAWCADLKE Inspector in the conduct of the interim inspection(s). The contractor shall provide gauges, tools, fixtures, and jigs necessary to perform the inspections. The contractor shall also provide sufficient rigging/material\rhandling services and manpower to setup/configure/operate equipment & machines used to accomplish the inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities. As part of the MRI process, the NAWCADLKE QA\rrepresentative will provide, in writing, a certification number along with direction for marking the Critical Safety Items (CSI).\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rNRP,SCR OUTPUT SWT ;3890AS000481-01; P/N, ;1680-01-621-6681; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.\r3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA).\r3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:\r3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the\rInventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the\rcontractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.\r3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section\r6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.\r3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and\ris not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units\rdetermined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior\rto undertaking repair of the item.\rAfter receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations\rand DCMA disposal procedures and requirements.\r3.5 4.0 PARTS AND MATERIALS\r3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material\rused in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein.\rAuthorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and\rrequires specific approval by the PCO.\r3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications\rrequires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which\rrequire source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to\rmanufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own\rrisk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the\rGovernment's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.\r3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the\rrequirements of this contract.\r3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall\rprovide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of\rsuch inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with\rappropriate pass/fail criteria such as certifications\rand actual dimensonal readings.\r3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE.\r3.5.6\r3.6 SOURCE AND LOCATION OF REPAIR SOURCE:\r3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.\rNRP,SCR OUTPUT SWT ;GENERAL ATOMICS; Company Name , ;3550 GENERAL ATOMICS CT, SAN DIEGO, CA 92121-1122; Address , ;4V360; Cage Code\rinspection will be accomplished on the contractor's equipment\r3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:\r3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to\rpromptly detect, correct and prevent conditions that adversely affect quality.\r3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.\r3.8 6.0 CONFIGURATION MANAGEMENT (CM):\r3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).\r3.9 7.0 MARKINGS.\r3.9.1 Marking shall be as indicated in the contract when applicable.\r3.10 8.0 STORAGE;\r3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.\r4. QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The solicitation/contract shall contain the NAWCADLKE inspection surveillance clause as follows:\r a. Because of the critical nature of this material, a representative of the Naval Air Warfare Center Aircraft Division Lakehurst (NAWCADLKE) is available to furnish technical assistance on Quality Assurance (QA) matters and shall have the option of\rconducting QA surveillance for the first lot produced under this contract (and all subsequent lots if necessary). This requirement will be performed in conjunction with the government QAS of the cognizant Defense Contract Management Activity and does not\rabrogate the authority or responsibility of the designated government QAS. The contractor agrees to notify Gianpiero.geranio.civ@us.navy.mil, NAWC QA section Code BL41600, Lakehurst, NJ 08733-5035 and the PCO when the material is scheduled to be presented to\rthe DCMA government QAS for Government inspection and acceptance. This notice shall afford the NAWCADLKE QA representative the option of being present during the inspection. A minimum of fourteen (14) working days is required to arrange the surveillance visit.\rNotification shall include the following information: Company Name, Cage Code, Phone number, Fax number, Contract number, Point of Contact, Part Nomenclature, Part Number, NIIN, Type of Inspection, and Quantity of parts.\r b. N/A\r 2. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\r a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\r b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\r c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\r d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r 3. The material covered in this contract/purchase order will be used in a crucial shipboard system supporting the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious\rpersonnel injury, loss of life, loss of vital shipboard systems, or loss of aircraft. Therefore, the material has been designated as Critical Safety Item (CSI) material and special control procedures are invoked to ensure receipt of correct material.\r4. First Article Testing: N/A\r5. Production Lot Special Tests: N/A\r6. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing.\r7. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed be-low as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be\rbear the symbols of accreditation and the accreditation body:\r a. American Association for Laboratory Accreditation (A2LA)\r b. ANSI National Accreditation Board (ANAB)\r c. International Accreditation Service, Inc. (IAS)\r d. National Voluntary Laboratory Accreditation Program (NVLAP)\r e. Perry Johnson Laboratory Accreditation, Inc. (PJLA)\r f. Canadian Association for Laboratory Accreditation Inc.\r (CALA)\r g. Standards Council of Canada (SCC)\r4.1 Review documentation as provided under DD 1423 requirements.\r4.2 . Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r A. Level of Inspection (LOI).\r 1. Critical characteristics: 100% inspection shall apply.\r 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR.\r B. Critical characteristics:\r ;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\r C. Major and Minor characteristics\r 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications.\r4.3 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\rto arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r4.4 IN PROCESS INSPECTION REQUIREMENTS:\rDue to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA\r;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\rto arrange for the in-process inspection.\rA minimum of 10 days is needed for advance notice for each occurrence.\rThe authority of the QAR shall not be abrogated. The QAR shall verify that\rtimely notification was given all parties listed below.\rCHARACTERISICS TO BE INSPECTED:\r;SEE QUALITY ASSURANCE REQUIREMENTS FOR FURTHER DETAILS1. Document CSI ii. P/N;\r; ; ; ; ; ; ; ; ; ;\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10102)\r REPAIR TDR (25-10050)\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMITTED & BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION\rANY COMPANY NOT PREVIOUSLY APPROVED MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rAll records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE CognizantTechnical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection\rData Requirements:\r a. Copies of all approved requests for variations.\r b. Test results as recorded in Appendix A of Test Procedure 33000P00198.\r c. All required torque values, as well as QA verification of them, as cited in \"51-5AGS-1 Operational, Organizational Level, Intermediate Level, and Depot Level Maintenance Manual with Illustrated Parts Breakdown - SCR Output Switch Assembly\".\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Prior to commencing overhaul\rIf the extent of the repair effort for this assembly is beyond the scope of the existing NAWCADLKE/NAVAIR approved overhaul/repair procedure for this assembly then the overhauling contractor or activity shall provide a step-by-step overhaul procedure for\rdisassembly and reassembly. NAWCADLKE engineering POC is Christian Padilla, christian.padilla7.civ@us.navy.mil.\rThe overhaul procedure shall be subject to NAVAIR approval prior to commencing overhaul. The procedure shall include SUGGESTED quality assurance \"hold points\" as required to ensure that any CSI/CAI components or processes that cannot be adequately inspected at\rfinal assembly are accessible for proper interim inspection.\r1. SCOPE\r1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements.\rRepair of:\rCHOPPER ASSEMBLY,ED ;1680-016216686; NSN , ;3890AS000508-01; Part Number, Shall be performed IAW: CHOPPER ASSEMBLY,ED ;Repair/overhaul/inspect in accordance with applicable repair manual, technical specifications, engineering orders and drawings.; Publication\r(s).\r1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r2. APPLICABLE DOCUMENTS - NOT APPLICABLE\r3. REQUIREMENTS\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rCHOPPER ASSEMBLY,ED ;3890AS000508-01; P/N, ;1680-016216686; NSN, ;Repair/overhaul/inspect in accordance with applicable repair manual, technical specifications, engineering orders and drawings.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.\r3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA).\r3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:\r3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the\rInventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the\rcontractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.\r3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section\r6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.\r3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and\ris not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units\rdetermined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior\rto undertaking repair of the item.\rAfter receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations\rand DCMA disposal procedures and requirements.\r3.5 4.0 PARTS AND MATERIALS\r3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material\rused in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein.\rAuthorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and\rrequires specific approval by the PCO.\r3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications\rrequires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which\rrequire source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to\rmanufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own\rrisk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the\rGovernment's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.\r3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the\rrequirements of this contract.\r3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall\rprovide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of\rsuch inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with\rappropriate pass/fail criteria such as certifications\rand actual dimensonal readings.\r3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE.\r3.5.6\r3.6 SOURCE AND LOCATION OF REPAIR SOURCE:\r3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.\rCHOPPER ASSEMBLY,ED ;GENERAL ATOMICS; Company Name , ;3550 GENERAL ATOMICS CT, SAN DIEGO CA 92121-1122 ; Address , ;4V360; Cage Code\rinspection will be accomplished on the contractor's equipment\r3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:\r3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to\rpromptly detect, correct and prevent conditions that adversely affect quality.\r3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.\r3.8 6.0 CONFIGURATION MANAGEMENT (CM):\r3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).\r3.9 7.0 MARKINGS.\r3.9.1 Marking shall be as indicated in the contract when applicable.\r3.10 8.0 STORAGE;\r3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.\r4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.\r5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6. NOTES - NOT APPLICABLE\rTHIS ALRE ITEM HAS BEEN IDENTIFIED AS NON-CRITICAL.\r1. SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be\rrevised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO.\r1.3 . Unless otherwise specified, for fabricated parts, the Inspection\rMethod Sheets/ Final Inspection Sheets shall list the characteristics\rof each item produced under the contract.\rThe manufacturer shall be required to provide certifications of all raw\rmaterial including castings and forgings. the material source shall be\ridentified and the documentation shall be able to identify the customer\rand/or contract number. The manufacturer shall maintain all raw material\rdocumentation for a minimum of ten (10) years.\rThe contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for\rALL Characteristics,in addition, critical characteristics shall be\rannotated.\rThe contractor shall notify NAVICP Code 072 when material required by this contract has been shipped to Destination.This shall be accomplished by sending\ra copy of the DD Form 250, Material Inspection and Receiving Report to:\rNaval Inventory Control Point\rATTN: Code 072\r700 Robbins Avenue, Phila., PA 19111\ror by submitting a facsimile to FAX: (215)697-2524, ATTN: Code 072.