Sources sought
LBNF Argon Condensers System 1 & 2
LBNF-ArCON2024-JD
Department of Energy, Fermilab - DOE Contractor. All Other Industrial Machinery Manufacturing.
Response deadline
August 23, 2024 at 6:00 PM EDT
Closed 824 days ago. Posted August 2, 2024. Scheduled to archive August 30, 2024.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2024
7 like it are open now in all other industrial machinery manufacturing
- Automated Digital Flatbed Cutting and Routing Equipment
Department of the Air Force, FA4877 355 Cons PK
Sources soughtNAICS 333248Ship to Tucson, AZFA487727QA028Due todayNov 25 - X209 Meltio M600 Laser Metal Wire 3D Printer FY27
Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor
Combined synopsis and solicitationNAICS 333248Ship to Oak Ridge, TNRFP518395Due in 5 daysNov 30 - Automated Fluidized Bed Mixer Facility Modernization for end use at Pine Bluff Arsenal – CSO
Department of the Army, W6QK ACC-RI
Due in 6 daysDec 1
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333248 (all other industrial machinery manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of August 2, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
A global neutrino physics community is developing a leading-edge, dual-site experiment for neutrino science and proton decay studies, the Deep Underground Neutrino Experiment (DUNE), hosted by Fermi National Accelerator Laboratory (Fermilab) in Batavia, IL (the Near Site). The facility required for this experiment, the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment-US (LBNF/DUNE-US), is an internationally designed, coordinated and funded program.
Once it is completed, it will comprise the world's highest-intensity neutrino beam, at Fermilab, and the infrastructure necessary to support massive, cryogenic detectors installed deep underground at the Sanford Underground Research Facility (SURF), 800 miles (1,300 km) downstream, in Lead, South Dakota (the Far Site). The LBNF/DUNE-US Project is also responsible for the facilities to house the experiment's near detectors on the Fermilab site.
The LBNF/DUNE-US beamline will be built off Fermilab's existing Main Injector, extracting a proton beam from this source and using magnets to direct the proton beam toward the DUNE detectors. Once the beam direction is established, the protons will smash into a target creating secondary particles, most of which decay into neutrinos in the decay pipe and continue traveling in the same direction. An absorber will stop the leftover secondary particles, creating a very pure beam of neutrinos for the experiment.
More information may be found at https://lbnf.fnal.gov Interested parties are highly encouraged to review the information available on the website provided in order to better understand the significance of the experiment, the breadth and scope of the associated construction efforts to be undertaken at Fermilab, and how efforts here will inform scientific understanding for years to come.
At the Far Site, Fermi Research Alliance, LLC (FRA), authorized by the U.S. Department of Energy (DOE) Office of High Energy Physics, will plan, design, and install massive neutrino detectors, each housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat.
DUNE (http://www.dunescience.org) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay. FRA is seeking firms to provide the engineering, manufacturing, testing and delivery of the Argon Condensers Systems supporting cryostats 1 and 2. Delivery is to the LBNF warehouse facility located in Rapid City, South Dakota USA.
The installation is performed by FRA under a different Subcontract with the possibility to assist during installation and/or to perform the installation as well. An overview of the scope is provided in the attached Draft Statement of Work dated May 2024. Anticipated Dates for Solicitation/Award:
Solicitation Issued:
February 2025 Solicitation Period: ~8 weeks Award of Subcontract:
November 2025 Final Delivery: No later than April 2027 The dates and details specified in this notice are subject to change as FRA continues to develop and refine its acquisition strategy. This Sources Sought notice is a tool for FRA to gauge the number and availability of firms in the global marketplace that may be able to successfully complete the Argon Condensers System scope within a timeframe that ensures uninterrupted progress of the LBNF/DUNE-US project.
FRA will utilize information received in response to this Source Sought notice to structure its acquisition strategy for the Argon Condensers. All expressions of interest must be accompanied by a completed Market Research Questionnaire, which is attached to this notice. The Questionnaire results will be utilized by FRA to understand the capabilities that exist in the vendor community.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 2, 2024
Sources sought
Due August 23, 2024 at 6:00 PM EDT. SAM.gov, notice 72e640cb2fb143a492a020121184b7bf
Points of contact
- Jeremy R. Duncanjeremyd@fnal.gov8653000443