{"canonical":"https://sealedbidder.com/opportunities/lbnf355802jd","key":"LBNF355802JD","url":"https://sealedbidder.com/opportunities/lbnf355802jd","title":"LBNF Argon Distribution Equipment IDIQ","solicitation_number":"LBNF-355802-JD","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-02-14T23:00:00Z","first_posted":"2024-09-28","last_posted":"2025-02-06","department":"ENERGY, DEPARTMENT OF","subagency":"ENERGY, DEPARTMENT OF","office":"FERMILAB - DOE CONTRACTOR","naics":"3332","psc":"3695","set_aside":null,"place_state":"SD","place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":null,"place_county":"46081","place_county_name":"Lawrence County","place_city":"4636220","place_city_name":"Lead","winner":null,"award_amount":null,"publications":[{"notice_id":"3bd116191a1b41f8a8a197d0d080ecf6","title":"LBNF Argon Distribution Equipment IDIQ","solicitation_number":"LBNF-355802-JD","notice_type":"o","base_type":"o","posted":"2024-09-28","posted_at":null,"due_at":"2024-12-20T23:00:00Z","due_date":"2024-12-20","cancelled":null,"archived":null,"archive_date":"2025-01-04","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3bd116191a1b41f8a8a197d0d080ecf6/view","enriched":false,"history":[]},{"notice_id":"19a805c45b3e4508bdde114584f41fd6","title":"LBNF Argon Distribution Equipment IDIQ","solicitation_number":"LBNF-355802-JD","notice_type":"o","base_type":"o","posted":"2024-10-07","posted_at":null,"due_at":"2024-12-20T23:00:00Z","due_date":"2024-12-20","cancelled":null,"archived":null,"archive_date":"2025-01-04","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/19a805c45b3e4508bdde114584f41fd6/view","enriched":false,"history":[]},{"notice_id":"79df1458fb4843eda2b109b80d74b909","title":"LBNF Argon Distribution Equipment IDIQ","solicitation_number":"LBNF-355802-JD","notice_type":"o","base_type":"o","posted":"2024-11-26","posted_at":null,"due_at":"2024-12-20T23:00:00Z","due_date":"2024-12-20","cancelled":null,"archived":null,"archive_date":"2025-01-04","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/79df1458fb4843eda2b109b80d74b909/view","enriched":false,"history":[]},{"notice_id":"80f07552214a445aa325dfe3aa3fc4ec","title":"LBNF Argon Distribution Equipment IDIQ","solicitation_number":"LBNF-355802-JD","notice_type":"o","base_type":"o","posted":"2024-12-12","posted_at":null,"due_at":"2025-01-17T23:00:00Z","due_date":"2025-01-17","cancelled":null,"archived":null,"archive_date":"2025-02-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/80f07552214a445aa325dfe3aa3fc4ec/view","enriched":false,"history":[]},{"notice_id":"d8ecca608dcb40c88f3bb90d41a35997","title":"LBNF Argon Distribution Equipment IDIQ","solicitation_number":"LBNF-355802-JD","notice_type":"o","base_type":"o","posted":"2025-01-10","posted_at":null,"due_at":"2025-01-17T23:00:00Z","due_date":"2025-01-17","cancelled":null,"archived":null,"archive_date":"2025-02-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d8ecca608dcb40c88f3bb90d41a35997/view","enriched":false,"history":[]},{"notice_id":"abf023422ef44171887765ec29837f49","title":"LBNF Argon Distribution Equipment IDIQ","solicitation_number":"LBNF-355802-JD","notice_type":"o","base_type":"o","posted":"2025-01-17","posted_at":"2025-01-17T13:46:35.154Z","due_at":"2025-02-07T23:00:00Z","due_date":"2025-02-07","cancelled":false,"archived":true,"archive_date":"2025-02-22","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/abf023422ef44171887765ec29837f49/view","enriched":true,"history":[{"index":8,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-06T20:29:25.215Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"123a0462e1ee4e2d8731084b1e7a3eee","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":6,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T13:46:35.154Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"abf023422ef44171887765ec29837f49","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":5,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-10T19:49:59.182Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8ecca608dcb40c88f3bb90d41a35997","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":4,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-12T14:26:49.250Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"80f07552214a445aa325dfe3aa3fc4ec","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":3,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-26T18:15:08.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79df1458fb4843eda2b109b80d74b909","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":2,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-10-07T12:58:31.