{"canonical":"https://sealedbidder.com/opportunities/n0010425qjc74","key":"N0010425QJC74","url":"https://sealedbidder.com/opportunities/n0010425qjc74","title":"PUMP,RECIPROCATING","solicitation_number":"N00104-25-Q-JC74","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-06-19T09:00:00Z","first_posted":"2025-08-20","last_posted":"2025-08-20","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE NAVY","office":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"333914","psc":"4320","set_aside":null,"place_state":"MN","place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"D IN THE SCHEDULE. ** ALL FREIGHT IS FOB ORIGIN","place_county":"27053","place_county_name":"Hennepin County","place_city":"2743000","place_city_name":"Minneapolis","winner":"WANNER ENGINEERING INC","award_amount":null,"publications":[{"notice_id":"aab81ff4155b4bea9641f67682f6e4a6","title":"PUMP,RECIPROCATING","solicitation_number":"N00104-25-Q-JC74","notice_type":"o","base_type":"o","posted":"2025-08-20","posted_at":"2025-08-20T18:18:20.725Z","due_at":"2025-06-19T09:00:00Z","due_date":"2025-06-19","cancelled":false,"archived":true,"archive_date":"2025-07-04","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/aab81ff4155b4bea9641f67682f6e4a6/view","enriched":true,"history":[{"index":3,"title":"PUMP,RECIPROCATING","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-20T18:18:20.725Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"aab81ff4155b4bea9641f67682f6e4a6","solicitation_number":"N00104-25-Q-JC74"}]}],"latest_notice_id":"aab81ff4155b4bea9641f67682f6e4a6","first_type":"o","notices":[{"dates":{"posted":"2025-08-20","posted_at":"2025-08-20T18:18:20.725Z","created_at":"2025-08-20T17:44:22.121Z","modified_at":"2025-08-21T03:55:55.633Z","response_deadline":{"raw":"2025-06-19T05:00:00-04:00","utc":"2025-06-19T09:00:00Z","date":"2025-06-19","time":"05:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/aab81ff4155b4bea9641f67682f6e4a6/view"},"naics":{"codes":["333914"],"primary":"333914"},"title":"PUMP,RECIPROCATING","agency":{"office":{"code":"N00104","name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"17050-0788","city":"MECHANICSBURG","state":"PA","country":"USA"},"organization_id":"500021097","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-04","archive_type":"auto15"},"history":[{"index":3,"title":"PUMP,RECIPROCATING","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-20T18:18:20.725Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"aab81ff4155b4bea9641f67682f6e4a6","solicitation_number":"N00104-25-Q-JC74"}],"contacts":[{"name":"Telephone: 7176055665","role":"primary","email":"KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"aab81ff4155b4bea9641f67682f6e4a6","lineage_id":"aab81ff4155b4bea9641f67682f6e4a6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-03T04:17:44.437019239Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"92c94a1bbaa336d62d88c0ab8c353de20d52a7741c4e5fa0eb5ef93a5b8c7625","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-03T04:17:44.437019239Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>CONTACT INFORMATION|4|N7M1.23|HF4|7712291604|KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL|ITEM UNIQUE</p>\n\n<p>IDENTIFICATION AND VALUATION (JAN 2023)l19||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE</p>\n\n<p>(AUG 1996)12111 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023}|16|COMBO INVOICE AND</p>\n\n<p>RECEIVING|TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF</p>\n\n<p>ABILITYONE SUPPORT CONTRACTOR- RELEASE OF OFFEROR INFORMATION (3-lS}}|||WSS|ALTERNATE A, ANNUAL</p>\n\n<p>REPRESENTATIONS AND CERTIFICATIONS (OCT 2024}11311111111111111 ANNUAL REPRESENTATIONS AND</p>\n\n<p>CERTIFICATIONS (MAR 202S)(DEVIATION 2025-00003 AND2025-O0004}}|13|333914|750|x|x||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND</p>\n\n<p>ENRGY PROGAM</p>\n\n<p>USE (APRIL 2008)}12||x|</p>\n\n<p>** Accelerated delivery is encouraged and accepted before the delivery date(s)<br />\nlisted in the schedule. **<br />\nAll freight is FOB Origin.<br />\nThis RFQ is for repair. The resultant award of this solicitation will be<br />\nissued bilaterally, requiring the contractor&#39;s written acceptance prior to<br />\nexecution. Verify nomenclature, part number, and NSN prior to responding.<br />\nThe Government is seeking a Repair Turnaround Time (RTAT) of: 166 DAYS.<br />\nGovernment Source Inspection (GSI) is required.<br />\nPlease note freight is handled by the Navy as per the Commercial Asset<br />\nVisibility (CAV) Statement of Work.<br />\nYour quote should include the following information:<br />\n***************QUOTE AMOUNT AND RTAT ***************<br />\nUnit Price:__________<br />\nTotal Price:__________<br />\nRepair Turnaround Time (RTAT): _______ days<br />\nIf your company is not quoting the Government&#39;s Required Repair Turnaround<br />\nTime (RTAT) or earlier, provide your company&#39;s capacity constraints?<br />\n_________________________________________________________________<br />\n_________________________________________________________________<br />\n_________________________________________________________________</p>\n\n<p>Repair Turnaround Time (RTAT): the resultant contractual delivery requirement<br />\nis measured from asset Return to the date of asset acceptance under the terms<br />\nof the contract. For purposes of this section, Return is defined as physical<br />\nreceipt of the F-condition asset at the contractor&#39;s facility as reflected in<br />\nthe Action Date entry in the Commercial Asset Visibility (CAV) system. In<br />\naccordance with the CAV Statement of Work, the contractor is required to<br />\naccurately report all transactions by the end of the fifth regular business<br />\nday after receipt and the Action Date entered in CAV must be dated to reflect<br />\nthe actual date of physical receipt. The Contractor must obtain final<br />\ninspection and acceptance by the Government for all assets within the RTATs<br />\nestablished in this contract.<br />\n*Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___<br />\n*Return Material Authorization # (RMA), if applicable:__________<br />\n*Delivery Vehicle (if Delivery Order requested) (if your company has a current<br />\nBOA/IDIQ, for example) :__________________<br />\n***************TESTING AND EVALUATION IF BEYOND REPAIR***************<br />\n* T&amp;E fee/price (if asset is determined BR/BER): If an item is determined BR,<br />\nand the contractor provides documentation that costs were incurred during<br />\nevaluation and determination of BR, the contracting officer will negotiate a<br />\nreduced contract price, not-to exceed (NTE) $___________associated with the<br />\nrepair effort to reflect the BR status of the equipment.<br />\n* The T&amp;E fee (if asset is determined BR/BER) was determined/computed based<br />\non:______________________________________.<br />\n***************AWARDEE INFO &amp; PERFORMANCE LOCATION***************<br />\nAwardee CAGE: __________<br />\n*Inspection &amp; Acceptance CAGE, if not same as &quot;&quot;awardee CAGE&quot;&quot;: __________<br />\n* Facility/Subcontractor CAGE (where the asset should be shipped), if not same<br />\nas &quot;&quot;awardee CAGE&quot;&quot;:__________<br />\n*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************<br />\n*New unit price:__________<br />\n*New unit delivery lead-time:__________<br />\nThe Government intends to add an option quantity to the resultant contract.<br />\nIn reference to the option quantity, the Government may increase the quantity<br />\nof supplies called for in the Schedule at the unit price specified. The<br />\nContracting Officer may exercise the option by written notice to the<br />\nContractor within the number of days in FAR 52.217-6 herein. Delivery of the<br />\nadded items shall continue at the same rate as the like items called for under<br />\nthe contract, unless the parties otherwise agree.