# PUMP,CENTRIFUGAL

Canonical: https://sealedbidder.com/opportunities/n0010425qzb32

- Solicitation number: N0010425QZB32
- Notice type: Solicitation (first published as presolicitation)
- Status: Closed. Deadline was March 21, 2025 at 4:30 PM EDT
- Department: Department of the Navy
- Agency: Department of the Navy
- Contracting office: NAVSUP Weapon Systems Support Mech (N00104)
- NAICS: 333914 Measuring, Dispensing, and Other Pumping Equipment Manufacturing
- Product or service code: 4320 Power and Hand Pumps
- Small business size standard: 750 employees (13 CFR 121.201, NAICS 333914)
- Who can bid, by location: Anywhere in the US. Location does not limit who can bid: a product shipped to the buyer, research at the performer's facility, or work at the contractor's site. A state shown is the delivery point.
- First posted: February 5, 2025
- Last posted: March 7, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/efe38b0901a44fe1a1cef2bfd8ef7a4a/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333914 (measuring, dispensing, and other pumping equipment manufacturing), means no more than 750 employees, counted with affiliates.
- Time to respond: Bidders had 43 days from the day the solicitation was posted, February 6, 2025, to the deadline. The deadline moved once: it was first March 10, 2025 and ended as March 21, 2025.
- Before the solicitation: The agency published a presolicitation on February 5, 2025, 1 day before the solicitation.

## Description

CONTACT INFORMATION|4|N742.11|WT6|717-605-7574|ashton.k.perry.civ@us.navy.mil|ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||GENERAL INFORMATION-FOB-DESTINATION|1|B|WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material|Material - Inspect & Accept at Source|TBD|N00104|TBD|Certifications - N45404; Ship-to - TBD|TBD|TBD|N/A|N/A|N/A|Certifications - N45404|N/A|N/A|See form DD1423|1-866-618-5988 - WAWF Helpdesk|NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|EQUAL OPPORTUNITY (SEP 2016)|2|||WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.|||||WARRANTY OF DATA--BASIC (MAR 2014)|2|||ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|13|333914|750||||||||||||NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2|X||1. This is a procurement in support of the TRIPER program.2. As this procurement is for the TRIPER program , in accordance with FederalLaw, DoD and Navy policy, and in conjunction with the Defense Priorities andAllocation System, this contract shall be rated DX.3. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be issued by the Government when copies are either deposited inthe mail, transmitted by facsimile, orsent by other electronic commercemethods, such as email. The Governments acceptance of the contractors proposalconstitutes bilateral agreement to issue contractual documents as detailedherein.4. As this is a TRIPER item, approval of certifications by SUBMEPP (N45404)prior to shipment of material will be required.5. If requirement will be packaged at a location different from the offeror'saddress, the offeror shall provide the name, address, and CAGE of thefacility.6. This award will be issued bilaterally, requiring the contractor's writtenacceptance prior to execution.7. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF).\1.  SCOPE1.1   This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the PUMP,CENTRIFUGAL .2.  APPLICABLE DOCUMENTS2.1  Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence.  Nothing in this contract/purchase order,however, must supersede applicable  laws and regulations unless a specific exemption has been obtained.2.1.1   Documents, drawings, and publications supplied are listed under "Drawing Number".  These items should be retained until an award is made.3.  REQUIREMENTS3.1   Design, Manufacture, and Performance - The item furnished under this contract/purchase order must meet the design, manufacture, and performance requirements specified on CAGE ;7PZX0; , Drawing ;16202828;  and the applicable SUBMEPP Procurement Instruction;3420-012-0001 Rev - Chg. 3 (CSD587); , except as amplified or modified herein.3.2  Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD587;  in ECDS at https://register.nslc.navy.mil/4.  QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.5.  PACKAGING5.1   Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.5.1.1   Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE6.  NOTES - NOT APPLICABLEDATE OF FIRST SUBMISSION=ASREQDATE OF SUBSEQUENT SUBMISSION=ASREQSee CSD (contract support document) called out within paragraph 3 - Requirements.All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.DATE OF FIRST SUBMISSION=ASREQDATE OF SUBSEQUENT SUBMISSION=ASREQSee CSD (contract support document) called out within paragraph 3 - Requirements.All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.DATE OF FIRST SUBMISSION=ASREQDATE OF SUBSEQUENT SUBMISSION=ASREQSee CSD (contract support document) called out within paragraph 3 - Requirements.All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.DATE OF FIRST SUBMISSION=ASREQDATE OF SUBSEQUENT SUBMISSION=ASREQSee CSD (contract support document) called out within paragraph 3 - Requirements.All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.DATE OF FIRST SUBMISSION=ASREQDATE OF SUBSEQUENT SUBMISSION=ASREQSee CSD (contract support document) called out within paragraph 3 - Requirements.All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.DATE OF FIRST SUBMISSION=ASREQDATE OF SUBSEQUENT SUBMISSION=ASREQSee CSD (contract support document) called out within paragraph 3 - Requirements.All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.DATE OF FIRST SUBMISSION=ASREQDATE OF SUBSEQUENT SUBMISSION=ASREQSee CSD (contract support document) called out within paragraph 3 - Requirements.All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

## Attachments

- [BUSINESS OPPORTUNITIES](https://www.neco.navy.mil/biz_ops/search_edi.aspx) (link)
- [See Solicitation N0010425QZB32](https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0010425QZB32) (link)
- [See Solicitation N0010425QZB320001](https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0010425QZB320001) (link)

## Open now in the same industry

53 open in NAICS 333914.

- PUMP UNIT,ROTARY (N0010427QUA09), due November 27, 2026 at 3:30 PM EST. https://sealedbidder.com/opportunities/n0010427qua09
- PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF (N0038327QHA10), due November 27, 2026 at 3:30 PM EST. https://sealedbidder.com/opportunities/n0038327qha10
- PUMP,ROTARY (SPRPA126QVC62), due November 27, 2026 at 3:30 PM EST. https://sealedbidder.com/opportunities/sprpa126qvc62

## Publications

- February 5, 2025: Presolicitation, due March 10, 2025 at 12:00 AM EDT. Notice e3c62356aac24b6793fc19a45d6ab4f0. https://sam.gov/workspace/contract/opp/e3c62356aac24b6793fc19a45d6ab4f0/view
- February 6, 2025: Solicitation, due March 10, 2025 at 4:30 PM EDT. Notice cf93b659102d432688cc1760511b7c5b. https://sam.gov/workspace/contract/opp/cf93b659102d432688cc1760511b7c5b/view
- March 7, 2025: Solicitation, due March 21, 2025 at 4:30 PM EDT. Notice efe38b0901a44fe1a1cef2bfd8ef7a4a. https://sam.gov/workspace/contract/opp/efe38b0901a44fe1a1cef2bfd8ef7a4a/view

## Points of contact

- Telephone: 7176057574, ASHTON.K.PERRY.CIV@US.NAVY.MIL

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/n0010425qzb32.