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"19a805c45b3e4508bdde114584f41fd6","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":1,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-28T18:55:40.456Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6","solicitation_number":"LBNF-355802-JD"}]},{"notice_id":"123a0462e1ee4e2d8731084b1e7a3eee","title":"LBNF Argon Distribution Equipment IDIQ","solicitation_number":"LBNF-355802-JD","notice_type":"o","base_type":"o","posted":"2025-02-06","posted_at":"2025-02-06T20:29:25.215Z","due_at":"2025-02-14T23:00:00Z","due_date":"2025-02-14","cancelled":false,"archived":true,"archive_date":"2025-03-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/123a0462e1ee4e2d8731084b1e7a3eee/view","enriched":true,"history":[{"index":8,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-06T20:29:25.215Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"123a0462e1ee4e2d8731084b1e7a3eee","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":6,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T13:46:35.154Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"abf023422ef44171887765ec29837f49","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":5,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-10T19:49:59.182Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8ecca608dcb40c88f3bb90d41a35997","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":4,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-12T14:26:49.250Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"80f07552214a445aa325dfe3aa3fc4ec","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":3,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-26T18:15:08.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79df1458fb4843eda2b109b80d74b909","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":2,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-10-07T12:58:31.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"19a805c45b3e4508bdde114584f41fd6","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":1,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-28T18:55:40.456Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6","solicitation_number":"LBNF-355802-JD"}]}],"latest_notice_id":"123a0462e1ee4e2d8731084b1e7a3eee","first_type":"o","notices":[{"dates":{"posted":"2024-09-28","response_deadline":{"raw":"2024-12-20T17:00:00-06:00","utc":"2024-12-20T23:00:00Z","date":"2024-12-20","time":"17:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3bd116191a1b41f8a8a197d0d080ecf6/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Argon Distribution Equipment IDIQ","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-04","archive_type":"auto15"},"contacts":[{"name":"Jeremy R. Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3bd116191a1b41f8a8a197d0d080ecf6","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"66f6bd49b2601bfba0ccfef03988d01493957f8beb9890318fcfbfb812d15630","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Please see the attached RFP and Statement of Work for complete information. In short, the Argon Distribution Equipment serves: To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF). To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF. As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats. To install hardware and equipment delivered by partners as In-Kind Contributions (IKC). To provide dry Nitrogen gas to the cryostat insulation space. To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing. As a connection between the LAr Purification and Purity Monitors. To analyze GN2 content of GAr from the surface during cryostat filling. LBNF Project Background: LBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-355802-JD","place_of_performance":{"city":{"name":"Lead"},"state":{"code":"SD"},"country":{"code":"USA"}},"product_service_code":"3695"},{"dates":{"posted":"2024-10-07","response_deadline":{"raw":"2024-12-20T17:00:00-06:00","utc":"2024-12-20T23:00:00Z","date":"2024-12-20","time":"17:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/19a805c45b3e4508bdde114584f41fd6/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Argon Distribution Equipment IDIQ","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-04","archive_type":"auto15"},"contacts":[{"name":"Jeremy R. Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"19a805c45b3e4508bdde114584f41fd6","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"191cc232fd9055d28e30f0fd6629e31c3bd9e83caacde4374b93d883a335389e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"Please see the attached RFP and Statement of Work for complete information. In short, the Argon Distribution Equipment serves: To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF). To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF. As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats. To install hardware and equipment delivered by partners as In-Kind Contributions (IKC). To provide dry Nitrogen gas to the cryostat insulation space. To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing. As a connection between the LAr Purification and Purity Monitors. To analyze GN2 content of GAr from the surface during cryostat filling. LBNF Project Background: LBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-355802-JD","place_of_performance":{"city":{"name":"Lead"},"state":{"code":"SD"},"country":{"code":"USA"}},"product_service_code":"3695"},{"dates":{"posted":"2024-11-26","response_deadline":{"raw":"2024-12-20T17:00:00-06:00","utc":"2024-12-20T23:00:00Z","date":"2024-12-20","time":"17:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/79df1458fb4843eda2b109b80d74b909/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Argon Distribution Equipment IDIQ","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-04","archive_type":"auto15"},"contacts":[{"name":"Jeremy R. Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"79df1458fb4843eda2b109b80d74b909","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"c94279b4f043b566d8e3d0441d54a3e6b434a4ff507ce2262cc96fad18d29ebc","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"Please see the attached RFP and Statement of Work for complete information. In short, the Argon Distribution Equipment serves: To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF). To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF. As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats. To install hardware and equipment delivered by partners as In-Kind Contributions (IKC). To provide dry Nitrogen gas to the cryostat insulation space. To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing. As a connection between the LAr Purification and Purity Monitors. To analyze GN2 content of GAr from the surface during cryostat filling. LBNF Project Background: LBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-355802-JD","place_of_performance":{"city":{"name":"Lead"},"state":{"code":"SD"},"country":{"code":"USA"}},"product_service_code":"3695"},{"dates":{"posted":"2024-12-12","response_deadline":{"raw":"2025-01-17T17:00:00-06:00","utc":"2025-01-17T23:00:00Z","date":"2025-01-17","time":"17:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/80f07552214a445aa325dfe3aa3fc4ec/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Argon Distribution Equipment IDIQ","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-01","archive_type":"auto15"},"contacts":[{"name":"Jeremy R. Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"80f07552214a445aa325dfe3aa3fc4ec","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"67d40dbd5f61ea9748c667756fa780241678a07fd3b5d0f6214b493dbabf1c3e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"Please see the attached RFP and Statement of Work for complete information. In short, the Argon Distribution Equipment serves: To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF). To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF. As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats. To install hardware and equipment delivered by partners as In-Kind Contributions (IKC). To provide dry Nitrogen gas to the cryostat insulation space. To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing. As a connection between the LAr Purification and Purity Monitors. To analyze GN2 content of GAr from the surface during cryostat filling. LBNF Project Background: LBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-355802-JD","place_of_performance":{"city":{"name":"Lead"},"state":{"code":"SD"},"country":{"code":"USA"}},"product_service_code":"3695"},{"dates":{"posted":"2025-01-10","response_deadline":{"raw":"2025-01-17T17:00:00-06:00","utc":"2025-01-17T23:00:00Z","date":"2025-01-17","time":"17:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d8ecca608dcb40c88f3bb90d41a35997/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Argon Distribution Equipment IDIQ","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-01","archive_type":"auto15"},"contacts":[{"name":"Jeremy R. Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d8ecca608dcb40c88f3bb90d41a35997","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"0af81afa6617a4360fefa30b34182715c287bff6f6d7c538614350d7130507e5","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Please see the attached RFP and Statement of Work for complete information. In short, the Argon Distribution Equipment serves: To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF). To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF. As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats. To install hardware and equipment delivered by partners as In-Kind Contributions (IKC). To provide dry Nitrogen gas to the cryostat insulation space. To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing. As a connection between the LAr Purification and Purity Monitors. To analyze GN2 content of GAr from the surface during cryostat filling. LBNF Project Background: LBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-355802-JD","place_of_performance":{"city":{"name":"Lead"},"state":{"code":"SD"},"country":{"code":"USA"}},"product_service_code":"3695"},{"dates":{"posted":"2025-01-17","posted_at":"2025-01-17T13:46:35.154Z","created_at":"2025-01-17T13:40:51.036Z","modified_at":"2025-03-01T05:04:24.737Z","response_deadline":{"raw":"2025-02-07T17:00:00-06:00","utc":"2025-02-07T23:00:00Z","date":"2025-02-07","time":"17:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/abf023422ef44171887765ec29837f49/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Argon Distribution Equipment