Presolicitation, first published as solicitation
PUMP, CENTRIFUGAL
N0010423QJD95
Department of the Navy, NAVSUP Weapon Systems Support Mech. Measuring, Dispensing, and Other Pumping Equipment Manufacturing.
Response deadline
February 23, 2024 at 4:30 PM EST
Closed 1007 days ago. Posted February 16, 2024, first published January 23, 2024. Scheduled to archive March 9, 2024.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2024
54 like it are open now in measuring, dispensing, and other pumping equipment manufacturing
- PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF
Department of the Navy, NAVSUP Weapon Systems Support Mech
PresolicitationNAICS 333914Ship to the buyerN0010426RTB38Due tomorrowNov 27 - PUMP/MOTOR ASSY
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 333914Ship to the buyerN0010423RCD46Due tomorrowNov 27 - PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF
Department of the Navy, NAVSUP Weapon Systems Support
SolicitationNAICS 333914Ship to the buyerN0038327QHA10Due tomorrowNov 27
All 54 open in measuring, dispensing, and other pumping equipment manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333914 (measuring, dispensing, and other pumping equipment manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 31 days from the day the solicitation was posted, January 23, 2024, to the deadline. The deadline moved once: it was first January 26, 2024 and ended as February 23, 2024.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
** Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ** All freight is FOB Origin. This RFP is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of:
100 days Government Source Inspection (GSI) is required. Please note freight is handled by Navy CAV or Proxy CAV as stated in NAVSUPWSSFA24 or NAVSUPWSSFA25. Your quote should include the following information:
QUOTE AMOUNT AND RTAT
Unit Price:
Total Price:
Repair Turnaround Time (RTAT):
days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints?
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.
In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. *Check one: Firm-fixed-Price
Estimated
NTE
Return Material Authorization # (RMA), if applicable:
Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) : N0010423GZU01
TESTING AND EVALUATION IF BEYOND REPAIR
T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $
associated with the repair effort to reflect the BR status of the equipment. *The T&E fee (if asset is determined BR/BER) was determined/computed based on:
.
AWARDEE INFO & PERFORMANCE LOCATION
Awardee CAGE:
Inspection & Acceptance CAGE, if not same as "awardee CAGE":
Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":
IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW
New unit price:
New unit delivery lead-time:
IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "reconciliation modification" at the end of the contract performance.
Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. INSPECTION AT ORIGIN ACCEPTANCE AT ORIGIN
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 23, 2024
Solicitation
PUMP,CENTRIFUGAL
Due January 26, 2024 at 3:30 PM EST. SAM.gov, notice a14ec48ae1d6415eb9ca3889ebeae626
January 23, 2024
Solicitation
PUMP,CENTRIFUGAL
Due January 26, 2024 at 3:30 PM EST. SAM.gov, notice a82ccb6b029f4d19bbc69cad8e2fe386
February 16, 2024
Presolicitation
Due February 23, 2024 at 4:30 PM EST. SAM.gov, notice 26569697a19740f29808fb93a7d670d4
Points of contact
- Gregory Blissmangregory.blissman@navy.mil