Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,707 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, first published as presolicitation

TANK,FUEL,AIRCRAFT

N0038324QP179

Department of the Navy, NAVSUP Weapon Systems Support. Other Aircraft Parts and Auxiliary Equipment Manufacturing.

Response deadline

April 22, 2024 at 4:30 PM EDT

Closed 948 days ago. Posted March 22, 2024, first published March 6, 2024. Scheduled to archive May 7, 2024.

Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities

This one closed in 2024

542 like it are open now in other aircraft parts and auxiliary equipment manufacturing

  • HOUSING, BEARING UNI

    Defense Logistics Agency, DLA Aviation at Oklahoma City, Ok

    SolicitationNAICS 336413Ship to the buyerSPRTA1-27-Q-0031
    Due tomorrowNov 27
  • A-10 Rotor and Stator Brakes

    Department of the Air Force, FA8203 AFSC Pzaab

    PresolicitationNAICS 336413Ship to the buyerFD2020270061
    Due tomorrowNov 27
  • IDG,AIRCRAFT,MATERI, IN REPAIR/MODIFICATION OF

    Department of the Navy, NAVSUP Weapon Systems Support

    SolicitationNAICS 336413Ship to the buyerN0038327RNA32
    Due tomorrowNov 27

All 542 open in other aircraft parts and auxiliary equipment manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336413 (other aircraft parts and auxiliary equipment manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
Time to respond
Bidders had 31 days from the day the solicitation was posted, March 22, 2024, to the deadline.
Before the solicitation
The agency published a presolicitation on March 6, 2024, 16 days before the solicitation.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

CONTACT INFORMATION|4|N762.43|AGH|215-697-1396|Andrew.N.Phillips10.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||PPW12XKP| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE||TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (FEB 2024))|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL.

THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred.

1. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;62005 IAW CURRENT REVISION; drawing number ( ;62005 IAW CURRENT REVISION; ) ;62005 IAW CURRENT REVISION; , Revision ;62005 IAW CURRENT REVISION; and all details and specifications referenced therein.

1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.

2. APPLICABLE DOCUMENTS ALL INSPECTIONS AND ACCEPTANCE IAW MIL-STD-801D.

3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE I. First Article Test (FAT) Requirements.The following requirements applyto AMFUEL tank five.The tests to be performed under the FAT approval clauseof the contract are:Conduct all testing required by AMFUEL Report 2122 Rev M:F-18 Acceptance Test Procedure (ATP) non-self-sealing fuelcells with the exceptions.A Vacuum Bag Method Phenolphthalein Test shall be conducted on the fuel cell once all ATP testing has successfully been completed. II. Samples.

The contractor shall present one (1) unit(s) of lot/item 0001 as specified in this contract.At least 45 days before First Article Testing, the contractor shall notify the PCO, in writing, so that the Navy may witness the testing. III. Testing Location and Estimated Lead-Time.

No arrangements will be made for inspection of the sample(s) until the DCMA notifies the PCO that the contractor has inspected the sample and is 100% ready for inspectio by the Government team.The DCMA-QAR shall be present during the inspection team's visit to the manufacturing site to perform the FAT.IV. Test Report.

The contractor shall prepare a FAT Report, which shall be in accordance with the requirements of ISO-9012 (Aerospace First Article Inspection Requirement), MIL-HDBK-831 or equivalent, and shall be submitted via the cognizant DCMA Contract Administration Office to the PCO. Disposition of First Article Test Sample(s).A.

Sample(s) may be considered as production items under the contract provided the sample(s) can be refurbished to Ready for Issue (RFI) condition and provide the sample(s) have inspection approval of the cognizant QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.B.The QAR shall provide comments on Form DD1222 which shall be forwarded with the FAT Report.

The cognizant government inspecting activity shall issue a report accepting or rejecting the FAT sample(s). Final approval of the FAT Report is the responsibility of the PCO. Upon notification of approval/conditional approval the QAR shall provide disposition in the Wide-Area(WAWF) system or Form DD250 to indicate Government acceptance of the test report. The first article test (FAT) shall be performed at the contractor's facility.

All testing shall be performed at the AMFUEL's facility located at 601 firestone Drive, Magnolia AR. The cognizant DCMA shall witness or verify the first article test (FAT), performed at the contractor's facility. At least 45 days before FAT the contractor shall notify the PCO in writing so that the Navymay witness the testing.

The first article inspection shall be witnessed at the contractor's facility by NAVAIR Engineering Technical Authority(ETA), NAVSUP WSS Phila N23 Engineering and N23 Product Support Personnel. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ UPON COMPLETION OF THE FIRST ARTICLE TEST.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 6, 2024

    Presolicitation

    Due April 22, 2024 at 12:00 AM EDT. SAM.gov, notice ec2b7dc0991740aca090366d2005e2bf

  2. March 22, 2024

    Solicitation

    Due April 22, 2024 at 4:30 PM EDT. SAM.gov, notice 55ab45302f2a407491c7b8676abc5430

Points of contact