<br />\nIMPORTANT NOTE: Any asset for which the contractor does not meet the required<br />\nRTAT will incur a price reduction per unit/per month the contractor is late -<br />\nany delay determined to be excusable (e.g. Government Delay) will not result<br />\nin a price reduction. If a price reduction is required due to unexcusable&nbsp;contractor delay, the Contracting Officer will implement the aforementioned<br />\nprice reduction via a &quot;&quot;reconciliation modification&quot;&quot; at the end of the<br />\ncontract performance. Price reductions made pursuant to this section shall<br />\nnot limit other remedies available to the Government for failure to meet<br />\nrequired RTATs, including but not limited to the Government&#39;s right to<br />\nterminate for default.<br />\nIn reference to the above important note, the contractor provides the<br />\nfollowing price reduction amount per unit per month the contractor does not<br />\nmeet the RTAT: $__________, up to a maximum of: $_________.<br />\nINSPECTION AT ORIGIN<br />\nACCEPTANCE AT ORIGIN<br />\nPOC EMAIL: KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL</p>\n\n<p>|SCOPE 1.1 This contract/purchase order contains the requirements for repair</p>\n\n<p>and the contract quality requirements for the PUMP,RECIPROCATING. 2. APPLICABLE DOCUMENTS 2.1</p>\n\n<p>Applicable Documents - The document(s) listed below form a part of this contract/purchase order</p>\n\n<p>including modifications or exclusions. 2.1.1 &quot;Document References&quot; listed below must be obtained by</p>\n\n<p>the Contractor. Ordering information is included as an attachment to this contract/purchase order.</p>\n\n<p>3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PUMP,RECIPROCATING repaired under this&nbsp;</p>\n\n<p>contract/purchase order shall meet the operational and functional requirements as represented by</p>\n\n<p>the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in</p>\n\n<p>accordance with the contractors repair/overhaul standard practices, manuals and directives</p>\n\n<p>including but not limited to drawings, technical orders, manufacturing operations, tooling</p>\n\n<p>instructions, approved repair standards and any other contractor or government approved documents</p>\n\n<p>developed to provide technical repair procedures. CAGE_Ref. No.</p>\n\n<p>;D35EKSTHFECB; 3.2 Marking - This item shall be physically identified in accordance with</p>\n\n<p>;MIL-STD-130, REV N, 16 NOV 2012;. 3.3 Changes in Design, Material Servicing, or Part Number -</p>\n\n<p>Except for a Code 1 change, which shall be processed as provided in the code statement shown below,</p>\n\n<p>no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and</p>\n\n<p>approval has been given by issuance of a written change order. When any change in design, material,</p>\n\n<p>servicing or part number is made to replace or substitute any item to be furnished on this</p>\n\n<p>contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a</p>\n\n<p>drawing and an explanation of the reason for the change, explaining the reason therefor. If</p>\n\n<p>finished detail drawings are not available, shop drawings in the form used by the manufacturer will</p>\n\n<p>be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the</p>\n\n<p>reasons for making substitutions, the type of change shall be indicated by code number in</p>\n\n<p>accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the</p>\n\n<p>Manufacturer&#39;s Part Number indicated thereon has changed, but the parts are identical in all</p>\n\n<p>respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2:</p>\n\n<p>Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished</p>\n\n<p>separately- Use assembly. Code 4: Part redesigned - Old and new parts are completely</p>\n\n<p>interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code</p>\n\n<p>6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for</p>\n\n<p>Inspection - Unless otherwise specified in the contract/purchase order,&nbsp; the Contractor is</p>\n\n<p>responsible for the performance of all inspection requirements as specified herein. Except as</p>\n\n<p>otherwise specified in the contract/purchase order, the Contractor may use his own or any other</p>\n\n<p>facilities suitable for the performance of the inspection requirements specified herein, unless</p>\n\n<p>disapproved by the Government. The Government reserves the right to perform any of the inspections</p>\n\n<p>set forth in the specification where such inspections are deemed necessary to assure supplies and</p>\n\n<p>services conform to prescribed requirements. 4.2 Responsibility for Compliance -All items must meet</p>\n\n<p>all requirements of this contract/purchase order. The inspection set forth in this specification</p>\n\n<p>shall become a part of the Contractor&#39;s</p>\n\n<p>overall inspection system or quality program. The absence of any inspection requirements shall not</p>\n\n<p>relieve the Contractor of the responsibility of assuring that all products or supplies submitted to</p>\n\n<p>the Government for acceptance comply with all requirements of the contract/purchase order. Sampling</p>\n\n<p>in quality conformance does not authorize submission of known defective material, either indicated</p>\n\n<p>or actual, not does it commit the Government to acceptance of defective material. 4.3 Records -</p>\n\n<p>Records of all inspection work by the Contractor shall be kept complete and available to the</p>\n\n<p>Government during the performance of contract/purchase order and for a period of 365 calendar days</p>\n\n<p>after final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall</p>\n\n<p>perform all inspection and testing requirements as specified in the original manufacturer&#39;s</p>\n\n<p>specifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking-</p>\n\n<p>Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase</p>\n\n<p>Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE</p>\n\n<p>SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense</p>\n\n<p>Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the</p>\n\n<p>Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal</p>\n\n<p>Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most</p>\n\n<p>Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled</p>\n\n<p>Documents - The DODSSP offers cancelled documentsthat are required by private industry in</p>\n\n<p>fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the</p>\n\n<p>Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These</p>\n\n<p>specifications, standards and descriptions are not available from Government sources. Theymay be</p>\n\n<p>obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons</p>\n\n<p>Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by</p>\n\n<p>submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P,</p>\n\n<p>101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for &quot;Official Use</p>\n\n<p>Only&quot; and &quot;NOFORN&quot; (Not Releasable To Foreign Nationals) documents must identify the Government</p>\n\n<p>ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC)</p>\n\n<p>for certification of need for the document. On pre-award actions such requests must be submitted to</p>\n\n<p>the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards</p>\n\n<p>(including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:</p>\n\n<p>Contracting Officer NAVSUP-WSS Code 873215450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-</p>\n\n<p>0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e.</p>\n\n<p>NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS</p>\n\n<p>Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals</p>\n\n<p>Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA</p>\n\n<p>S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch</p>\n\n<p>700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications</p>\n\n<p>must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with</p>\n\n<p>OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors</p>\n\n<p>must include a &quot;Distribution Statement&quot; to inform the contractor of the limits of distribution, and</p>\n\n<p>the safeguarding of the information contained on those documents and drawings. There are 7 (seven)</p>\n\n<p>seperate distribution statement codes used for non-classified documents and drawings. The</p>\n\n<p>definition for each is as follows: A... approved for public release; distribution is unlimited.