Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,703 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Sources sought

Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades (New Single Story PEMB/Demo Old Building)

MrktSrvy-IWTPUpgrade-MMAC

Federal Aviation Administration, 6973GH Franchise Acquisition SVCS. Water and Sewer Line and Related Structures Construction.

Response deadline

June 22, 2026 at 4:00 PM EDT

Closed 157 days ago. Posted June 1, 2026. Scheduled to archive July 7, 2026.

Get the next one like this from Federal Aviation Administration by email, the day it is posted.Find my opportunities

This one closed in 2026

25 like it are open now in water and sewer line and related structures construction

All 25 open in water and sewer line and related structures construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237110 (water and sewer line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation has been published under this number yet. The sources sought of June 1, 2026 is the earliest notice of the purchase.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

*********************THIS IS A MARKET SURVEY ONLY********************
- This is not a Screening Information Request or Request for Proposals of any kind;
- The FAA is not seeking or accepting unsolicited proposals;
- The FAA will not pay for any information received or costs incurred in preparing the response to the market survey; and
- Any costs associated with the market survey submittal are solely at the interested vendor’s expense. ******************************************************************************

1. This market survey is for Industrial Wastewater Treatment Plant (IWTP) which include demo existing building and construct a new Pre-Engineered Metal Building (PEMB) as identified below.

b. Disclosure of the Size of Construction Projects: This potential project is estimated to be between $10,000,000 and $20,000,000

a. Provide all labor, equipment, and materials to demolish existing Industrial Wastewater Treatment Plant (IWTP) and associated equipment.  Replace with a new building located north of the existing plant as well as new lift stations and forcemain piping. The project includes:

  • A new single story, Pre-Engineered Metal Building (PEMB) approximately 4,900 Gross Square Feet. Primary space is an industrial waste treatment processing area, with accessory office/work areas, equalization tank/area, storm shelter restroom, and utility support spaces.
     
  • The existing IWTP plant (eIWTP) will be decommissioned and demolished once the new IWTP (nIWTP) plant has been built and flow has been diverted to the nIWTP for processing.
     
  • Lift Stations #1, 3, and 4 will be replaced with new double-walled fiberglass wet wells to ensure full secondary containment.  Lift stations #2 and #5 will be demolished and filled in with select fill and covered with sod.
     
  • The existing concrete containment trench that houses the industrial waste force mains from the lift stations to the eIWTP will be demolished in full and removed.  New 4-inch inner diameter by 6-inch outer diameter double-walled CPVC piping will be installed via direct bury, along the path of the removed trench.

2. Market Survey Response should include the following:

a. Capability Statement - This document should identify:
- Type of services provided by firm,
- Size and type of services provided on previous government/private sector contracts
- Number of years in business
- Small Business Size Status to include applicable small business socio-economic status
- Current SAM.gov Registration status and SAM.gov UEI

b. Brief information (Agency or Customer/Dollar Amount/Scope/etc) regarding past projects respondent has completed with similar magnitude and work that is identified in this Market Survey 

All responses to this market survey must be received by June 22, 2026, 3:00 p.m. CT. All capability statements must be submitted by email to: andre.casiano@faa.gov
 

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 1, 2026

    Sources sought

    Due June 22, 2026 at 4:00 PM EDT. SAM.gov, notice cfcba675b3704e079548c33cdadbf656

    1 revision on SAM
    • June 1, 2026: publish, sources sought

Points of contact