{"canonical":"https://sealedbidder.com/opportunities/lbnf372669jd","key":"LBNF372669JD","url":"https://sealedbidder.com/opportunities/lbnf372669jd","title":"LBNF Liquid Argon LAr Circulation Equipment","solicitation_number":"LBNF-372669-JD","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-01-30T23:00:00Z","first_posted":"2025-11-05","last_posted":"2026-01-22","department":"ENERGY, DEPARTMENT OF","subagency":"ENERGY, DEPARTMENT OF","office":"FERMILAB - DOE CONTRACTOR","naics":"3332","psc":"3695","set_aside":null,"place_state":"SD","place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":null,"place_county":"46081","place_county_name":"Lawrence County","place_city":"4636220","place_city_name":"Lead","winner":null,"award_amount":null,"publications":[{"notice_id":"4505dec3e1a64de2a951d22069837069","title":"LBNF Liquid Argon LAr Circulation Equipment","solicitation_number":"LBNF-372669-JD","notice_type":"o","base_type":"o","posted":"2025-11-05","posted_at":"2025-11-05T18:57:40.738Z","due_at":"2025-12-04T23:00:00Z","due_date":"2025-12-04","cancelled":false,"archived":true,"archive_date":"2025-12-19","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4505dec3e1a64de2a951d22069837069/view","enriched":true,"history":[{"index":5,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-23T00:53:56.275Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"87f5daaa798b4d958f916286d310edfe","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":3,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T15:21:12.951Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4d5a3c135fb1462d8e67731e57894a57","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":2,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-26T17:03:00.140Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c53d1e040c394af283d57f079a645249","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":1,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-05T18:57:40.738Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"4505dec3e1a64de2a951d22069837069","solicitation_number":"LBNF-372669-JD"}]},{"notice_id":"c53d1e040c394af283d57f079a645249","title":"LBNF Liquid Argon LAr Circulation Equipment","solicitation_number":"LBNF-372669-JD","notice_type":"o","base_type":"o","posted":"2025-11-26","posted_at":"2025-11-26T17:03:00.140Z","due_at":"2026-01-05T23:00:00Z","due_date":"2026-01-05","cancelled":false,"archived":true,"archive_date":"2026-01-20","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c53d1e040c394af283d57f079a645249/view","enriched":true,"history":[{"index":5,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-23T00:53:56.275Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"87f5daaa798b4d958f916286d310edfe","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":3,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T15:21:12.951Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4d5a3c135fb1462d8e67731e57894a57","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":2,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-26T17:03:00.140Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c53d1e040c394af283d57f079a645249","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":1,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-05T18:57:40.738Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"4505dec3e1a64de2a951d22069837069","solicitation_number":"LBNF-372669-JD"}]},{"notice_id":"4d5a3c135fb1462d8e67731e57894a57","title":"LBNF Liquid Argon LAr Circulation Equipment","solicitation_number":"LBNF-372669-JD","notice_type":"o","base_type":"o","posted":"2025-12-31","posted_at":"2025-12-31T15:21:12.951Z","due_at":"2026-01-23T23:00:00Z","due_date":"2026-01-23","cancelled":false,"archived":true,"archive_date":"2026-02-07","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4d5a3c135fb1462d8e67731e57894a57/view","enriched":true,"history":[{"index":5,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-23T00:53:56.275Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"87f5daaa798b4d958f916286d310edfe","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":3,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T15:21:12.951Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4d5a3c135fb1462d8e67731e57894a57","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":2,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-26T17:03:00.140Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c53d1e040c394af283d57f079a645249","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":1,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-05T18:57:40.738Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"4505dec3e1a64de2a951d22069837069","solicitation_number":"LBNF-372669-JD"}]},{"notice_id":"87f5daaa798b4d958f916286d310edfe","title":"LBNF Liquid Argon LAr Circulation Equipment","solicitation_number":"LBNF-372669-JD","notice_type":"o","base_type":"o","posted":"2026-01-22","posted_at":"2026-01-23T00:53:56.275Z","due_at":"2026-01-30T23:00:00Z","due_date":"2026-01-30","cancelled":false,"archived":true,"archive_date":"2026-02-14","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/87f5daaa798b4d958f916286d310edfe/view","enriched":true,"history":[{"index":5,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-23T00:53:56.275Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"87f5daaa798b4d958f916286d310edfe","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":3,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T15:21:12.951Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4d5a3c135fb1462d8e67731e57894a57","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":2,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-26T17:03:00.140Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c53d1e040c394af283d57f079a645249","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":1,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-05T18:57:40.738Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"4505dec3e1a64de2a951d22069837069","solicitation_number":"LBNF-372669-JD"}]}],"latest_notice_id":"87f5daaa798b4d958f916286d310edfe","first_type":"o","notices":[{"dates":{"posted":"2025-11-05","posted_at":"2025-11-05T18:57:40.738Z","created_at":"2025-11-05T18:36:26.028Z","modified_at":"2026-02-14T05:04:24.842Z","response_deadline":{"raw":"2025-12-04T17:00:00-06:00","utc":"2025-12-04T23:00:00Z","date":"2025-12-04","time":"17:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4505dec3e1a64de2a951d22069837069/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Liquid