Solicitation
CONTROL MODULE
N0010426QSC36
Department of the Navy, NAVSUP Weapon Systems Support Mech. Other Communications Equipment Manufacturing.
Response deadline
May 18, 2026 at 4:30 PM EDT
Closed 192 days ago. Posted April 22, 2026. Scheduled to archive June 2, 2026.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2026
53 like it are open now in other communications equipment manufacturing
- N0038326PR0R900_FMS
Department of the Navy, NAVSUP Weapon Systems Support
SolicitationNAICS 334290Ship to the buyerN0038327QN131Awardedto19111-5098
Due tomorrowNov 26 - Light Interference Filter (LIF)
Defense Logistics Agency, DLA Land at Aberdeen
SolicitationNAICS 334290Ship to the buyerSPRBL127RA008Due tomorrowNov 27 - TRANSFER UNIT,CRYPTOGR
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSmall businessNAICS 334290Ship to the buyerSPE4A727Q0217Due in 2 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 334290 (other communications equipment manufacturing), means no more than 800 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 26 days from the day the solicitation was posted, April 22, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be
issued bilaterally, requiring the contractor’s written acceptance prior to
execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 78 DAYS
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset
Visibility (CAV) Statement of Work.
Your quote should include the following information:
***************QUOTE AMOUNT AND RTAT ***************
o Unit Price:__________
o Total Price:__________
o Repair Turnaround Time (RTAT): _______ days
o Number of Days Quote is Valid (ideally 60 days or longer): ________ Days
If your company is not quoting the Government’s Required Repair Turnaround
Time (RTAT) or earlier, provide your company’s capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement
is measured from asset Return to the date of asset acceptance under the terms
of the contract. For purposes of this section, Return is defined as physical
receipt of the F-condition asset at the contractor’s facility as reflected in
the Action Date entry in the Commercial Asset Visibility (CAV) system. In
accordance with the CAV Statement of Work, the contractor is required to
accurately report all transactions by the end of the fifth regular business
day after receipt and the Action Date entered in CAV must be dated to reflect
the actual date of physical receipt. The Contractor must obtain final
inspection and acceptance by the Government for all assets within the RTATs
established in this contract.
*Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
*Return Material Authorization # (RMA), if applicable:__________
*Delivery Vehicle (if Delivery Order requested) (if your company has a current
BOA/IDIQ, for example) :__________________
***************TESTING AND EVALUATION IF BEYOND REPAIR***************
* T&E fee/price (if asset is determined BR/BER): If an item is determined BR,
and the contractor provides documentation that costs were incurred during
evaluation and determination of BR, the contracting officer will negotiate a
reduced contract price, not-to exceed (NTE) $___________associated with the
repair effort to reflect the BR status of the equipment.
* The T&E fee (if asset is determined BR/BER) was determined/computed based
on:______________________________________.
***************AWARDEE INFO & PERFORMANCE LOCATION***************
o Awardee CAGE: __________
*Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________
* Facility/Subcontractor CAGE (where the asset should be shipped), if not same
as "awardee CAGE":__________
*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************
*New unit price:__________
*New unit delivery lead-time:__________
IMPORTANT NOTE: Any asset for which the contractor does not meet the required
RTAT will incur a price reduction per unit/per month the contractor is late -
any delay determined to be excusable (e.g. Government Delay) will not result
in a price reduction. If a price reduction is required due to unexcusable
contractor delay, the Contracting Officer will implement the aforementioned
price reduction via a "reconciliation modification" at the end of the contract
performance. Price reductions made pursuant to this section shall not limit
other remedies available to the Government for failure to meet required RTATs,
including but not limited to the Government’s right to terminate for default.
In reference to the above important note, the contractor provides the
following price reduction amount per unit per month the contractor does not
meet the RTAT: $__________, up to a maximum of: $_________.
*************** OPTION QUANTITY ***************
The Government intends to add an option quantity to the resultant contract.
In reference to the option quantity, the Government may increase the quantity
of supplies called for in the Schedule at the unit price specified. The
Contracting Officer may exercise the option by written notice to the
Contractor within the number of days in FAR 52.217-6 herein. Delivery of the
added items shall continue at the same rate as the like items called for under
the contract, unless the parties otherwise agree.
o Please indicate the pricing for the option quantity:
o Price Each: $_____________
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: XAVIER.A.KELLAM.CIV@US.NAVY.MIL
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 22, 2026
Solicitation
Due May 18, 2026 at 4:30 PM EDT. SAM.gov, notice 001dc202b79041f49c0759b400d1dee2
1 revision on SAM
- April 22, 2026: publish, solicitation
Points of contact
- Xavier KellamXAVIER.A.KELLAM.CIV@US.NAVY.MIL7712290478