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;0401741041 ; drawing number ( ;5B2G7; ) ;QINETIQ ; , Revision ;LATEST REVISION APPLICABLE; and all details and specifications referenced therein.\r1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r1.13 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.13.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements.\rRepair of:\rPOSITION SENSOR CON ;1680-01-644-7167; NSN , ;0401741041; Part Number, Shall be performed IAW: POSITION SENSOR CON ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.; Publication (s).\r1.13.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r2. APPLICABLE DOCUMENTS - NOT APPLICABLE\r3. REQUIREMENTS\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rPOSITION SENSOR CON ;0401741041; P/N, ;1680-01-644-7167; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under t","html":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||\rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X||||||||\rSTOP-WORK ORDER (AUG 1989)|1||\rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO|N/A|TBD|N00383|TBD|TBD|SEE SCHEDULE|SOURCE|||||||||\rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS PHILADELPHIA|\rINTEGRITY OF UNIT PRICES (NOV 2021)|1||\rSAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9||||||||||\rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||\rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||\rLIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1||\rSECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||\rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||\rBUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||\rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||\rROYALTY INFORMATION (APR 1984)|1||\rTYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1||\rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|\rONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||\rThis solicitation is for repair.\rThis is a sole source requirement.\rThe Government physically does not have in its possession sufficient, accurate, or legible data to contract with other than the current source(s).\rThese items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at\rhttps://www.navsup.navy.mil/public/navsup/wss/business_opps/. Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation.\rFor information or questions regarding this notice, please contact Kristin Clemens at the email address: kristin.clemens2.civ@us.navy.mil.\rNAVSUP WSS Requests proposals submitted in response to this solicitation remain valid for a minimum of 120 days following submission.\rAll contractual documents related to the instant procurement are considered to be \"issued\" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email.  The Government's\racceptance of the contractor's proposal constitutes bilateral agreement to \"issue\" contractual documents as detailed herein.\r\\\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 PRE-AWARD / POST AWARD REQUIREMENTS:\rDue to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.\r1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command.  Only those companies who have submitted requests for source approval and been approved\rwill be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the\rSF33 for name and code).  The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:\r(A)  Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the\rsame materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.\r(B)  Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches.  These plans must note those operations and processes performed by subcontractors/ vendors.\r(C)  Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service.  Provide the most recent copies of the documents.\r(D)  A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval.  This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,\rforgings, etc.\r(E)  Copy of inspection method sheets used in the manufacturing and at final inspection.  These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics\rshould be discernible from all other characteristics.\rThe above requirements are a subset of requirements specified in the ASO\rSource Approval Information Brochure dated January 1995.  The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with\rMDA which includes availability of complete data, MRB disposition, etc.  Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval\rBrochure.\r1.4 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.4.1 Any item contracted for repair SHALL have a Statement of Work to ensure  compliance with all repair procedures and requirements.\rRepair of:\rNRP,SCR OUTPUT SWT ;1680-01-621-6681; NSN , ;3890AS00481-01; Part Number, Shall be performed IAW: NRP,SCR OUTPUT SWT ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.; Publication\r(s).\r1.4.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r1.5 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.6 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.7 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.8 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.9 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.10 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.11 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWCAD LAKEHURST; drawing number ( ;3890AS000481-01; ) ;80020;      , Revision ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL\rSPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.;\rand all details and specifications referenced therein.\r1.12  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.13  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r2.  