IDIQ","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_id":"500047667","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-22","archive_type":"auto15"},"history":[{"index":8,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-06T20:29:25.215Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"123a0462e1ee4e2d8731084b1e7a3eee","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":6,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T13:46:35.154Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"abf023422ef44171887765ec29837f49","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":5,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-10T19:49:59.182Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8ecca608dcb40c88f3bb90d41a35997","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":4,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-12T14:26:49.250Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"80f07552214a445aa325dfe3aa3fc4ec","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":3,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-26T18:15:08.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79df1458fb4843eda2b109b80d74b909","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":2,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-10-07T12:58:31.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"19a805c45b3e4508bdde114584f41fd6","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":1,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-28T18:55:40.456Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6","solicitation_number":"LBNF-355802-JD"}],"contacts":[{"name":"Jeremy R. Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"abf023422ef44171887765ec29837f49","lineage_id":"3bd116191a1b41f8a8a197d0d080ecf6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-25T01:45:38.900793141Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"35ae4fcf0fc26f76ba34cb23a9173740baab464ef4c6d029daa1728db5edf589","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-25T01:45:38.900793141Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Please see the attached RFP and Statement of Work for complete information.&nbsp; In short, the Argon Distribution Equipment serves:</p>\n\n<ul>\n\t<li>To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF).</li>\n\t<li>To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF.</li>\n\t<li>As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats.</li>\n\t<li>To install hardware and equipment delivered by partners as In-Kind Contributions (IKC).</li>\n\t<li>To provide dry Nitrogen gas to the cryostat insulation space.</li>\n\t<li>To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing.</li>\n\t<li>As a connection between the LAr Purification and Purity Monitors.</li>\n</ul>\n\n<p>To analyze GN2 content of GAr from the surface during cryostat filling.</p>\n\n<p><u>LBNF Project Background:</u>&nbsp;</p>\n\n<p>LBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.</p>","text":"Please see the attached RFP and Statement of Work for complete information. In short, the Argon Distribution Equipment serves:\n\n• To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF).\n\n• To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF.\n\n• As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats.\n\n• To install hardware and equipment delivered by partners as In-Kind Contributions (IKC).\n\n• To provide dry Nitrogen gas to the cryostat insulation space.\n\n• To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing.\n\n• As a connection between the LAr Purification and Purity Monitors.\n\nTo analyze GN2 content of GAr from the surface during cryostat filling.\n\nLBNF Project Background:\n\nLBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-355802-JD","place_of_performance":{"city":{"code":"36220","name":"Lead"},"state":{"code":"SD","name":"South Dakota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"3695"},{"dates":{"posted":"2025-02-06","posted_at":"2025-02-06T20:29:25.215Z","created_at":"2025-02-06T20:27:11.856Z","modified_at":"2025-03-01T05:04:24.737Z","response_deadline":{"raw":"2025-02-14T17:00:00-06:00","utc":"2025-02-14T23:00:00Z","date":"2025-02-14","time":"17:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/123a0462e1ee4e2d8731084b1e7a3eee/view"},"naics":{"codes":["3332"],"primary":"3332"},"title":"LBNF Argon Distribution Equipment IDIQ","agency":{"office":{"code":"899034","name":"FERMILAB - DOE CONTRACTOR"},"subtier":{"code":"8900","name":"ENERGY, DEPARTMENT OF"},"department":{"code":"089","name":"ENERGY, DEPARTMENT OF"},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"organization_id":"500047667","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-01","archive_type":"auto15"},"history":[{"index":8,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-06T20:29:25.215Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"123a0462e1ee4e2d8731084b1e7a3eee","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":6,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-17T13:46:35.154Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"abf023422ef44171887765ec29837f49","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":5,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-10T19:49:59.182Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d8ecca608dcb40c88f3bb90d41a35997","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":4,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-12T14:26:49.250Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"80f07552214a445aa325dfe3aa3fc4ec","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":3,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-26T18:15:08.