</p>\n\n<p>B... distribution authorized to US Governments agencies only. C... distribution authorized to US</p>\n\n<p>Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors</p>\n\n<p>only. E... distribution authorized to DoD Components only. F... further distribution only as</p>\n\n<p>directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US</p>\n\n<p>Government agencies and private individuals or enterprises eligible to obtain export controlled</p>\n\n<p>technical data in accordance with OPNAVINST 5510.161. 6.3 Notice To Distributors/Offerors -</p>\n\n<p>Consideration for award of contract shall be given only to authorized distributors of the original</p>\n\n<p>manufacturer&#39;s item represented in this solicitation. If you desire to be considered as a potential</p>\n\n<p>source for award of this contract, proof of being an authorized distributor shall be provided on</p>\n\n<p>company letterhead signed by a responsible company official and sent with your offer to the</p>\n\n<p>Procurement Contracting Officer.</p>","text":"CONTACT INFORMATION|4|N7M1.23|HF4|7712291604|KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL|ITEM UNIQUE\n\nIDENTIFICATION AND VALUATION (JAN 2023)l19||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE\n\n(AUG 1996)12111 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023}|16|COMBO INVOICE AND\n\nRECEIVING|TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF\n\nABILITYONE SUPPORT CONTRACTOR- RELEASE OF OFFEROR INFORMATION (3-lS}}|||WSS|ALTERNATE A, ANNUAL\n\nREPRESENTATIONS AND CERTIFICATIONS (OCT 2024}11311111111111111 ANNUAL REPRESENTATIONS AND\n\nCERTIFICATIONS (MAR 202S)(DEVIATION 2025-00003 AND2025-O0004}}|13|333914|750|x|x||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND\n\nENRGY PROGAM\n\nUSE (APRIL 2008)}12||x|\n\n** Accelerated delivery is encouraged and accepted before the delivery date(s)\n\nlisted in the schedule. **\n\nAll freight is FOB Origin.\n\nThis RFQ is for repair. The resultant award of this solicitation will be\n\nissued bilaterally, requiring the contractor's written acceptance prior to\n\nexecution. Verify nomenclature, part number, and NSN prior to responding.\n\nThe Government is seeking a Repair Turnaround Time (RTAT) of: 166 DAYS.\n\nGovernment Source Inspection (GSI) is required.\n\nPlease note freight is handled by the Navy as per the Commercial Asset\n\nVisibility (CAV) Statement of Work.\n\nYour quote should include the following information:\n\n***************QUOTE AMOUNT AND RTAT ***************\n\nUnit Price:__________\n\nTotal Price:__________\n\nRepair Turnaround Time (RTAT): _______ days\n\nIf your company is not quoting the Government's Required Repair Turnaround\n\nTime (RTAT) or earlier, provide your company's capacity constraints?\n\n_________________________________________________________________\n\n_________________________________________________________________\n\n_________________________________________________________________\n\nRepair Turnaround Time (RTAT): the resultant contractual delivery requirement\n\nis measured from asset Return to the date of asset acceptance under the terms\n\nof the contract. For purposes of this section, Return is defined as physical\n\nreceipt of the F-condition asset at the contractor's facility as reflected in\n\nthe Action Date entry in the Commercial Asset Visibility (CAV) system. In\n\naccordance with the CAV Statement of Work, the contractor is required to\n\naccurately report all transactions by the end of the fifth regular business\n\nday after receipt and the Action Date entered in CAV must be dated to reflect\n\nthe actual date of physical receipt. The Contractor must obtain final\n\ninspection and acceptance by the Government for all assets within the RTATs\n\nestablished in this contract.\n\n*Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___\n\n*Return Material Authorization # (RMA), if applicable:__________\n\n*Delivery Vehicle (if Delivery Order requested) (if your company has a current\n\nBOA/IDIQ, for example) :__________________\n\n***************TESTING AND EVALUATION IF BEYOND REPAIR***************\n\n* T&E fee/price (if asset is determined BR/BER): If an item is determined BR,\n\nand the contractor provides documentation that costs were incurred during\n\nevaluation and determination of BR, the contracting officer will negotiate a\n\nreduced contract price, not-to exceed (NTE) $___________associated with the\n\nrepair effort to reflect the BR status of the equipment.\n\n* The T&E fee (if asset is determined BR/BER) was determined/computed based\n\non:______________________________________.\n\n***************AWARDEE INFO & PERFORMANCE LOCATION***************\n\nAwardee CAGE: __________\n\n*Inspection & Acceptance CAGE, if not same as \"\"awardee CAGE\"\": __________\n\n* Facility/Subcontractor CAGE (where the asset should be shipped), if not same\n\nas \"\"awardee CAGE\"\":__________\n\n*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************\n\n*New unit price:__________\n\n*New unit delivery lead-time:__________\n\nThe Government intends to add an option quantity to the resultant contract.\n\nIn reference to the option quantity, the Government may increase the quantity\n\nof supplies called for in the Schedule at the unit price specified. The\n\nContracting Officer may exercise the option by written notice to the\n\nContractor within the number of days in FAR 52.217-6 herein. Delivery of the\n\nadded items shall continue at the same rate as the like items called for under\n\nthe contract, unless the parties otherwise agree.\n\nIMPORTANT NOTE: Any asset for which the contractor does not meet the required\n\nRTAT will incur a price reduction per unit/per month the contractor is late -\n\nany delay determined to be excusable (e.g. Government Delay) will not result\n\nin a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned\n\nprice reduction via a \"\"reconciliation modification\"\" at the end of the\n\ncontract performance. Price reductions made pursuant to this section shall\n\nnot limit other remedies available to the Government for failure to meet\n\nrequired RTATs, including but not limited to the Government's right to\n\nterminate for default.\n\nIn reference to the above important note, the contractor provides the\n\nfollowing price reduction amount per unit per month the contractor does not\n\nmeet the RTAT: $__________, up to a maximum of: $_________.\n\nINSPECTION AT ORIGIN\n\nACCEPTANCE AT ORIGIN\n\nPOC EMAIL: KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL\n\n|SCOPE 1.1 This contract/purchase order contains the requirements for repair\n\nand the contract quality requirements for the PUMP,RECIPROCATING. 2. APPLICABLE DOCUMENTS 2.1\n\nApplicable Documents - The document(s) listed below form a part of this contract/purchase order\n\nincluding modifications or exclusions. 2.1.1 \"Document References\" listed below must be obtained by\n\nthe Contractor. Ordering information is included as an attachment to this contract/purchase order.\n\n3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PUMP,RECIPROCATING repaired under this\n\ncontract/purchase order shall meet the operational and functional requirements as represented by\n\nthe Cage Code(s) and reference number(s) listed below. All repair work shall be performed in\n\naccordance with the contractors repair/overhaul standard practices, manuals and directives\n\nincluding but not limited to drawings, technical orders, manufacturing operations, tooling\n\ninstructions, approved repair standards and any other contractor or government approved documents\n\ndeveloped to provide technical repair procedures. CAGE_Ref. No.\n\n;D35EKSTHFECB; 3.2 Marking - This item shall be physically identified in accordance with\n\n;MIL-STD-130, REV N, 16 NOV 2012;. 