# RUDDER,AIRCRAFT, IN REPAIR/MODIFICATION OF

Canonical: https://sealedbidder.com/opportunities/n0038326rha64

- Solicitation number: N0038326RHA64
- Notice type: Solicitation (first published as presolicitation)
- Status: Closed. Deadline was November 20, 2026 at 1:00 PM EST
- Department: Department of the Navy
- Agency: Department of the Navy
- Contracting office: NAVSUP Weapon Systems Support (N00383)
- NAICS: 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Product or service code: 1560 Airframe Structural Components
- Small business size standard: 1,250 employees (13 CFR 121.201, NAICS 336413)
- Who can bid, by location: Anywhere in the US. Location does not limit who can bid: a product shipped to the buyer, research at the performer's facility, or work at the contractor's site. A state shown is the delivery point.
- First posted: August 6, 2026
- Last posted: August 24, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/a7e79b3e93744a0e800a6e07e17432a7/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336413 (other aircraft parts and auxiliary equipment manufacturing), means no more than 1,250 employees, counted with affiliates.
- Time to respond: Bidders had 88 days from the day the solicitation was posted, August 24, 2026, to the deadline. The deadline moved once: it was first September 21, 2026 and ended as November 20, 2026.
- Before the solicitation: The agency published a presolicitation on August 6, 2026, 18 days before the solicitation.

## Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x||||||||STOP-WORK ORDER (AUG 1989)|1||WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo) Type||DFAS|N00383|DCMA|DCMA|See Schedule|Source|||||||||NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1||VALUE ENGINEERING (JUN 2020)|3||||INTEGRITY OF UNIT PRICES (NOV 2021)|1||EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4|||||SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9||||||||||EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1||SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||ROYALTY INFORMATION (APR 1984)|1||TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1||NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x|ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||This requirement is for the repair of the items herein thissolicitation.Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.  For purposes of this section, Return is defined as physical receipt of the F-conditionasset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.  In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifthregular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under  the subsequent contract.  The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT.  Suchprices are based on the Contractor meeting the RTAT requirements described within the schedule page.  If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS)RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE"CONTRACTUAL DOCUMENTS AS DETAILED HEREIN.Early and incremental deliveries accepted and preferred.\1.  SCOPEITEM MUST BE REPAIR/OVERHAULED IAW STATEMENT OF WORK DATED AND SIGNED04OCT2024 FOR E-2/C-2 RUDDER ASSEMBLY, OUTBOARD, LOWER (LH & RH)THIS IS A HARDCOPY SOW AND CDRLS. HARDCOPY SOW AND CDRL CAN BE OBTAINEDFROM N231 SOURCE DEVELOPMENT.2.  APPLICABLE DOCUMENTS - NOT APPLICABLE3.  REQUIREMENTS - NOT APPLICABLE4.  QUALITY ASSURANCEFirst Article Inspection (FAI) of the first item repaired is required. DCMAand FST shall be present for FAI. The inspection will be performed at thecontractor?s facility. The complete cleaning, inspection, assembly and testingof the part shall be verified to ensure compliance with all repairpublications. See Testing Requirements within HARDCOPY SOW.5.  PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE6.  NOTES - NOT APPLICABLE

## Attachments

- [neco.navy.mil](https://www.neco.navy.mil/biz_ops/search_edi.aspx) (link)
- [See Solicitation N0038326RHA64](https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0038326RHA64) (link)

## Open now in the same industry

568 open in NAICS 336413.

- MOTOR, HYDRAULIC_End_Item_F-16_NSN_1650015681044_PN_FA100009-001 (FD20302400800-02), due November 25, 2026 at 12:59 PM EST. https://sealedbidder.com/opportunities/fd2030240080002
- DRIVE UNIT,HYDRAULI (SPRPA127RWA06), due November 25, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/sprpa127rwa06
- FLUID FILTER ELEMENT / E2A, AH-64E APACHE HELICOPTER (SPE4A727R0021-Synopsis), due November 25, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/spe4a727r0021synopsis

## Publications

- August 6, 2026: Presolicitation, due September 21, 2026 at 12:00 AM EDT. Notice 20370e86f5ca4e799cc8409faa390005. https://sam.gov/workspace/contract/opp/20370e86f5ca4e799cc8409faa390005/view
- August 24, 2026: Solicitation, due November 20, 2026 at 1:00 PM EST. Notice a7e79b3e93744a0e800a6e07e17432a7. https://sam.gov/workspace/contract/opp/a7e79b3e93744a0e800a6e07e17432a7/view

## Points of contact

- Telephone: 2156972974, ALBERT.J.RUSSO17.CIV@US.NAVY.MIL

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/n0038326rha64.