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79df1458fb4843eda2b109b80d74b909","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":2,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-10-07T12:58:31.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"19a805c45b3e4508bdde114584f41fd6","solicitation_number":"LBNF-355802-JD","parent_opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6"},{"index":1,"title":"LBNF Argon Distribution Equipment IDIQ","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-09-28T18:55:40.456Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3bd116191a1b41f8a8a197d0d080ecf6","solicitation_number":"LBNF-355802-JD"}],"contacts":[{"name":"Jeremy R. Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"123a0462e1ee4e2d8731084b1e7a3eee","lineage_id":"3bd116191a1b41f8a8a197d0d080ecf6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T02:45:39.158659416Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c9508bc0525bd07170337df00ecdd9faaee25b9dfbc0b8c0433b20915b029231","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T02:45:39.158659416Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Please see the attached RFP and Statement of Work for complete information.&nbsp; In short, the Argon Distribution Equipment serves:</p>\n\n<ul>\n\t<li>To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF).</li>\n\t<li>To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF.</li>\n\t<li>As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats.</li>\n\t<li>To install hardware and equipment delivered by partners as In-Kind Contributions (IKC).</li>\n\t<li>To provide dry Nitrogen gas to the cryostat insulation space.</li>\n\t<li>To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing.</li>\n\t<li>As a connection between the LAr Purification and Purity Monitors.</li>\n</ul>\n\n<p>To analyze GN2 content of GAr from the surface during cryostat filling.</p>\n\n<p><u>LBNF Project Background:</u>&nbsp;</p>\n\n<p>LBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.</p>","text":"Please see the attached RFP and Statement of Work for complete information. In short, the Argon Distribution Equipment serves:\n\n• To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF).\n\n• To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF.\n\n• As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats.\n\n• To install hardware and equipment delivered by partners as In-Kind Contributions (IKC).\n\n• To provide dry Nitrogen gas to the cryostat insulation space.\n\n• To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing.\n\n• As a connection between the LAr Purification and Purity Monitors.\n\nTo analyze GN2 content of GAr from the surface during cryostat filling.\n\nLBNF Project Background:\n\nLBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"LBNF-355802-JD","place_of_performance":{"city":{"code":"36220","name":"Lead"},"state":{"code":"SD","name":"South Dakota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"3695"}],"due_at":"2025-02-14T23:00:00Z","due_date":"2025-02-14","closes_at":"2025-02-14T23:00:00Z","awardable":true,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","state":"SD","county":"46081","county_name":"Lawrence County","city":"4636220","city_name":"Lead","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-23T03:29:21.518589Z","principal_notice_id":"123a0462e1ee4e2d8731084b1e7a3eee","description":{"text":"Please see the attached RFP and Statement of Work for complete information. In short, the Argon Distribution Equipment serves:\n\n• To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF).\n\n• To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF.\n\n• As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats.\n\n• To install hardware and equipment delivered by partners as In-Kind Contributions (IKC).\n\n• To provide dry Nitrogen gas to the cryostat insulation space.\n\n• To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing.\n\n• As a connection between the LAr Purification and Purity Monitors.\n\nTo analyze GN2 content of GAr from the surface during cryostat filling.\n\nLBNF Project Background:\n\nLBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.","html":"<p>Please see the attached RFP and Statement of Work for complete information.&nbsp; In short, the Argon Distribution Equipment serves:</p>\n\n<ul>\n\t<li>To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF).</li>\n\t<li>To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF.</li>\n\t<li>As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats.</li>\n\t<li>To install hardware and equipment delivered by partners as In-Kind Contributions (IKC).