3.3 Changes in Design, Material Servicing, or Part Number -\n\nExcept for a Code 1 change, which shall be processed as provided in the code statement shown below,\n\nno substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and\n\napproval has been given by issuance of a written change order. When any change in design, material,\n\nservicing or part number is made to replace or substitute any item to be furnished on this\n\ncontract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a\n\ndrawing and an explanation of the reason for the change, explaining the reason therefor. If\n\nfinished detail drawings are not available, shop drawings in the form used by the manufacturer will\n\nbe acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the\n\nreasons for making substitutions, the type of change shall be indicated by code number in\n\naccordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the\n\nManufacturer's Part Number indicated thereon has changed, but the parts are identical in all\n\nrespects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2:\n\nAssembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished\n\nseparately- Use assembly. Code 4: Part redesigned - Old and new parts are completely\n\ninterchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code\n\n6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for\n\nInspection - Unless otherwise specified in the contract/purchase order, the Contractor is\n\nresponsible for the performance of all inspection requirements as specified herein. Except as\n\notherwise specified in the contract/purchase order, the Contractor may use his own or any other\n\nfacilities suitable for the performance of the inspection requirements specified herein, unless\n\ndisapproved by the Government. The Government reserves the right to perform any of the inspections\n\nset forth in the specification where such inspections are deemed necessary to assure supplies and\n\nservices conform to prescribed requirements. 4.2 Responsibility for Compliance -All items must meet\n\nall requirements of this contract/purchase order. The inspection set forth in this specification\n\nshall become a part of the Contractor's\n\noverall inspection system or quality program. The absence of any inspection requirements shall not\n\nrelieve the Contractor of the responsibility of assuring that all products or supplies submitted to\n\nthe Government for acceptance comply with all requirements of the contract/purchase order. Sampling\n\nin quality conformance does not authorize submission of known defective material, either indicated\n\nor actual, not does it commit the Government to acceptance of defective material. 4.3 Records -\n\nRecords of all inspection work by the Contractor shall be kept complete and available to the\n\nGovernment during the performance of contract/purchase order and for a period of 365 calendar days\n\nafter final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall\n\nperform all inspection and testing requirements as specified in the original manufacturer's\n\nspecifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking-\n\nPreservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase\n\nOrder Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE\n\nSCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense\n\nSingle Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the\n\nDepartment Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal\n\nSpecifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most\n\nSpecifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled\n\nDocuments - The DODSSP offers cancelled documentsthat are required by private industry in\n\nfulfillment of contractual obligationsin paper format. Documents can be requested by phoning the\n\nSubscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These\n\nspecifications, standards and descriptions are not available from Government sources. Theymay be\n\nobtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons\n\nSpecifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by\n\nsubmitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P,\n\n101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for \"Official Use\n\nOnly\" and \"NOFORN\" (Not Releasable To Foreign Nationals) documents must identify the Government\n\nContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC)\n\nfor certification of need for the document. On pre-award actions such requests must be submitted to\n\nthe PCO for certification of need for the document. E. NOFORN Military Specifications and Standards\n\n(including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:\n\nContracting Officer NAVSUP-WSS Code 873215450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-\n\n0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e.\n\nNAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS\n\nCode 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals\n\nAssigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA\n\nS9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch\n\n700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications\n\nmust be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with\n\nOPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors\n\nmust include a \"Distribution Statement\" to inform the contractor of the limits of distribution, and\n\nthe safeguarding of the information contained on those documents and drawings. There are 7 (seven)\n\nseperate distribution statement codes used for non-classified documents and drawings. The\n\ndefinition for each is as follows: A... approved for public release; distribution is unlimited.\n\nB... distribution authorized to US Governments agencies only. C... distribution authorized to US\n\nGovernment agencies and their contractors. D... distribution authorized to DoD and DoD contractors\n\nonly. E... distribution authorized to DoD Components only. F... further distribution only as\n\ndirected by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US\n\nGovernment agencies and private individuals or enterprises eligible to obtain export controlled\n\ntechnical data in accordance with OPNAVINST 5510.161. 6.3 Notice To Distributors/Offerors -\n\nConsideration for award of contract shall be given only to authorized distributors of the original\n\nmanufacturer's item represented in this solicitation. If you desire to be considered as a potential\n\nsource for award of this contract, proof of being an authorized distributor shall be provided on\n\ncompany letterhead signed by a responsible company official and sent with your offer to the\n\nProcurement Contracting Officer.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"N00104-25-Q-JC74","product_service_code":"4320"}],"due_at":"2025-06-19T09:00:00Z","due_date":"2025-06-19","closes_at":"2025-06-19T09:00:00Z","awardable":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","state":"MN","county":"27053","county_name":"Hennepin County","city":"2743000","city_name":"Minneapolis","country":null,"state_source":null,"state_evidence":"D IN THE SCHEDULE. ** ALL FREIGHT IS FOB ORIGIN","site_key":null,"winner_key":"XLLQN8Q4P7M1","amount":null,"linked_awards":1,"cancelled":false,"archived":true,"updated_at":"2026-11-03T04:44:34.754213Z","principal_notice_id":"aab81ff4155b4bea9641f67682f6e4a6","description":{"text":"CONTACT INFORMATION|4|N7M1.23|HF4|7712291604|KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL|ITEM UNIQUE\n\nIDENTIFICATION AND VALUATION (JAN 2023)l19||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE\n\n(AUG 1996)12111 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023}|16|COMBO INVOICE AND\n\nRECEIVING|TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF\n\nABILITYONE SUPPORT CONTRACTOR- RELEASE OF OFFEROR INFORMATION (3-lS}}|||WSS|ALTERNATE A, ANNUAL\n\nREPRESENTATIONS AND CERTIFICATIONS (OCT 2024}11311111111111111 ANNUAL REPRESENTATIONS AND\n\nCERTIFICATIONS (MAR 202S)(DEVIATION 2025-00003 AND2025-O0004}}|13|333914|750|x|x||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND\n\nENRGY PROGAM\n\nUSE (APRIL 2008)}12||x|\n\n** Accelerated delivery is encouraged and accepted before the delivery date(s)\n\nlisted in the schedule. **\n\nAll freight is FOB Origin.