APPLICABLE DOCUMENTS\rDRAWING DATA=3890AS000481                            |80020| N|   |D|            |  |     |\rDRAWING DATA=3890AS000566-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS000567-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS000568-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS000569-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS000570-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS000571-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS000575-01                         |80020| E|   |D|            |  |     |\rDRAWING DATA=3890AS000917-01                         |80020| F|   |D|            |  |     |\rDRAWING DATA=3890AS001172-01                         |80020| H|   |D|            |  |     |\rDRAWING DATA=3890AS001174-01                         |80020| E|   |D|            |  |     |\rDRAWING DATA=3890AS001494-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS002118-01                         |80020| E|   |D|            |  |     |\rDRAWING DATA=3890AS002119-01                         |80020| E|   |D|            |  |     |\rDRAWING DATA=3890AS002122-01                         |80020| E|   |D|            |  |     |\rDRAWING DATA=3890AS002123-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS002130-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS002132-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS002189-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS002212-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS002216-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS002234-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS002235-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS002343-01                         |80020| F|   |D|            |  |     |\rDRAWING DATA=3890AS002364-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS002367-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS002368-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS002533-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS002665-01                         |80020| A|   |D|            |  |     |\rDRAWING DATA=3890AS004096-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS004506-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS004507-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS004508-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS004509-01                         |80020| D|   |D|            |  |     |\rDRAWING DATA=3890AS004510-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS004511-01                         |80020| B|   |D|            |  |     |\rDRAWING DATA=3890AS004512-01                         |80020| C|   |D|            |  |     |\rDRAWING DATA=3890AS004513-01                         |80020| B|   |D|            |  |     |\r3.  REQUIREMENTS\r1. Unique Requirements:\r    a. Listed in Official remarks.\r    b. Listed in Official remarks.\r    c. The contractor/overhaul activity shall provide the repair procedure they will follow to NAWCADLKE engineering for review and approval prior to commencing repairs. The repair procedure shall be forwarded per the Overhaul/Repair Procedure CDRL provided in\rthis document. NAWCADLKE engineering POC is Christian.padilla.7.civ@us.navy.mil.\r2. Interim Inspection Requirements: N/A\r3. ALRE CSI parts require certification.\r   a. When certified, an ALRE part is marked with a Material Identification Code (MIC). NAWCADLKE QA will provide the MIC to DCMA if the component is source accepted, and after receipt of all associated data. Application of MIC shall be in the same methodology\ras the drawing note for part marking, and in same area as part marking (next to, above, or below).\r4. Receipt inspection and Certification of Sub-Components:\r   a. P/Ns 3890AS000566-01, 3890AS000570-01, and 3890AS000575-01 will be certified and marked as directed by NAWCADLKE.\r5. Receipt Inspection and Certification of the Top Assembly:\ra. The receipt Inspection and Certification of the Top Assembly, P/N 3890AS000481-01, shall occur during the final inspection.\r6. Contractor Assist and Part Marking:\r   a. The contractor shall assist on the conduct of the inspections (both final and interim) required that are necessary to certify the critical items specified herein. The contractor shall provide adequate facilities, inspection equipment, and skilled\rpersonnel, to support the NAWCADLKE Inspector in the conduct of the interim inspection(s). The contractor shall provide gauges, tools, fixtures, and jigs necessary to perform the inspections. The contractor shall also provide sufficient rigging/material\rhandling services and manpower to setup/configure/operate equipment & machines used to accomplish the inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities. As part of the MRI process, the NAWCADLKE QA\rrepresentative will provide, in writing, a certification number along with direction for marking the Critical Safety Items (CSI).\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing  procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a  Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for  items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract.  Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rNRP,SCR OUTPUT SWT ;3890AS000481-01; P/N, ;1680-01-621-6681; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST REVISION.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in  these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract.  Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk.  If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change.  The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which  shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER).  An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract.  Items determined BER are not included in the contract price.  The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER.  All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager.  After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.  The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO.  Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI).  A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs).  Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s).  The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA.  The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO.  Items received by the contractor missing consumable parts are not MOI items.  Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.\r3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA).\r3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:\r3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the\rInventory Manager whether a SRA may be replaced by one or more of the following options:  Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s),  otherwise be provided direction for obtaining the SRA(s) at no cost to the\rcontractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.\r3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s).  When authorized, the procedures set forth in paragraph 3.0 of Section\r6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.\r3.4.10 Over and Above Repair (OAR).  An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and\ris not included in the contract pricing due to the nature or scope of the repair needed for that particular item.   Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units\rdetermined by the contractor to require OAR effort.  All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior\rto undertaking repair of the item.\rAfter receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.  Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations\rand DCMA disposal procedures and requirements.\r3.5 4.0 PARTS AND MATERIALS\r3.5.1 General.  