Solicitation, first published as presolicitation
CYLINDER ASSEMBLY,A
N0038324QC200
Department of the Navy, NAVSUP Weapon Systems Support. Mechanical Power Transmission Equipment Manufacturing.
Response deadline
February 8, 2024 at 3:30 PM EST
Closed 1022 days ago. Posted January 26, 2024, first published January 26, 2024. Scheduled to archive February 23, 2024.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2024
183 like it are open now in mechanical power transmission equipment manufacturing
- AMPLIFIER-POWER SUPPLY
Defense Logistics Agency, DLA Aviation
Sources soughtNAICS 333613Ship to the buyerSPE4A727R0161Due tomorrowNov 27 - CYLINDER ASSEMBLY,ACTU
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 333613Ship to the buyerSPE7LX27U0558Due in 2 daysNov 27 - DISK,CLUTCH,VEHICULAR
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 333613Ship to the buyerSPE7LX27U0650Due in 2 daysNov 27
All 183 open in mechanical power transmission equipment manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333613 (mechanical power transmission equipment manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 13 days from the day the solicitation was posted, January 26, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
CONTACT INFORMATION|4|N792.10|T2Q|215-697-9948|KIMBERLY.FLORES12.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||MIL-I 45208|||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING (COMBO) TYPE||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (JAN 23)|3|||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (DEC 2022))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|333613|750|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||DO-A1A| The purpose of this amendment is to include MIL-I-45208 Inspection and a First Article testing requirement in the solicitation.
This solicitation is for made new manufacture spare parts. NAVSUP WSS Requests proposals submitted in response to this solicitation remainvalid for a minimum of 120 days following submission. All contractual documents related to the instant procurement are considered tobe "issued" by the Government when copies are either deposited in the mail,transmitted by facsimile, or sent by other electronic commerce methods, such asemail.
The Governments acceptance of the contractors proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft.
The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material.
1.3 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;621067-1; , Revision ;D; and all details and specifications referenced therein.
1.4 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.5 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.
2. APPLICABLE DOCUMENTS DRAWING DATA=C320112 |80020| C| |D| | | | DRAWING DATA=MPR1221 |80020| T| |D| | | | DRAWING DATA=424476 |80020| C| |D| | | | DRAWING DATA=424477 |80020| B| |D| | | | DRAWING DATA=424478 |80020| D| |D| | | | DRAWING DATA=424479 |80020| B| |D| | | | DRAWING DATA=424480 |80020| A| |D| | | | DRAWING DATA=424481 |80020| A| |D| | | | DRAWING DATA=424482 |80020| A| |D| | | | DRAWING DATA=424483 |80020| A| |D| | | | DRAWING DATA=424485 |80020| A| |D| | | | DRAWING DATA=424486 |80020| B| |D| | | | DRAWING DATA=424487 |80020| B| |D| | | | DRAWING DATA=424488 |80020| A| |D| | | | DRAWING DATA=424489 |80020| B| |D| | | | DRAWING DATA=424491 |80020| A| |D| | | | DRAWING DATA=424493 |80020| A| |D| | | | DRAWING DATA=424495 |80020| A| |D| | | | DRAWING DATA=519287 |80020| G| |D| | | | DRAWING DATA=519288 |80020| E| |C| | | | DRAWING DATA=519289 |80020| A| |D| | | | DRAWING DATA=519290 |80020| B| |D| | | | DRAWING DATA=621064 |80020| J| |D| | | | DRAWING DATA=621065 |80020| G| |D| | | | DRAWING DATA=621066 |80020| G| |D| | | | DRAWING DATA=621067 |80020| D| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE Unique Requirements: Written verification that the hydrostatic test performed IAW note 3 of drawing 621067 shall be provided.
4.1 CRITICAL MANUFACTURING PROCESSES ( ; ; ) HEAT TREAT ( ;APPLIES; ) WELDING ( ; ; ) CADMIUM PLATING ( ; ; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ;Applies; ) CASTING(S) ( ; ; ) FORGING(S) ( ;APPLIES; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE NON CRITICAL ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.
NAVSUP REFERENCE ONLY: (21-10052):PROCUREMENT TDR \
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 26, 2024
Presolicitation
Due February 8, 2024 at 3:30 PM EST. SAM.gov, notice 13a3ac14049047c791cad3421fabd5da
January 26, 2024
Solicitation
Due February 8, 2024 at 3:30 PM EST. SAM.gov, notice 9299d01105ae4b68a82deaaeffcffc7a
January 26, 2024
Solicitation
Due February 8, 2024 at 3:30 PM EST. SAM.gov, notice e9397ba10eff43c39f47808de1bf7979
Points of contact
- Telephone: 2156976549KIMBERLY.FLORES@NAVY.MIL