\n\nThis RFQ is for repair. The resultant award of this solicitation will be\n\nissued bilaterally, requiring the contractor's written acceptance prior to\n\nexecution. Verify nomenclature, part number, and NSN prior to responding.\n\nThe Government is seeking a Repair Turnaround Time (RTAT) of: 166 DAYS.\n\nGovernment Source Inspection (GSI) is required.\n\nPlease note freight is handled by the Navy as per the Commercial Asset\n\nVisibility (CAV) Statement of Work.\n\nYour quote should include the following information:\n\n***************QUOTE AMOUNT AND RTAT ***************\n\nUnit Price:__________\n\nTotal Price:__________\n\nRepair Turnaround Time (RTAT): _______ days\n\nIf your company is not quoting the Government's Required Repair Turnaround\n\nTime (RTAT) or earlier, provide your company's capacity constraints?\n\n_________________________________________________________________\n\n_________________________________________________________________\n\n_________________________________________________________________\n\nRepair Turnaround Time (RTAT): the resultant contractual delivery requirement\n\nis measured from asset Return to the date of asset acceptance under the terms\n\nof the contract. For purposes of this section, Return is defined as physical\n\nreceipt of the F-condition asset at the contractor's facility as reflected in\n\nthe Action Date entry in the Commercial Asset Visibility (CAV) system. In\n\naccordance with the CAV Statement of Work, the contractor is required to\n\naccurately report all transactions by the end of the fifth regular business\n\nday after receipt and the Action Date entered in CAV must be dated to reflect\n\nthe actual date of physical receipt. The Contractor must obtain final\n\ninspection and acceptance by the Government for all assets within the RTATs\n\nestablished in this contract.\n\n*Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___\n\n*Return Material Authorization # (RMA), if applicable:__________\n\n*Delivery Vehicle (if Delivery Order requested) (if your company has a current\n\nBOA/IDIQ, for example) :__________________\n\n***************TESTING AND EVALUATION IF BEYOND REPAIR***************\n\n* T&E fee/price (if asset is determined BR/BER): If an item is determined BR,\n\nand the contractor provides documentation that costs were incurred during\n\nevaluation and determination of BR, the contracting officer will negotiate a\n\nreduced contract price, not-to exceed (NTE) $___________associated with the\n\nrepair effort to reflect the BR status of the equipment.\n\n* The T&E fee (if asset is determined BR/BER) was determined/computed based\n\non:______________________________________.\n\n***************AWARDEE INFO & PERFORMANCE LOCATION***************\n\nAwardee CAGE: __________\n\n*Inspection & Acceptance CAGE, if not same as \"\"awardee CAGE\"\": __________\n\n* Facility/Subcontractor CAGE (where the asset should be shipped), if not same\n\nas \"\"awardee CAGE\"\":__________\n\n*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************\n\n*New unit price:__________\n\n*New unit delivery lead-time:__________\n\nThe Government intends to add an option quantity to the resultant contract.\n\nIn reference to the option quantity, the Government may increase the quantity\n\nof supplies called for in the Schedule at the unit price specified. The\n\nContracting Officer may exercise the option by written notice to the\n\nContractor within the number of days in FAR 52.217-6 herein. Delivery of the\n\nadded items shall continue at the same rate as the like items called for under\n\nthe contract, unless the parties otherwise agree.\n\nIMPORTANT NOTE: Any asset for which the contractor does not meet the required\n\nRTAT will incur a price reduction per unit/per month the contractor is late -\n\nany delay determined to be excusable (e.g. Government Delay) will not result\n\nin a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned\n\nprice reduction via a \"\"reconciliation modification\"\" at the end of the\n\ncontract performance. Price reductions made pursuant to this section shall\n\nnot limit other remedies available to the Government for failure to meet\n\nrequired RTATs, including but not limited to the Government's right to\n\nterminate for default.\n\nIn reference to the above important note, the contractor provides the\n\nfollowing price reduction amount per unit per month the contractor does not\n\nmeet the RTAT: $__________, up to a maximum of: $_________.\n\nINSPECTION AT ORIGIN\n\nACCEPTANCE AT ORIGIN\n\nPOC EMAIL: KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL\n\n|SCOPE 1.1 This contract/purchase order contains the requirements for repair\n\nand the contract quality requirements for the PUMP,RECIPROCATING. 2. APPLICABLE DOCUMENTS 2.1\n\nApplicable Documents - The document(s) listed below form a part of this contract/purchase order\n\nincluding modifications or exclusions. 2.1.1 \"Document References\" listed below must be obtained by\n\nthe Contractor. Ordering information is included as an attachment to this contract/purchase order.\n\n3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PUMP,RECIPROCATING repaired under this\n\ncontract/purchase order shall meet the operational and functional requirements as represented by\n\nthe Cage Code(s) and reference number(s) listed below. All repair work shall be performed in\n\naccordance with the contractors repair/overhaul standard practices, manuals and directives\n\nincluding but not limited to drawings, technical orders, manufacturing operations, tooling\n\ninstructions, approved repair standards and any other contractor or government approved documents\n\ndeveloped to provide technical repair procedures. CAGE_Ref. No.\n\n;D35EKSTHFECB; 3.2 Marking - This item shall be physically identified in accordance with\n\n;MIL-STD-130, REV N, 16 NOV 2012;. 3.3 Changes in Design, Material Servicing, or Part Number -\n\nExcept for a Code 1 change, which shall be processed as provided in the code statement shown below,\n\nno substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and\n\napproval has been given by issuance of a written change order. When any change in design, material,\n\nservicing or part number is made to replace or substitute any item to be furnished on this\n\ncontract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a\n\ndrawing and an explanation of the reason for the change, explaining the reason therefor. If\n\nfinished detail drawings are not available, shop drawings in the form used by the manufacturer will\n\nbe acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the\n\nreasons for making substitutions, the type of change shall be indicated by code number in\n\naccordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the\n\nManufacturer's Part Number indicated thereon has changed, but the parts are identical in all\n\nrespects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2:\n\nAssembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished\n\nseparately- Use assembly. Code 4: Part redesigned - Old and new parts are completely\n\ninterchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code\n\n6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for\n\nInspection - Unless otherwise specified in the contract/purchase order, the Contractor is\n\nresponsible for the performance of all inspection requirements as specified herein. Except as\n\notherwise specified in the contract/purchase order, the Contractor may use his own or any other\n\nfacilities suitable for the performance of the inspection requirements specified herein, unless\n\ndisapproved by the Government. The Government reserves the right to perform any of the inspections\n\nset forth in the specification where such inspections are deemed necessary to assure supplies and\n\nservices conform to prescribed requirements. 