Special notice
OA Testing of DODIC MT93 (B-1 Pin Puller Impulse Cart)
N0017425SIMACQJPO0049
Department of the Navy, NSWC Indian Head Division. Engineering Services.
Response deadline
March 26, 2025 at 10:00 AM EDT
Closed 611 days ago. Posted March 12, 2025. Scheduled to archive March 27, 2025.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2025
98 like it are open now in engineering services
- **Amendment 0002** RFI / SOURCES SOUGHT SYNOPSIS - EXPERIMENTAL FACILITIES TECHNICIAN SUPPORT SERVICES
Department of the Army, W6QK ACC-APG Adelphi
Sources soughtNAICS 541330Aberdeen Proving Ground, MDW911QX27RA003Due in 3 daysNov 30 - Weapons Effect Solicitation
Department of the Navy, NSWC Carderock
SolicitationNAICS 541330Bethesda, MDN0016727R3103Due in 4 daysDec 1 - Spectrum Engineering Technical Support Services
Department of the Navy, NAVSUP FLT Log CTR Norfolk
Sources soughtNAICS 541330MarylandN0018927SSN181126Due in 5 daysDec 2
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
****SEE STATEMENT OF WORK ****
NSWC IHD requires test support in order to evaluate the performance and reliability level of the items listed in Table I. This requires performing non-destructive tests and ballistic/functional tests in accordance with the document(s) listed in Section 2.0 and providing data sheets in addition to testing summaries to the Government. The provided results will be compared directly with lot acceptance test (LAT) data to ascertain the effects of age and service exposure on performance and reliability. Quantities listed are approximate and could change, however; the total quantity shall not exceed what is listed in Table I. Additionally, the government reserves the right to test less than the number listed in Table I if required.
-
- Requirements
The contractor shall conduct and document an ordnance assessment test and analysis for the test sample. All tests subsequently listed in this document shall be completed in accordance with the document(s) listed in Section 2.0.
In the event that there have been changes to any of the documents in Section 2.0, the government shall be notified of the change and provided a copy for concurrence. The contractor shall provide the instrumentation, test equipment, gauges or any other equipment needed to support this effort.
REQUIREMENTS
The testing shall be completed within one-hundred and twenty (120) days after receipt of the government furnished material (GFM) test sample, including the delivery of data. The contractor shall provide a report of all non-destructive and destructive
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- MT93 - SOW PACSCI Hollister.docx24 KB, March 12, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 12, 2025
Special notice
Due March 26, 2025 at 10:00 AM EDT. SAM.gov, notice 8f338f2ac48343bc941922a08655e324
1 revision on SAM
- March 12, 2025: publish, special notice
Points of contact
- Tammy Kershnertammy.r.kershner.civ@us.navy.mil3018026161