The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM).  All parts and material\rused in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein.\rAuthorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO.  In addition, cannibalization must be approved by the PCO.  Cannibalization of units that have not been inducted is not typically authorized and\rrequires specific approval by the PCO.\r3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract.  Any change to such parts/material drawings or specifications\rrequires Government approval in accordance with the Configuration Management provisions of this Statement of Work.  Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which\rrequire source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item.  If the contractor is the DCA, the contractor may approve approve changes to\rmanufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own\rrisk.  If the Government disapproves the requested change, the contractor shall  replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the\rGovernment's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.\r3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the\rrequirements of this contract.\r3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall\rprovide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of\rsuch inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with\rappropriate pass/fail criteria such as certifications\rand actual dimensonal readings.\r3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE.\r3.5.6\r3.6 SOURCE AND LOCATION OF REPAIR SOURCE:\r3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.\rNRP,SCR OUTPUT SWT ;GENERAL ATOMICS; Company Name , ;3550 GENERAL ATOMICS CT,  SAN DIEGO, CA 92121-1122; Address , ;4V360; Cage Code\rinspection will be accomplished on the contractor's equipment\r3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:\r3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to\rpromptly detect, correct and prevent conditions that adversely affect quality.\r3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.\r3.8 6.0 CONFIGURATION MANAGEMENT (CM):\r3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).\r3.9 7.0 MARKINGS.\r3.9.1 Marking shall be as indicated in the contract when applicable.\r3.10 8.0 STORAGE;\r3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.\r4.  QUALITY ASSURANCE\rQUALITY ASSURANCE REQUIREMENTS:\r1. The solicitation/contract shall contain the NAWCADLKE inspection surveillance clause as follows:\r   a. Because of the critical nature of this material, a representative of the Naval Air Warfare Center Aircraft Division Lakehurst (NAWCADLKE) is available to furnish technical assistance on Quality Assurance (QA) matters and shall have the option of\rconducting QA surveillance for the first lot produced under this contract (and all subsequent lots if necessary). This requirement will be performed in conjunction with the government QAS of the cognizant Defense Contract Management Activity and does not\rabrogate the authority or responsibility of the designated government QAS. The contractor agrees to notify Gianpiero.geranio.civ@us.navy.mil, NAWC QA section Code BL41600, Lakehurst, NJ 08733-5035 and the PCO when the material is scheduled to be presented to\rthe DCMA government QAS for Government inspection and acceptance. This notice shall afford the NAWCADLKE QA representative the option of being present during the inspection. A minimum of fourteen (14) working days is required to arrange the surveillance visit.\rNotification shall include the following information: Company Name, Cage Code, Phone number, Fax number, Contract number, Point of Contact, Part Nomenclature, Part Number, NIIN, Type of Inspection, and Quantity of parts.\r    b. N/A\r 2. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications:\r   a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%;\r   b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%;\r   c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4.\r   d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4.\r 3. The material covered in this contract/purchase order will be used in a crucial shipboard system supporting the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious\rpersonnel injury, loss of life, loss of vital shipboard systems, or loss of aircraft. Therefore, the material has been designated as Critical Safety Item (CSI) material and special control procedures are invoked to ensure receipt of correct material.\r4. First Article Testing: N/A\r5. Production Lot Special Tests: N/A\r6. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing.\r7. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed be-low as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be\rbear the symbols of accreditation and the accreditation body:\r   a. American Association for Laboratory Accreditation (A2LA)\r   b. ANSI National Accreditation Board (ANAB)\r   c. International Accreditation Service, Inc. (IAS)\r   d. National Voluntary Laboratory Accreditation Program (NVLAP)\r   e. Perry Johnson Laboratory Accreditation, Inc. (PJLA)\r   f. Canadian Association for Laboratory Accreditation Inc.\r      (CALA)\r   g. Standards Council of Canada (SCC)\r4.1  Review documentation as provided under DD 1423 requirements.\r4.2 .  Mandatory Inspection Requirements:\r100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).\rDuring production, mandatory inspection is required to be accomplished by the contractor as follows:\r  A.  Level of Inspection (LOI).\r      1.  Critical characteristics:  100% inspection shall apply.\r      2.  Major and Minor characteristics:  LOI shall be in accordance with a           sampling plan acceptable to the QAR.\r  B.  Critical characteristics:\r      ;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\r   C.  Major and Minor characteristics\r      1.  Shall be defined by the contractor subject to QAR concurrence,       unless defined on applicable drawings and associated specifications.\r4.3 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying\roffice/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of\rwitnessing the final inspection. The contractor shall notify by email or\rTELEFAX PCO and NAWC Lakehurst QA ;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\rto arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.\r4.4 IN PROCESS INSPECTION REQUIREMENTS:\rDue to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA\r;GIANPIERO GERANIO NAWCADLKE QA REP / TEAMS PHONE (732) 323-1317.\rEMAIL: Gianpiero.geranio.civ@us.navy.mil;\rto arrange for the in-process inspection.\rA minimum of 10 days is needed for advance notice for each occurrence.\rThe authority of the QAR shall not be abrogated. The QAR shall verify that\rtimely notification was given all parties listed below.