Argon LAr Circulation Equipment","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_id":"500047667","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-19","archive_type":"auto15"},"history":[{"index":5,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-23T00:53:56.275Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"87f5daaa798b4d958f916286d310edfe","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":3,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T15:21:12.951Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4d5a3c135fb1462d8e67731e57894a57","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":2,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-26T17:03:00.140Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c53d1e040c394af283d57f079a645249","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":1,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-05T18:57:40.738Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"4505dec3e1a64de2a951d22069837069","solicitation_number":"LBNF-372669-JD"}],"contacts":[{"name":"Jeremy Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4505dec3e1a64de2a951d22069837069","lineage_id":"4505dec3e1a64de2a951d22069837069","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-24T00:02:07.541383394Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"f450f281fe3f9b2a2624c8071e87367d491b56dafbaa6a3194e40ca585d4d2c8","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-24T00:02:07.541383394Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>A brief summary of the scope is provided below.&nbsp; For complete details please download the Statement of Work attached to this notice.</p>\n\n<p>The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).</p>\n\n<p><u>Scope Overview of the Supply Structure</u></p>\n\n<p>The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW</p>\n\n<p>&bull; Vacuum Jacketed Pump Valve Box</p>\n\n<p>&bull; MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)</p>\n\n<p>&bull; Instrumentation</p>\n\n<p>&bull; Isolation Valves</p>\n\n<p>&bull; Pressure Safety Valves</p>\n\n<p>&bull; Cryogenic Equipment Protection (Platforms, Ladders and Supports</p>","text":"A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice.\n\nThe LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).\n\nScope Overview of the Supply Structure\n\nThe LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW\n\n• Vacuum Jacketed Pump Valve Box\n\n• MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)\n\n• Instrumentation\n\n• Isolation Valves\n\n• Pressure Safety Valves\n\n• Cryogenic Equipment Protection (Platforms, Ladders and Supports","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-372669-JD","place_of_performance":{"city":{"code":"36220","name":"Lead"},"state":{"code":"SD","name":"South Dakota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"3695"},{"dates":{"posted":"2025-11-26","posted_at":"2025-11-26T17:03:00.140Z","created_at":"2025-11-26T16:42:41.674Z","modified_at":"2026-02-14T05:04:24.842Z","response_deadline":{"raw":"2026-01-05T17:00:00-06:00","utc":"2026-01-05T23:00:00Z","date":"2026-01-05","time":"17:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c53d1e040c394af283d57f079a645249/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Liquid Argon LAr Circulation Equipment","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_id":"500047667","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-20","archive_type":"auto15"},"history":[{"index":5,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-23T00:53:56.275Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"87f5daaa798b4d958f916286d310edfe","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":3,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T15:21:12.951Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4d5a3c135fb1462d8e67731e57894a57","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":2,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-26T17:03:00.140Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c53d1e040c394af283d57f079a645249","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":1,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-05T18:57:40.738Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"4505dec3e1a64de2a951d22069837069","solicitation_number":"LBNF-372669-JD"}],"contacts":[{"name":"Jeremy Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c53d1e040c394af283d57f079a645249","lineage_id":"4505dec3e1a64de2a951d22069837069","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-21T02:11:43.908897195Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"8a286b8c6a43d538db33ae8d07efc579efc5d2fae54901ab235baf5fd4e1a2da","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-21T02:11:43.908897195Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>A brief summary of the scope is provided below.&nbsp; For complete details please download the Statement of Work attached to this notice.</p>\n\n<p>The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).</p>\n\n<p><u>Scope Overview of the Supply Structure</u></p>\n\n<p>The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW</p>\n\n<p>&bull; Vacuum Jacketed Pump Valve Box</p>\n\n<p>&bull; MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)</p>\n\n<p>&bull; Instrumentation</p>\n\n<p>&bull; Isolation Valves</p>\n\n<p>&bull; Pressure Safety Valves</p>\n\n<p>&bull; Cryogenic Equipment Protection (Platforms, Ladders and Supports</p>","text":"A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice.\n\nThe LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).\n\nScope Overview of the Supply Structure\n\nThe LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW\n\n• Vacuum Jacketed Pump Valve Box\n\n• MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)\n\n• Instrumentation\n\n• Isolation Valves\n\n• Pressure Safety Valves\n\n• Cryogenic Equipment Protection (Platforms, Ladders and Supports","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-372669-JD","place_of_performance":{"city":{"code":"36220","name":"Lead"},"state":{"code":"SD","name":"South Dakota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"3695"},{"dates":{"posted":"2025-12-31","posted_at":"2025-12-31T15:21:12.951Z","created_at":"2025-12-31T15:11:24.859Z","modified_at":"2026-02-14T05:04:24.842Z","response_deadline":{"raw":"2026-01-23T17:00:00-06:00","utc":"2026-01-23T23:00:00Z","date":"2026-01-23","time":"17:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4d5a3c135fb1462d8e67731e57894a57/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Liquid Argon LAr Circulation Equipment","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_id":"500047667","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-07","archive_type":"auto15"},"history":[{"index":5,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-23T00:53:56.275Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"87f5daaa798b4d958f916286d310edfe","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":3,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T15:21:12.951Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4d5a3c135fb1462d8e67731e57894a57","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":2,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-26T17:03:00.140Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c53d1e040c394af283d57f079a645249","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":1,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-05T18:57:40.738Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"4505dec3e1a64de2a951d22069837069","solicitation_number":"LBNF-372669-JD"}],"contacts":[{"name":"Jeremy Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4d5a3c135fb1462d8e67731e57894a57","lineage_id":"4505dec3e1a64de2a951d22069837069","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-17T04:39:57.786448732Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"84d4e4487862871ea5c10e7283f02e304b4ab5f43a7153da54692fe8e9b3a89f","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-17T04:39:57.786448732Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>A brief summary of the scope is provided below.&nbsp; For complete details please download the Statement of Work attached to this notice.</p>\n\n<p>The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).</p>\n\n<p><u>Scope Overview of the Supply Structure</u></p>\n\n<p>The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW</p>\n\n<p>&bull; Vacuum Jacketed Pump Valve Box</p>\n\n<p>&bull; MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)</p>\n\n<p>&bull; Instrumentation</p>\n\n<p>&bull; Isolation Valves</p>\n\n<p>&bull; Pressure Safety Valves</p>\n\n<p>&bull; Cryogenic Equipment Protection (Platforms, Ladders and Supports</p>","text":"A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice.\n\nThe LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).\n\nScope Overview of the Supply Structure\n\nThe LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW\n\n• Vacuum Jacketed Pump Valve Box\n\n• MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)\n\n• Instrumentation\n\n• Isolation Valves\n\n• Pressure Safety Valves\n\n• Cryogenic Equipment Protection (Platforms, Ladders and Supports","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-372669-JD","place_of_performance":{"city":{"code":"36220","name":"Lead"},"state":{"code":"SD","name":"South Dakota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"3695"},{"dates":{"posted":"2026-01-22","posted_at":"2026-01-23T00:53:56.275Z","created_at":"2026-01-23T00:52:22.673Z","modified_at":"2026-02-14T05:04:24.842Z","response_deadline":{"raw":"2026-01-30T17:00:00-06:00","utc":"2026-01-30T23:00:00Z","date":"2026-01-30","time":"17:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/87f5daaa798b4d958f916286d310edfe/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Liquid Argon LAr Circulation Equipment","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_id":"500047667","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-14","archive_type":"auto15"},"history":[{"index":5,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-23T00:53:56.275Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"87f5daaa798b4d958f916286d310edfe","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":3,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T15:21:12.951Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4d5a3c135fb1462d8e67731e57894a57","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":2,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-26T17:03:00.140Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c53d1e040c394af283d57f079a645249","solicitation_number":"LBNF-372669-JD","parent_opportunity_id":"4505dec3e1a64de2a951d22069837069"},{"index":1,"title":"LBNF Liquid Argon LAr Circulation Equipment","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-05T18:57:40.738Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"4505dec3e1a64de2a951d22069837069","solicitation_number":"LBNF-372669-JD"}],"contacts":[{"name":"Jeremy Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"87f5daaa798b4d958f916286d310edfe","lineage_id":"4505dec3e1a64de2a951d22069837069","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-15T02:07:40.387145453Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"29c99dea2563e9e04fd3b6e06574f0125e82eb17949f83ed2d620e42c60dc7cc","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-15T02:07:40.387145453Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>A brief summary of the scope is provided below.