4.2 Responsibility for Compliance -All items must meet\n\nall requirements of this contract/purchase order. The inspection set forth in this specification\n\nshall become a part of the Contractor's\n\noverall inspection system or quality program. The absence of any inspection requirements shall not\n\nrelieve the Contractor of the responsibility of assuring that all products or supplies submitted to\n\nthe Government for acceptance comply with all requirements of the contract/purchase order. Sampling\n\nin quality conformance does not authorize submission of known defective material, either indicated\n\nor actual, not does it commit the Government to acceptance of defective material. 4.3 Records -\n\nRecords of all inspection work by the Contractor shall be kept complete and available to the\n\nGovernment during the performance of contract/purchase order and for a period of 365 calendar days\n\nafter final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall\n\nperform all inspection and testing requirements as specified in the original manufacturer's\n\nspecifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking-\n\nPreservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase\n\nOrder Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE\n\nSCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense\n\nSingle Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the\n\nDepartment Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal\n\nSpecifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most\n\nSpecifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled\n\nDocuments - The DODSSP offers cancelled documentsthat are required by private industry in\n\nfulfillment of contractual obligationsin paper format. Documents can be requested by phoning the\n\nSubscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These\n\nspecifications, standards and descriptions are not available from Government sources. Theymay be\n\nobtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons\n\nSpecifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by\n\nsubmitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P,\n\n101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for \"Official Use\n\nOnly\" and \"NOFORN\" (Not Releasable To Foreign Nationals) documents must identify the Government\n\nContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC)\n\nfor certification of need for the document. On pre-award actions such requests must be submitted to\n\nthe PCO for certification of need for the document. E. NOFORN Military Specifications and Standards\n\n(including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:\n\nContracting Officer NAVSUP-WSS Code 873215450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-\n\n0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e.\n\nNAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS\n\nCode 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals\n\nAssigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA\n\nS9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch\n\n700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications\n\nmust be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with\n\nOPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors\n\nmust include a \"Distribution Statement\" to inform the contractor of the limits of distribution, and\n\nthe safeguarding of the information contained on those documents and drawings. There are 7 (seven)\n\nseperate distribution statement codes used for non-classified documents and drawings. The\n\ndefinition for each is as follows: A... approved for public release; distribution is unlimited.\n\nB... distribution authorized to US Governments agencies only. C... distribution authorized to US\n\nGovernment agencies and their contractors. D... distribution authorized to DoD and DoD contractors\n\nonly. E... distribution authorized to DoD Components only. F... further distribution only as\n\ndirected by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US\n\nGovernment agencies and private individuals or enterprises eligible to obtain export controlled\n\ntechnical data in accordance with OPNAVINST 5510.161. 6.3 Notice To Distributors/Offerors -\n\nConsideration for award of contract shall be given only to authorized distributors of the original\n\nmanufacturer's item represented in this solicitation. If you desire to be considered as a potential\n\nsource for award of this contract, proof of being an authorized distributor shall be provided on\n\ncompany letterhead signed by a responsible company official and sent with your offer to the\n\nProcurement Contracting Officer.","html":"<p>CONTACT INFORMATION|4|N7M1.23|HF4|7712291604|KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL|ITEM UNIQUE</p>\n\n<p>IDENTIFICATION AND VALUATION (JAN 2023)l19||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE</p>\n\n<p>(AUG 1996)12111 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023}|16|COMBO INVOICE AND</p>\n\n<p>RECEIVING|TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF</p>\n\n<p>ABILITYONE SUPPORT CONTRACTOR- RELEASE OF OFFEROR INFORMATION (3-lS}}|||WSS|ALTERNATE A, ANNUAL</p>\n\n<p>REPRESENTATIONS AND CERTIFICATIONS (OCT 2024}11311111111111111 ANNUAL REPRESENTATIONS AND</p>\n\n<p>CERTIFICATIONS (MAR 202S)(DEVIATION 2025-00003 AND2025-O0004}}|13|333914|750|x|x||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND</p>\n\n<p>ENRGY PROGAM</p>\n\n<p>USE (APRIL 2008)}12||x|</p>\n\n<p>** Accelerated delivery is encouraged and accepted before the delivery date(s)<br />\nlisted in the schedule. **<br />\nAll freight is FOB Origin.<br />\nThis RFQ is for repair. The resultant award of this solicitation will be<br />\nissued bilaterally, requiring the contractor&#39;s written acceptance prior to<br />\nexecution. Verify nomenclature, part number, and NSN prior to responding.<br />\nThe Government is seeking a Repair Turnaround Time (RTAT) of: 166 DAYS.<br />\nGovernment Source Inspection (GSI) is required.<br />\nPlease note freight is handled by the Navy as per the Commercial Asset<br />\nVisibility (CAV) Statement of Work.<br />\nYour quote should include the following information:<br />\n***************QUOTE AMOUNT AND RTAT ***************<br />\nUnit Price:__________<br />\nTotal Price:__________<br />\nRepair Turnaround Time (RTAT): _______ days<br />\nIf your company is not quoting the Government&#39;s Required Repair Turnaround<br />\nTime (RTAT) or earlier, provide your company&#39;s capacity constraints?<br />\n_________________________________________________________________<br />\n_________________________________________________________________<br />\n_________________________________________________________________</p>\n\n<p>Repair Turnaround Time (RTAT): the resultant contractual delivery requirement<br />\nis measured from asset Return to the date of asset acceptance under the terms<br />\nof the contract. For purposes of this section, Return is defined as physical<br />\nreceipt of the F-condition asset at the contractor&#39;s facility as reflected in<br />\nthe Action Date entry in the Commercial Asset Visibility (CAV) system. In<br />\naccordance with the CAV Statement of Work, the contractor is required to<br />\naccurately report all transactions by the end of the fifth regular business<br />\nday after receipt and the Action Date entered in CAV must be dated to reflect<br />\nthe actual date of physical receipt. The Contractor must obtain final<br />\ninspection and acceptance by the Government for all assets within the RTATs<br />\nestablished in this contract.<br />\n*Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___<br />\n*Return Material Authorization # (RMA), if applicable:__________<br />\n*Delivery Vehicle (if Delivery Order requested) (if your company has a current<br />\nBOA/IDIQ, for example) :__________________<br />\n***************TESTING AND EVALUATION IF BEYOND REPAIR***************<br />\n* T&amp;E fee/price (if asset is determined BR/BER): If an item is determined BR,<br />\nand the contractor provides documentation that costs were incurred during<br />\nevaluation and determination of BR, the contracting officer will negotiate a<br />\nreduced contract price, not-to exceed (NTE) $___________associated with the<br />\nrepair effort to reflect the BR status of the equipment.