</li>\n\t<li>To provide dry Nitrogen gas to the cryostat insulation space.</li>\n\t<li>To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing.</li>\n\t<li>As a connection between the LAr Purification and Purity Monitors.</li>\n</ul>\n\n<p>To analyze GN2 content of GAr from the surface during cryostat filling.</p>\n\n<p><u>LBNF Project Background:</u>&nbsp;</p>\n\n<p>LBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.</p>","origin":"detail"},"contacts":[{"name":"Jeremy R. Duncan","role":"primary","email":"jeremyd@fnal.gov","phone":"8653000443"}],"place_of_performance":{"city":{"code":"36220","name":"Lead"},"state":{"code":"SD","name":"South Dakota"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"60510","city":"Batavia","state":"IL","country":"USA"},"naics_codes":["3332"],"award":null,"attachments":[{"resource_id":"28b318bb47944d6894f24b4d30f66960","name":"SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx","kind":"file","mime_type":".docx","size_bytes":49768,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/28b318bb47944d6894f24b4d30f66960/download","mirrored":false},{"resource_id":"6168f3e33e9247dc86587d2d79ccecec","name":"Mandatory Site Visit Registration Questionnaire Sept 2024.docx","kind":"file","mime_type":".docx","size_bytes":31063,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6168f3e33e9247dc86587d2d79ccecec/download","mirrored":false},{"resource_id":"0f2cf40b9b1b41cfb54954aef4443330","name":"FRA Safety Questionnaire (Rev. 08-17).pdf","kind":"file","mime_type":".pdf","size_bytes":116156,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0f2cf40b9b1b41cfb54954aef4443330/download","mirrored":false},{"resource_id":"e80ff009e70a422fb908a4a0f7b101b0","name":"J-15 Fixed Prices for Orders-04-25-2024 (1).xlsx","kind":"file","mime_type":".xlsx","size_bytes":30346,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e80ff009e70a422fb908a4a0f7b101b0/download","mirrored":false},{"resource_id":"89798955a2344c7494a835e6650ff0f3","name":"J-14 Wage Determination 2015-5377 Rev 26 07-22-2024.pdf","kind":"file","mime_type":".pdf","size_bytes":5024140,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/89798955a2344c7494a835e6650ff0f3/download","mirrored":false},{"resource_id":"b893868817d84ca8b424552e78f9eae1","name":"J-13 - Section 01320 Project Schedule_Final 02-14-2024.pdf","kind":"file","mime_type":".pdf","size_bytes":168309,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b893868817d84ca8b424552e78f9eae1/download","mirrored":false},{"resource_id":"6e0eadc35f474024a75b3396e608fc69","name":"J-8 - Section 014100 Cryo Quality Requirements_2-16-2024.pdf","kind":"file","mime_type":".pdf","size_bytes":191136,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6e0eadc35f474024a75b3396e608fc69/download","mirrored":false},{"resource_id":"60c7c93c15da4f3a9e5fa1e02b3a23a4","name":"J-7 - Section 013300 Submittals_02-14-2024.pdf","kind":"file","mime_type":".pdf","size_bytes":131386,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/60c7c93c15da4f3a9e5fa1e02b3a23a4/download","mirrored":false},{"resource_id":"0b466c93c34e47328ef2f0fa41549a15","name":"J-6 Section 010010 General Requirements Installation_Feb 2024.pdf","kind":"file","mime_type":".pdf","size_bytes":330080,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0b466c93c34e47328ef2f0fa41549a15/download","mirrored":false},{"resource_id":"4a56b1d0754148a49bd0ff04985e01d3","name":"J-5-Exhibit A.pdf","kind":"file","mime_type":".pdf","size_bytes":616926,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4a56b1d0754148a49bd0ff04985e01d3/download","mirrored":false},{"resource_id":"60bf1892ce144596aa06f86ea9bd0c9e","name":"J-4 - SOW Appendice C - Instructions for Downloading.docx","kind":"file","mime_type":".docx","size_bytes":147195,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/60bf1892ce144596aa06f86ea9bd0c9e/download","mirrored":false},{"resource_id":"be0ed0054c2b467fa6c7fdca2aa51c47","name":"J-4 - IDIQ Task Order 1 and 2 - Appendix A - FORM_2_Rev_B.3_load_envelopes.pdf","kind":"file","mime_type":".pdf","size_bytes":297254,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/be0ed0054c2b467fa6c7fdca2aa51c47/download","mirrored":false},{"resource_id":"30625cb4065a457393bccef307e7b0a0","name":"J-4 - Delivery Order 2 - Argon Distribution Uninsulated Pipes Valves SOW (1).pdf","kind":"file","mime_type":".pdf","size_bytes":1546080,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/30625cb4065a457393bccef307e7b0a0/download","mirrored":false},{"resource_id":"cd4a79807d1943e9b1b5a87da820c281","name":"J-4 - Delivery Order 1 - Argon Distribution VJ Pipes Valves SOW (2) (1).pdf","kind":"file","mime_type":".pdf","size_bytes":2053458,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cd4a79807d1943e9b1b5a87da820c281/download","mirrored":false},{"resource_id":"e41342990afb410196063be4edf679f6","name":"J-4 - IDIQ - Argon Distribution Equipment