&nbsp; For complete details please download the Statement of Work attached to this notice.</p>\n\n<p>The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).</p>\n\n<p><u>Scope Overview of the Supply Structure</u></p>\n\n<p>The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW</p>\n\n<p>&bull; Vacuum Jacketed Pump Valve Box</p>\n\n<p>&bull; MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)</p>\n\n<p>&bull; Instrumentation</p>\n\n<p>&bull; Isolation Valves</p>\n\n<p>&bull; Pressure Safety Valves</p>\n\n<p>&bull; Cryogenic Equipment Protection (Platforms, Ladders and Supports</p>","text":"A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice.\n\nThe LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).\n\nScope Overview of the Supply Structure\n\nThe LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW\n\n• Vacuum Jacketed Pump Valve Box\n\n• MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)\n\n• Instrumentation\n\n• Isolation Valves\n\n• Pressure Safety Valves\n\n• Cryogenic Equipment Protection (Platforms, Ladders and Supports","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-372669-JD","place_of_performance":{"city":{"code":"36220","name":"Lead"},"state":{"code":"SD","name":"South Dakota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"3695"}],"due_at":"2026-01-30T23:00:00Z","due_date":"2026-01-30","closes_at":"2026-01-30T23:00:00Z","awardable":true,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","state":"SD","county":"46081","county_name":"Lawrence County","city":"4636220","city_name":"Lead","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-15T02:32:28.018113Z","principal_notice_id":"87f5daaa798b4d958f916286d310edfe","description":{"text":"A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice.\n\nThe LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).\n\nScope Overview of the Supply Structure\n\nThe LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW\n\n• Vacuum Jacketed Pump Valve Box\n\n• MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)\n\n• Instrumentation\n\n• Isolation Valves\n\n• Pressure Safety Valves\n\n• Cryogenic Equipment Protection (Platforms, Ladders and Supports","html":"<p>A brief summary of the scope is provided below.&nbsp; For complete details please download the Statement of Work attached to this notice.</p>\n\n<p>The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).</p>\n\n<p><u>Scope Overview of the Supply Structure</u></p>\n\n<p>The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW</p>\n\n<p>&bull; Vacuum Jacketed Pump Valve Box</p>\n\n<p>&bull; MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)</p>\n\n<p>&bull; Instrumentation</p>\n\n<p>&bull; Isolation Valves</p>\n\n<p>&bull; Pressure Safety Valves</p>\n\n<p>&bull; Cryogenic Equipment Protection (Platforms, Ladders and Supports</p>","origin":"detail"},"contacts":[{"name":"Jeremy Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"place_of_performance":{"city":{"code":"36220","name":"Lead"},"state":{"code":"SD","name":"South Dakota"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"naics_codes":["3332"],"award":null,"attachments":[{"resource_id":"33fbc4a889a64bd6afc874f224fec92a","name":"J-14 Drawing BNCP-76-998.pdf","kind":"file","mime_type":".pdf","size_bytes":212533,"posted_at":"2025-11-05T18:57:40.738Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/33fbc4a889a64bd6afc874f224fec92a/download","mirrored":false}],"awards":[],"related":[{"key":"378854MR","latest_notice_id":"e1f72176eb994530a1340e9bf2a51a91","title":"PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION","solicitation_number":"378854_MR","notice_type":"o","first_type":"o","first_posted":"2026-10-08","last_posted":"2026-11-16","notices":5,"due_at":"2026-12-03T20:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"23822","psc":"K056","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"385439GMK","latest_notice_id":"e17f8904e0134bd890eafbae01571c74","title":"UTILITY EXCAVATION AND REPAIR SERVICES IDIQ","solicitation_number":"385439GMK","notice_type":"o","first_type":"o","first_posted":"2026-11-06","last_posted":"2026-11-06","notices":1,"due_at":"2026-12-07T21:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"238910","psc":"Y1PZ","set_aside":"SBA","state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"},{"key":"RFIVACUUMVESSELS","latest_notice_id":"ea26e0b581dc4104b03163f640a7b274","title":"Request for Information - Vacuum Vessels","solicitation_number":"RFIVacuumVessels","notice_type":"p","first_type":"p","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-07T22:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"332710","psc":"AJ13","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"385515GMK","latest_notice_id":"65747435c0224a859780416b36f2d6bf","title":"Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade","solicitation_number":"385515GMK","notice_type":"o","first_type":"o","first_posted":"2026-10-22","last_posted":"2026-11-11","notices":3,"due_at":"2026-12-09T21:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-09T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"236220","psc":"Z2AZ","set_aside":"SBA","state":"IL","county":"17089","county_name":"Kane County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-12T04:43:37.498412Z"},{"key":"RFP389882","latest_notice_id":"c558db76dbe94287afb9c6eeaa5b8e49","title":"Cryogenic Mezzanine Structure","solicitation_number":"RFP389882","notice_type":"o","first_type":"o","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-11T22:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"33271","psc":"AJ13","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open":[],"similar_open_total":0,"indexable":false}