<br />\n* The T&amp;E fee (if asset is determined BR/BER) was determined/computed based<br />\non:______________________________________.<br />\n***************AWARDEE INFO &amp; PERFORMANCE LOCATION***************<br />\nAwardee CAGE: __________<br />\n*Inspection &amp; Acceptance CAGE, if not same as &quot;&quot;awardee CAGE&quot;&quot;: __________<br />\n* Facility/Subcontractor CAGE (where the asset should be shipped), if not same<br />\nas &quot;&quot;awardee CAGE&quot;&quot;:__________<br />\n*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************<br />\n*New unit price:__________<br />\n*New unit delivery lead-time:__________<br />\nThe Government intends to add an option quantity to the resultant contract.<br />\nIn reference to the option quantity, the Government may increase the quantity<br />\nof supplies called for in the Schedule at the unit price specified. The<br />\nContracting Officer may exercise the option by written notice to the<br />\nContractor within the number of days in FAR 52.217-6 herein. Delivery of the<br />\nadded items shall continue at the same rate as the like items called for under<br />\nthe contract, unless the parties otherwise agree.<br />\nIMPORTANT NOTE: Any asset for which the contractor does not meet the required<br />\nRTAT will incur a price reduction per unit/per month the contractor is late -<br />\nany delay determined to be excusable (e.g. Government Delay) will not result<br />\nin a price reduction. If a price reduction is required due to unexcusable&nbsp;contractor delay, the Contracting Officer will implement the aforementioned<br />\nprice reduction via a &quot;&quot;reconciliation modification&quot;&quot; at the end of the<br />\ncontract performance. Price reductions made pursuant to this section shall<br />\nnot limit other remedies available to the Government for failure to meet<br />\nrequired RTATs, including but not limited to the Government&#39;s right to<br />\nterminate for default.<br />\nIn reference to the above important note, the contractor provides the<br />\nfollowing price reduction amount per unit per month the contractor does not<br />\nmeet the RTAT: $__________, up to a maximum of: $_________.<br />\nINSPECTION AT ORIGIN<br />\nACCEPTANCE AT ORIGIN<br />\nPOC EMAIL: KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL</p>\n\n<p>|SCOPE 1.1 This contract/purchase order contains the requirements for repair</p>\n\n<p>and the contract quality requirements for the PUMP,RECIPROCATING. 2. APPLICABLE DOCUMENTS 2.1</p>\n\n<p>Applicable Documents - The document(s) listed below form a part of this contract/purchase order</p>\n\n<p>including modifications or exclusions. 2.1.1 &quot;Document References&quot; listed below must be obtained by</p>\n\n<p>the Contractor. Ordering information is included as an attachment to this contract/purchase order.</p>\n\n<p>3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PUMP,RECIPROCATING repaired under this&nbsp;</p>\n\n<p>contract/purchase order shall meet the operational and functional requirements as represented by</p>\n\n<p>the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in</p>\n\n<p>accordance with the contractors repair/overhaul standard practices, manuals and directives</p>\n\n<p>including but not limited to drawings, technical orders, manufacturing operations, tooling</p>\n\n<p>instructions, approved repair standards and any other contractor or government approved documents</p>\n\n<p>developed to provide technical repair procedures. CAGE_Ref. No.</p>\n\n<p>;D35EKSTHFECB; 3.2 Marking - This item shall be physically identified in accordance with</p>\n\n<p>;MIL-STD-130, REV N, 16 NOV 2012;. 3.3 Changes in Design, Material Servicing, or Part Number -</p>\n\n<p>Except for a Code 1 change, which shall be processed as provided in the code statement shown below,</p>\n\n<p>no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and</p>\n\n<p>approval has been given by issuance of a written change order. When any change in design, material,</p>\n\n<p>servicing or part number is made to replace or substitute any item to be furnished on this</p>\n\n<p>contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a</p>\n\n<p>drawing and an explanation of the reason for the change, explaining the reason therefor. If</p>\n\n<p>finished detail drawings are not available, shop drawings in the form used by the manufacturer will</p>\n\n<p>be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the</p>\n\n<p>reasons for making substitutions, the type of change shall be indicated by code number in</p>\n\n<p>accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the</p>\n\n<p>Manufacturer&#39;s Part Number indicated thereon has changed, but the parts are identical in all</p>\n\n<p>respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2:</p>\n\n<p>Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished</p>\n\n<p>separately- Use assembly. Code 4: Part redesigned - Old and new parts are completely</p>\n\n<p>interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code</p>\n\n<p>6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for</p>\n\n<p>Inspection - Unless otherwise specified in the contract/purchase order,&nbsp; the Contractor is</p>\n\n<p>responsible for the performance of all inspection requirements as specified herein. Except as</p>\n\n<p>otherwise specified in the contract/purchase order, the Contractor may use his own or any other</p>\n\n<p>facilities suitable for the performance of the inspection requirements specified herein, unless</p>\n\n<p>disapproved by the Government. The Government reserves the right to perform any of the inspections</p>\n\n<p>set forth in the specification where such inspections are deemed necessary to assure supplies and</p>\n\n<p>services conform to prescribed requirements. 4.2 Responsibility for Compliance -All items must meet</p>\n\n<p>all requirements of this contract/purchase order. The inspection set forth in this specification</p>\n\n<p>shall become a part of the Contractor&#39;s</p>\n\n<p>overall inspection system or quality program. The absence of any inspection requirements shall not</p>\n\n<p>relieve the Contractor of the responsibility of assuring that all products or supplies submitted to</p>\n\n<p>the Government for acceptance comply with all requirements of the contract/purchase order. Sampling</p>\n\n<p>in quality conformance does not authorize submission of known defective material, either indicated</p>\n\n<p>or actual, not does it commit the Government to acceptance of defective material. 4.3 Records -</p>\n\n<p>Records of all inspection work by the Contractor shall be kept complete and available to the</p>\n\n<p>Government during the performance of contract/purchase order and for a period of 365 calendar days</p>\n\n<p>after final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall</p>\n\n<p>perform all inspection and testing requirements as specified in the original manufacturer&#39;s</p>\n\n<p>specifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking-</p>\n\n<p>Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase</p>\n\n<p>Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE</p>\n\n<p>SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense</p>\n\n<p>Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the</p>\n\n<p>Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal</p>\n\n<p>Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most</p>\n\n<p>Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled</p>\n\n<p>Documents - The DODSSP offers cancelled documentsthat are required by private industry in</p>\n\n<p>fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the</p>\n\n<p>Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These</p>\n\n<p>specifications, standards and descriptions are not available from Government sources. Theymay be</p>\n\n<p>obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons</p>\n\n<p>Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by</p>\n\n<p>submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P,</p>\n\n<p>101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for &quot;Official Use</p>\n\n<p>Only&quot; and &quot;NOFORN&quot; (Not Releasable To Foreign Nationals) documents must identify the Government</p>\n\n<p>ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC)</p>\n\n<p>for certification of need for the document. On pre-award actions such requests must be submitted to</p>\n\n<p>the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards</p>\n\n<p>(including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:</p>\n\n<p>Contracting Officer NAVSUP-WSS Code 873215450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-</p>\n\n<p>0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e.