\rCHARACTERISICS TO BE INSPECTED:\r;SEE QUALITY ASSURANCE REQUIREMENTS FOR FURTHER DETAILS1. Document CSI ii. P/N;\r; ; ; ; ; ; ; ; ; ;\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE\rTHIS IS A ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.\rNAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10102)\r                       REPAIR TDR (25-10050)\rTHE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS \"CRITICAL\" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMMITTED & BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION\rANY COMPANY NOT PREVIOUSLY APPROVED MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION.\rAll records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE CognizantTechnical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years.\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection\rData Requirements:\r   a. Copies of all approved requests for variations.\r   b. Test results as recorded in Appendix A of Test Procedure 33000P00198.\r   c. All required torque values, as well as QA verification of them, as cited in \"51-5AGS-1 Operational, Organizational Level, Intermediate Level, and Depot Level Maintenance Manual with Illustrated Parts Breakdown - SCR Output Switch Assembly\".\r\rDATE OF FIRST SUBMISSION=ASREQ\r16. REMARKS:\r(BLOCK 12) DATE OF FIRST SUBMISSION: Prior to commencing overhaul\rIf the extent of the repair effort for this assembly is beyond the scope of the existing NAWCADLKE/NAVAIR approved overhaul/repair procedure for this assembly then the overhauling contractor or activity shall provide a step-by-step overhaul procedure for\rdisassembly and reassembly. NAWCADLKE engineering POC is Christian Padilla, christian.padilla7.civ@us.navy.mil.\rThe overhaul procedure shall be subject to NAVAIR approval prior to commencing overhaul. The procedure shall include SUGGESTED quality assurance \"hold points\" as required to ensure that any CSI/CAI components or processes that cannot be adequately inspected at\rfinal assembly are accessible for proper interim inspection.\r1.  SCOPE\r1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure  compliance with all repair procedures and requirements.\rRepair of:\rCHOPPER ASSEMBLY,ED ;1680-016216686; NSN , ;3890AS000508-01; Part Number, Shall be performed IAW: CHOPPER ASSEMBLY,ED ;Repair/overhaul/inspect in accordance with applicable repair manual, technical specifications, engineering orders and drawings.; Publication\r(s).\r1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r2.  APPLICABLE DOCUMENTS - NOT APPLICABLE\r3.  REQUIREMENTS\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing  procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a  Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for  items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract.  Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rCHOPPER ASSEMBLY,ED ;3890AS000508-01; P/N, ;1680-016216686; NSN, ;Repair/overhaul/inspect in accordance with applicable repair manual, technical specifications, engineering orders and drawings.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in  these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract.  Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk.  If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change.  The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which  shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER).  An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract.  Items determined BER are not included in the contract price.  The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER.  All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager.  After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.  The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO.  Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI).  A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs).  Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s).  The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA.  The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO.  Items received by the contractor missing consumable parts are not MOI items.  Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.\r3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA).\r3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:\r3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the\rInventory Manager whether a SRA may be replaced by one or more of the following options:  Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s),  otherwise be provided direction for obtaining the SRA(s) at no cost to the\rcontractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.\r3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s).  When authorized, the procedures set forth in paragraph 3.0 of Section\r6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.\r3.4.10 Over and Above Repair (OAR).  An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and\ris not included in the contract pricing due to the nature or scope of the repair needed for that particular item.   Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units\rdetermined by the contractor to require OAR effort.  All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior\rto undertaking repair of the item.\rAfter receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.  Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations\rand DCMA disposal procedures and requirements.\r3.5 4.0 PARTS AND MATERIALS\r3.5.1 General.  The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM).  All parts and material\rused in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein.\rAuthorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO.  In addition, cannibalization must be approved by the PCO.  Cannibalization of units that have not been inducted is not typically authorized and\rrequires specific approval by the PCO.\r3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract.  Any change to such parts/material drawings or specifications\rrequires Government approval in accordance with the Configuration Management provisions of this Statement of Work.  Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which\rrequire source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item.  If the contractor is the DCA, the contractor may approve approve changes to\rmanufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own\rrisk.  If the Government disapproves the requested change, the contractor shall  replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the\rGovernment's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.\r3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the\rrequirements of this contract.