Sources sought, total small business set-aside
Building 510 Substation Upgrade - Phase I
MH484019
Department of Energy, Brookhaven Natl Lab -Doe Contractor. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
October 23, 2026 at 4:00 PM EDT
Closed 33 days ago. Posted October 12, 2026. Scheduled to archive November 7, 2026.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed 33 days ago
42 like it are open now in electrical contractors and other wiring installation contractors
- INSTALLATION OF PROXIMITY SENSORS FOR AUTOMATIC DOORS
Department of Veterans Affairs, 246-Network Contracting Office 6
SolicitationNAICS 238210Ship to Fayetteville, NC36C24627Q0114Due todayNov 25 - Electrical Installation of 5-Station Cubicle and One Single Hotel Desk Arrangement
Agricultural Research Service, USDA ARS Afm Apd
Combined synopsis and solicitationSmall businessNAICS 238210Madison, WI1232SA27Q0021Due todayNov 25 - USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements
Forest Service, Usda-Fs, Csa Intermountain 9
Combined synopsis and solicitationSmall businessNAICS 238210West Yellowstone, MT1240LU26Q0132Due tomorrowNov 26
All 42 open in electrical contractors and other wiring installation contractors
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238210 (electrical contractors and other wiring installation contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation has been published under this number yet. The sources sought of October 12, 2026 is the earliest notice of the purchase.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Notice of Interest: BSA is seeking interested contractors capable of performing the work describled below and interested in receiving the forthcoming solicitation. The formal solicitation will be issued at a later date and will also be posted on SAM.gov at that time. Note that switchgear and transformers are being provided to the contractor as Government Furnished Equipment (GFE). Interested contractors are invited to submit a statement of interest along with a capabilities statement to BSA's Contract Specialist, Megan Howard, at mhoward@bnl.gov. Please include your Sam.gov Unique Entity Identifier (UEI).
Project Description:
The Physics Building was constructed in 1962 and much of the electrical system, original to the building, is beyond its useful life. These systems are also not compliant with current building codes, contain hazardous materials and need complete upgrades. The existing protective devices may not operate as specified, increasing the potential for arc-flash hazards and system damaging electrical faults. Repairs are cost prohibitive and may lead to extended unplanned outages in this mission critical facility.
The Contractor shall provide all labor, supervision, materials (except as noted below), equipment, and services necessary for complete removal and upgrading of the existing Building 510 electrical substation equipment that feeds the newly replaced electrical distribution switchgear. This project includes the removal of two medium voltage substation transformers, one medium voltage oil switch and medium voltage distribution cabling. The project also includes the installation of a new exterior substation with two new medium voltage transformers, one pad mounted medium voltage switchgear and medium voltage feeders in a new concrete encased duct bank. The new substation will be constructed in the north-loading dock parking lot, complete with new transformer and switchgear pads, grounding and crushed stone. Long lead electrical equipment procurements are planned early in the project and construction of the substation infrastructure can be completed in parallel. Once the cutovers are completed the old transformers and oil switch will be removed from the equipment vault in the basement of Building 510. The Contractor shall not procure the switchgear or transformers under this contract. Installation will be executed in a phased approach in order to minimize electric service disruptions to the building and will provide provisions for future redundant circuit configuration.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 12, 2026
Sources sought
Due October 23, 2026 at 4:00 PM EDT. SAM.gov, notice c59f6b8179ec49cc937da49033f9dd0b
1 revision on SAM
- October 12, 2026: publish, sources sought
Points of contact
- Megan Howardmhoward@bnl.gov6313442712
- Chad Wilsoncwilson@bnl.gov6313444886