</p>\n\n<p>NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS</p>\n\n<p>Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals</p>\n\n<p>Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA</p>\n\n<p>S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch</p>\n\n<p>700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications</p>\n\n<p>must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with</p>\n\n<p>OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors</p>\n\n<p>must include a &quot;Distribution Statement&quot; to inform the contractor of the limits of distribution, and</p>\n\n<p>the safeguarding of the information contained on those documents and drawings. There are 7 (seven)</p>\n\n<p>seperate distribution statement codes used for non-classified documents and drawings. The</p>\n\n<p>definition for each is as follows: A... approved for public release; distribution is unlimited.</p>\n\n<p>B... distribution authorized to US Governments agencies only. C... distribution authorized to US</p>\n\n<p>Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors</p>\n\n<p>only. E... distribution authorized to DoD Components only. F... further distribution only as</p>\n\n<p>directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US</p>\n\n<p>Government agencies and private individuals or enterprises eligible to obtain export controlled</p>\n\n<p>technical data in accordance with OPNAVINST 5510.161. 6.3 Notice To Distributors/Offerors -</p>\n\n<p>Consideration for award of contract shall be given only to authorized distributors of the original</p>\n\n<p>manufacturer&#39;s item represented in this solicitation. If you desire to be considered as a potential</p>\n\n<p>source for award of this contract, proof of being an authorized distributor shall be provided on</p>\n\n<p>company letterhead signed by a responsible company official and sent with your offer to the</p>\n\n<p>Procurement Contracting Officer.</p>","origin":"detail"},"contacts":[{"name":"Telephone: 7176055665","role":"primary","email":"KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL"}],"place_of_performance":null,"office_address":{"zip":"17050-0788","city":"MECHANICSBURG","state":"PA","country":"USA"},"naics_codes":["333914"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_N0010425PJD18_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_N0010425PJD18_9700_-NONE-_-NONE-/","piid":"N0010425PJD18","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"XLLQN8Q4P7M1","recipient_name":"WANNER ENGINEERING INC","recipient_uei":"XLLQN8Q4P7M1","recipient_cage":"59776","recipient_city":"MINNEAPOLIS","recipient_state":"MN","sub_name":"Department of the Navy","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","office_key":"o-N00104","first_action_date":"2025-09-08","last_action_date":"2025-12-17","actions":3,"obligated":"500.00","current_total_value":"500.00","potential_total_value":"500.00","naics":"335931","psc":"4320","extent_competed":"NOT COMPETED","set_aside":"NO SET ASIDE USED.","offers_received":1,"description":"PUMP,RECIPROCATING","method":"solicitation","confidence":"high","evidence":["solicitation number N0010425QJC74 equals the FPDS solicitation identifier","same awarding office N00104"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"N0010426QNE94","latest_notice_id":"76c3a2bd86c5455aaee0cf0a9cbc288f","title":"CAP,VALVE","solicitation_number":"N0010426QNE94","notice_type":"o","first_type":"o","first_posted":"2026-10-20","last_posted":"2026-10-28","notices":2,"due_at":"2026-11-26T22:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"332919","psc":"4820","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4820)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"N0010426QND25","latest_notice_id":"7d834c6020ad47589707aade4dd335d9","title":"PARTS KIT,BALL VALV","solicitation_number":"N0010426QND25","notice_type":"o","first_type":"o","first_posted":"2026-10-20","last_posted":"2026-10-28","notices":2,"due_at":"2026-11-26T22:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"332919","psc":"4820","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4820)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"N0010426QQC17","latest_notice_id":"b83c813249d14e22917fa795efcf017e","title":"CIRCUIT CARD ASSEMB","solicitation_number":"N0010426QQC17","notice_type":"o","first_type":"o","first_posted":"2026-07-21","last_posted":"2026-09-30","notices":3,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"334412","psc":"5998","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"D IN THE SCHEDULE. ^^ ALL FREIGHT IS FOB ORIGIN","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-01T04:02:27.010479Z"},{"key":"N0010427QUA09","latest_notice_id":"fd466300c3a247079329dc4e0fc8c28c","title":"PUMP UNIT,ROTARY","solicitation_number":"N0010427QUA09","notice_type":"o","first_type":"o","first_posted":"2026-10-06","last_posted":"2026-11-13","notices":2,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"333914","psc":"4320","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"AGING, GOVERNMENT SOURCE INSPECTION, FOB SOURCE","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"N0010427QUA33","latest_notice_id":"85f5544f421c486c824a1017c95ac801","title":"CAMERA SYSTEM,SURVE","solicitation_number":"N0010427QUA33","notice_type":"o","first_type":"o","first_posted":"2026-10-27","last_posted":"2026-10-27","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"334118","psc":"5836","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"AGING, GOVERNMENT SOURCE INSPECTION, FOB SOURCE","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-28T04:01:09.175983Z"}],"similar_open":[{"key":"N0010427QUA09","latest_notice_id":"fd466300c3a247079329dc4e0fc8c28c","title":"PUMP UNIT,ROTARY","solicitation_number":"N0010427QUA09","notice_type":"o","first_type":"o","first_posted":"2026-10-06","last_posted":"2026-11-13","notices":2,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00104","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT MECH","naics":"333914","psc":"4320","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"AGING, GOVERNMENT SOURCE INSPECTION, FOB SOURCE","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"N0038327QHA10","latest_notice_id":"880448abee81427d8a3fec2b6506e5b8","title":"43--PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF","solicitation_number":"N0038327QHA10","notice_type":"o","first_type":"p","first_posted":"2026-10-09","last_posted":"2026-10-27","notices":2,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00383","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT","naics":"333914","psc":"4320","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4320)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-28T04:01:09.175983Z"},{"key":"SPRPA126QVC62","latest_notice_id":"dafda8069f4a4f2b88e7780e77a63733","title":"PUMP,ROTARY","solicitation_number":"SPRPA126QVC62","notice_type":"o","first_type":"o","first_posted":"2026-10-27","last_posted":"2026-10-27","notices":1,"due_at":"2026-11-27T20:30:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRPA1","office_name":"DLA AVIATION AT PHILADELPHIA, PA","naics":"333914","psc":"4320","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4320)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-28T04:01:09.175983Z"}],"similar_open_total":53,"indexable":false}