\r3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall\rprovide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of\rsuch inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with\rappropriate pass/fail criteria such as certifications\rand actual dimensonal readings.\r3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE.\r3.5.6\r3.6 SOURCE AND LOCATION OF REPAIR SOURCE:\r3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.\rCHOPPER ASSEMBLY,ED ;GENERAL ATOMICS; Company Name , ;3550 GENERAL ATOMICS CT, SAN DIEGO CA 92121-1122        ; Address , ;4V360; Cage Code\rinspection will be accomplished on the contractor's equipment\r3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:\r3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to\rpromptly detect, correct and prevent conditions that adversely affect quality.\r3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.\r3.8 6.0 CONFIGURATION MANAGEMENT (CM):\r3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).\r3.9 7.0 MARKINGS.\r3.9.1 Marking shall be as indicated in the contract when applicable.\r3.10 8.0 STORAGE;\r3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.\r4.  QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.\r5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE\r6.  NOTES - NOT APPLICABLE\rTHIS ALRE ITEM HAS BEEN IDENTIFIED AS NON-CRITICAL.\r1.  SCOPE\r1.1 . Markings shall be in accordance with MIL-STD-130.\r1.2 .  The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility.  These sheets shall not be\rrevised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO.\r1.3 . Unless otherwise specified, for fabricated parts, the Inspection\rMethod Sheets/ Final Inspection Sheets shall list the characteristics\rof each item produced under the contract.\rThe manufacturer shall be required to provide certifications of all raw\rmaterial including castings and forgings. the material source shall be\ridentified and the documentation shall be able to identify the customer\rand/or contract number. The manufacturer shall maintain all raw material\rdocumentation for a minimum of ten (10) years.\rThe contractor  is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for\rALL Characteristics,in addition, critical characteristics shall be\rannotated.\rThe contractor shall notify NAVICP Code 072 when material required by this contract has been shipped to Destination.This shall be accomplished by sending\ra copy of the DD Form 250, Material Inspection and Receiving Report to:\rNaval Inventory Control Point\rATTN: Code 072\r700 Robbins Avenue, Phila., PA 19111\ror by submitting a facsimile to FAX: (215)697-2524, ATTN: Code 072.\r1.4 Sampling rates (AQLs) indicated below shall be used in accordance with\rANSI Z1.4 for Single Sampling and a General Inspection Level of II.\r1.5 In addition to the 100% PCO Mandatory, critical and major characteristics,\rattributes for plating, hardness and non-destructive testing will be inspected\rone hundred percent.\r1.6 Contractor shall develop a system for identification of individual\rpiece parts for traceability purposes. Markings shall not be permanent.\r1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and\rgeometric feature controls with a tolerance range of .010 or less.\r1.8 For minor characteristics, a sampling rate determined by the contractor\rand subject to QAR approval will be used.\r1.9 The material covered in this contract/purchase order will be used in a\rcrucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital\rshipboard systems or loss of aircraft. Therefore,the material has been\rdesignated as Critical material and special control procedures are invoked\rto ensure receipt of correct material.\r1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;0401741041   ; drawing number ( ;5B2G7; ) ;QINETIQ ;      , Revision ;LATEST REVISION APPLICABLE; and all details and specifications referenced therein.\r1.11  Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not\rbe provided by the Government or any other source and is the sole responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced\rspecification.\r1.12  If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.\r1.13 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.\r1.13.1 Any item contracted for repair SHALL have a Statement of Work to ensure  compliance with all repair procedures and requirements.\rRepair of:\rPOSITION SENSOR CON ;1680-01-644-7167; NSN , ;0401741041; Part Number, Shall be performed IAW: POSITION SENSOR CON ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.; Publication (s).\r1.13.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and\rrecommendations via form 1998.\r2.  APPLICABLE DOCUMENTS - NOT APPLICABLE\r3.  REQUIREMENTS\r3.1 1.0 GENERAL\r3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing  procedures required to return units back into a servicable\rcondition.\r3.2 2.0 DEFINITIONS.\r3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term \"contract\" encompasses a contract, an order, or a project work order.\r3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested\rin accordance with the approved repair/overhaul manual listed in this SOW and returned to a  Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).\r3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and\rtested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for  items to be repaired).\r3.3 3.0 SCOPE\r3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract.  Unless expressly provided Government Furnished Property,\rincluding equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and\rshall be the responsibility of the contractor.  The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.\r3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary\rfacility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:\rPOSITION SENSOR CON ;0401741041; P/N, ;1680-01-644-7167; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.; Tech Publications\r3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW.\rRepairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).\r3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in  these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration\rManagement provisions of this Statement of Work or contract.  Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes\rto a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.\r3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk.  If the Government disapproves the requested change, the contractor shall replace any\rdelivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change.  The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a\rrequested change to manuals, drawings, specifications, or to a repair source or facility.