Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,708 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, total small business set-aside, first published as presolicitation

ACCUMULATOR, IN REPAIR/MODIFICATION OF

N0010424QZC16

Department of the Navy, NAVSUP Weapon Systems Support Mech. All Other Miscellaneous General Purpose Machinery Manufacturing.

Awarded

Precision Equipment, Inc.

$112,205.00 obligated so far on USAspending

Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities

This one was awarded in 2024

115 like it are open now in all other miscellaneous general purpose machinery manufacturing

  • Filter Elements

    Department of the Navy, Norfolk Naval Shipyard GF

    SolicitationSmall businessNAICS 333998Ship to Portsmouth, VAN4215827QE016
    Due tomorrowNov 27
  • LEVEL ASSEMBLY, AIRC

    Defense Logistics Agency, DLA Aviation

    Sources soughtNAICS 333998Ship to the buyerSPE4A727R0166
    Due tomorrowNov 27
  • SEAL RING,NUCLEAR C

    Department of the Navy, NAVSUP Weapon Systems Support Mech

    SolicitationNAICS 333998Ship to the buyerN0010427QBB78
    Due tomorrowNov 27

All 115 open in all other miscellaneous general purpose machinery manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 333998 (all other miscellaneous general purpose machinery manufacturing), means no more than 700 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 30 days from the day the solicitation was posted, July 30, 2024, to the deadline. The deadline moved once: it was first August 27, 2024 and ended as August 29, 2024.
Before the solicitation
The agency published a presolicitation on July 28, 2024, 2 days before the solicitation.
How it ended
Awarded to Precision Equipment, Inc. on September 9, 2024, 11 days after offers were due. The contracting office reported 1 offer (competed under simplified acquisition procedures).

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

CONTACT INFORMATION|4|N742.11|WR3DD|717-605-7574|ashton.k.perry.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001|FIVE (5)|365|||||||||||||||||| REPAIR DELIVERY (FIRM FIXED PRICE)|1|365| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoice Combo |Material - Inspect & Accept at Source |TBD|N00104|TBD|Certifications - N45404, Material - TBD|Certifications - N45404 / Material - Ship to:

SW3215|TBD|N/A|N/A|N/A|See form DD1423|N/A|N/A|See form DD1423|1-866-618-5988 - WAWF Helpdesk| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13||X|||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|333998|700|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF).

2. All contractual documents (i.e. contracts, purchase orders, deliveryorders, task orders, and modifications) related to the instant procurement areconsidered to be 'issued' by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to 'issue' contractual documents asdetailed herein.

3. If requirement will be packaged at a location different from the offeror'saddress, the offeror?s shall provide the name, address, and CAGE of thefacility. 4. Any contract awarded as a result of this solicitation will be DO certifiedfor national defense under the Defense Priorities and Allocations System(DPAS). Provision 52.211-13, Notice of Priority Rating for National Defense,Emergency Preparedness, and Energy Program Use, shall be inserted insolicitations when the contract to be awarded shall be a rated order.

5. Repair Turnaround Time (RTAT): the resultant contractual deliveryrequirement is measured from asset Return to the date of asset acceptance underthe terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.

In accordance with the CAV Statement of Work, thecontractor is required to accurately report all transactions by the end of thefifth regular business day after receipt and the Action Date entered in CAVmust be dated to reflect the actual date of physical receipt. The Contractormust obtain final inspection and acceptance by the Government for all assetswithin the RTATs established in this contract.

Requested RTAT: 365 Days Proposals shall reference the proposed RTAT and any capacity constraints. Please provide repair price as firm fixed price (FFP) or estimated (EST).Specify on proposal FFP or EST. If you choose firm repair pricing, considerthe following:

Include repair price with all costs associated with receipt and completerepair of material that may be in unwhole condition, missing hardware,damaged,handling damage, missing parts, wear damage, and CAV reporting. All transportation to/from repair site will be paid for by US Navy. Also, please provide:

Teardown and Evaluation Rate:

RTAT:

Throughput Constraint:

Induction Expiration Date:

6. Price Reduction: Any assets for which the contractor does not meet the required RTAT will incura price reduction of XXXX per unit. Any assets for which the contractor doesnot meet the required RTAT will incur a price reduction of XXXX per unit. Thisadjustment will be implemented via a reconciliation modification at the end ofcontract performance.

Price reductions made pursuant to this section shall notlimit other remedies available to the Government for failure to meet requiredRTATs, including but not limited to the Government's right to terminate fordefault. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the ACCUMULATOR .

2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number".

These items should be retained until an award is made.

DRAWING DATA=NSWCPD-0074-17 |53711| -|LR |D|0001 | -|49998|0183922 DRAWING DATA=PY-60172 |53711| -|LR |D|0001 | -|49998|0478517 DRAWING DATA=PY-60172 |53711| -|LR |D|0002 | -|49998|0049098 DRAWING DATA=PYR-14060 |53711| 2|LR |D|0001 | 2|49998|0053097 DRAWING DATA=PYR-14060 |53711| 2|LR |D|0002 | 2|49998|0045962 DRAWING DATA=PYR-14060 |53711| 2|LR |D|0003 | 2|49998|0034184 DRAWING DATA=PYR-14060 |53711| 2|LR |D|0004 | 2|49998|0024477 DRAWING DATA=PYR-14060 |53711| 2|LR |D|0005 | 2|49998|0019568 DRAWING DATA=4457601 |53711| W| |D|0001 | W|49998|0478327 DRAWING DATA=4457602 |53711| L| |D|0001 | L|49998|0241905 DRAWING DATA=4457603 |53711| R| |D|0001 | R|49998|0286220 3. REQUIREMENTS 3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;53711; , drawing ;4457601 ASSY 94; ,and the applicable SUBMEPP Repair Instruction ;5560-012-0717 Rev G CHG 5, (CSD556); , except as amplified or modified herein.

3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction. 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD556, CSD428, CSD429, CSD426 AND CSD427; in ECDS at https://register.nslc.navy.mil/ 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.

5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. 5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.

MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
MS9QEH2JMKT3
CAGE
3SNU0
Vendor location
Portland, OR
Contract
N0010424PZB28, purchase order
Obligated
$112,205.00
Actions
3 between September 9, 2024 and November 26, 2025
Competition
Competed Under SAP, 1 offer received
Set-aside reported
Small Business Set Aside - Total
Described as
Accumulator
Match
solicitation number N0010424QZC16 equals the FPDS solicitation identifier; same awarding office N00104 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 28, 2024

    Presolicitation

    Due August 27, 2024 at 12:00 AM EDT. SAM.gov, notice 9591b330170244b4a79e6cad66d0fa86

  2. July 30, 2024

    Solicitation

    Due August 29, 2024 at 4:30 PM EDT. SAM.gov, notice 53e0805239384b58bf3a2f92d1f21d98

  3. August 7, 2024

    Solicitation

    Due August 29, 2024 at 4:30 PM EDT. SAM.gov, notice 32588d2ed9a3474da22af45a95a123cc

Points of contact