\r3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the \"prime contractor\" or the \"actual manufacturer\" appearing on the drawings and / or specifications or technical data furnished by the Government shall be\rread as the \"Government Designated Agency\"\r3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which  shall be made available to the Government for review and approval. The procedures shall include sequential\rdiagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.\r3.4.4 Beyond Economical Repair (BER).  An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be\rused or relied on by the offeror in the pricing of the repairs required by this contract.  Items determined BER are not included in the contract price.  The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be\rBER.  All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager.  After receipt of\rthe required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item.  The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO.  Any\rdisposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.\r3.4.5 Missing on Induction (MOI).  A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs).  Contractor replacement of MOI SRAs is not\rincluded in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s).  The contractor shall provide all such\rdeterminations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA.  The contractor shall not induct and/or repair WRAs with MOI\rSRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO.  Items received by the contractor missing consumable parts are not MOI items.  Rather,\rrepair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under t","origin":"detail"},"contacts":[{"name":"Telephone: 2156973814","role":"primary","email":"KRISTIN.CLEMENS2.CIV@US.NAVY.MIL"}],"place_of_performance":null,"office_address":{"zip":"19111-5098","city":"PHILADELPHIA","state":"PA","country":"USA"},"naics_codes":["336413"],"award":null,"attachments":[{"resource_id":"686eb63c34bf414cbb2e3a32d95bc678","name":"neco.navy.mil","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-03-25T11:29:40.368Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0038326RLA76","mirrored":false},{"resource_id":"ef2d570e08cf4b6c967c8e6fa9dece90","name":"neco.navy.mil","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-02-27T13:03:16.230Z","export_controlled":false,"sha256":null,"url":"https://www.neco.navy.mil/biz_ops/search_edi.aspx","mirrored":false}],"awards":[],"related":[{"key":"N0038327RH066","latest_notice_id":"a3e82c3765984f2086820aa6972926a5","title":"Solicitation notice for N0038326PR0R812 N0038327RH066","solicitation_number":"N0038327RH066","notice_type":"o","first_type":"o","first_posted":"2026-10-30","last_posted":"2026-10-30","notices":1,"due_at":"2026-11-26T19:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00383","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT","naics":"334419","psc":"5999","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5999)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-31T03:50:03.904859Z"},{"key":"N0038327QN131","latest_notice_id":"7e9d00ffa85148dca3cf3670317a73f8","title":"N0038326PR0R900_FMS","solicitation_number":"N0038327QN131","notice_type":"o","first_type":"p","first_posted":"2026-10-07","last_posted":"2026-10-26","notices":2,"due_at":null,"due_date":"2026-11-26","closes_at":"2026-11-27T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00383","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT","naics":"334290","psc":"5895","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5895)","site":null,"site_key":null,"winner":"19111-5098","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"},{"key":"N0038327RNA32","latest_notice_id":"b13705383b1342549c03503980561aec","title":"16--IDG,AIRCRAFT,MATERI, IN REPAIR/MODIFICATION OF","solicitation_number":"N0038327RNA32","notice_type":"o","first_type":"p","first_posted":"2026-11-21","last_posted":"2026-11-23","notices":2,"due_at":"2026-11-27T18:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00383","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT","naics":"336413","psc":"1680","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"N0038327RPA20","latest_notice_id":"665bbc74f6844639923c87f91780f06f","title":"58--RECORDER,VIDEO, IN REPAIR/MODIFICATION OF","solicitation_number":"N0038327RPA20","notice_type":"o","first_type":"p","first_posted":"2026-10-28","last_posted":"2026-11-12","notices":2,"due_at":"2026-11-27T18:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00383","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT","naics":"334118","psc":"5836","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5836)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"N0038326RHA72","latest_notice_id":"9cbc7442b6a047f4b0765831eaa337c8","title":"58--BEACON RCVR ASSY,AI, IN REPAIR/MODIFICATION OF","solicitation_number":"N0038326RHA72","notice_type":"o","first_type":"p","first_posted":"2026-08-13","last_posted":"2026-08-31","notices":2,"due_at":"2026-11-27T18:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00383","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT","naics":"334220","psc":"5826","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5826)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"}],"similar_open":[{"key":"SPRTA127Q0031","latest_notice_id":"8ccf3c647f414b7ea5cbb513ccfb51c9","title":"HOUSING, BEARING UNI","solicitation_number":"SPRTA1-27-Q-0031","notice_type":"o","first_type":"o","first_posted":"2026-10-26","last_posted":"2026-10-26","notices":1,"due_at":"2026-11-27T05:59:00Z","due_date":"2026-11-26","closes_at":"2026-11-27T05:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRTA1","office_name":"DLA AVIATION AT OKLAHOMA CITY, OK","naics":"336413","psc":"3130","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 3130)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-27T03:50:29.852134Z"},{"key":"FD2020270061","latest_notice_id":"bfe9539d4e944a629f4c2dc263b8b777","title":"A-10 Rotor and Stator Brakes","solicitation_number":"FD2020270061","notice_type":"p","first_type":"p","first_posted":"2026-11-09","last_posted":"2026-11-09","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA8203","office_name":"FA8203 AFSC PZAAB","naics":"336413","psc":"1630","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1630)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"},{"key":"N0038327RNA32","latest_notice_id":"b13705383b1342549c03503980561aec","title":"16--IDG,AIRCRAFT,MATERI, IN REPAIR/MODIFICATION OF","solicitation_number":"N0038327RNA32","notice_type":"o","first_type":"p","first_posted":"2026-11-21","last_posted":"2026-11-23","notices":2,"due_at":"2026-11-27T18:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00383","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT","naics":"336413","psc":"1680","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"}],"similar_open_total":542,"indexable":false}