SOW.pdf","kind":"file","mime_type":".pdf","size_bytes":1587817,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e41342990afb410196063be4edf679f6/download","mirrored":false},{"resource_id":"0a4f22ed8e834a3b80a2b9530cdf1406","name":"J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf","kind":"file","mime_type":".pdf","size_bytes":2964644,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0a4f22ed8e834a3b80a2b9530cdf1406/download","mirrored":false},{"resource_id":"555dabdd7fdc494592b5a3f1f24165d6","name":"J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 4 (Rev 2-2018)A.pdf","kind":"file","mime_type":".pdf","size_bytes":307158,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/555dabdd7fdc494592b5a3f1f24165d6/download","mirrored":false},{"resource_id":"c2ea6ac296dd4f9bbc2973dc2d29216a","name":"J-1 General Terms and Conditions - Supplies and Services at SURF 10-23.pdf","kind":"file","mime_type":".pdf","size_bytes":386715,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c2ea6ac296dd4f9bbc2973dc2d29216a/download","mirrored":false},{"resource_id":"4c6251038f224d5bac40145eab038b47","name":"RFP LBNF-355802-JD Final 09-27-2024.pdf","kind":"file","mime_type":".pdf","size_bytes":1167429,"posted_at":"2024-09-28T18:55:40.456Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4c6251038f224d5bac40145eab038b47/download","mirrored":false},{"resource_id":"88125fe7b8a748b4a23d7bbdac75cb0a","name":"J-4 - SOW Appendix B - Instructions for Downloading.docx","kind":"file","mime_type":".docx","size_bytes":147097,"posted_at":"2024-10-07T12:58:31.720Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/88125fe7b8a748b4a23d7bbdac75cb0a/download","mirrored":false},{"resource_id":"38468ca232b24158b685a56e18d76dbc","name":"Amendment 01--RFP LBNF-355802-JD 10-05-2024.pdf","kind":"file","mime_type":".pdf","size_bytes":94511,"posted_at":"2024-10-07T12:58:31.720Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/38468ca232b24158b685a56e18d76dbc/download","mirrored":false},{"resource_id":"f5e4b8dfbc034dd9bd71fc3766572b3a","name":"Amendment 02--RFP LBNF-355802-JD 11-26-2024.pdf","kind":"file","mime_type":".pdf","size_bytes":403063,"posted_at":"2024-11-26T18:15:08.141Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f5e4b8dfbc034dd9bd71fc3766572b3a/download","mirrored":false},{"resource_id":"a4ab81aa5e424716a7c1329b8a5c5bd3","name":"Amendment 03--RFP LBNF-355802-JD_Final.pdf","kind":"file","mime_type":".pdf","size_bytes":231546,"posted_at":"2024-12-12T14:26:49.250Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a4ab81aa5e424716a7c1329b8a5c5bd3/download","mirrored":false},{"resource_id":"589f82ea08c646c0a0b01a36aadf7886","name":"J-2 2025 INSURANCE REQUIREMENTS FOR FFDG SUBCONTRACTED WORK AT SURF Risk category 4 (Rev 01.pdf","kind":"file","mime_type":".pdf","size_bytes":321726,"posted_at":"2025-01-10T19:49:59.182Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/589f82ea08c646c0a0b01a36aadf7886/download","mirrored":false},{"resource_id":"525dcecbfc7341ebbc89b464a3f7d528","name":"J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf","kind":"file","mime_type":".pdf","size_bytes":383167,"posted_at":"2025-01-10T19:49:59.182Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/525dcecbfc7341ebbc89b464a3f7d528/download","mirrored":false},{"resource_id":"3ed70aaf7efa49b59f0010fdc4c41079","name":"Amendment 04--RFP LBNF-355802-JD_Final.pdf","kind":"file","mime_type":".pdf","size_bytes":125815,"posted_at":"2025-01-10T19:49:59.182Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3ed70aaf7efa49b59f0010fdc4c41079/download","mirrored":false},{"resource_id":"4c949fafbab44c68a2dff5ccd399697b","name":"Amendment 05--RFP LBNF-355802-JD.pdf","kind":"file","mime_type":".pdf","size_bytes":97075,"posted_at":"2025-01-17T13:46:35.154Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4c949fafbab44c68a2dff5ccd399697b/download","mirrored":false},{"resource_id":"eea881f169854874a6868406b18e7de2","name":"Amendment 06--RFP LBNF-355802-JD.pdf","kind":"file","mime_type":".pdf","size_bytes":103673,"posted_at":"2025-02-06T20:29:25.215Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/eea881f169854874a6868406b18e7de2/download","mirrored":false}],"awards":[],"related":[{"key":"378854MR","latest_notice_id":"e1f72176eb994530a1340e9bf2a51a91","title":"PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION","solicitation_number":"378854_MR","notice_type":"o","first_type":"o","first_posted":"2026-10-08","last_posted":"2026-11-16","notices":5,"due_at":"2026-12-03T20:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"23822","psc":"K056","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"385439GMK","latest_notice_id":"e17f8904e0134bd890eafbae01571c74","title":"UTILITY EXCAVATION AND REPAIR SERVICES IDIQ","solicitation_number":"385439GMK","notice_type":"o","first_type":"o","first_posted":"2026-11-06","last_posted":"2026-11-06","notices":1,"due_at":"2026-12-07T21:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"238910","psc":"Y1PZ","set_aside":"SBA","state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"},{"key":"RFIVACUUMVESSELS","latest_notice_id":"ea26e0b581dc4104b03163f640a7b274","title":"Request for Information - Vacuum Vessels","solicitation_number":"RFIVacuumVessels","notice_type":"p","first_type":"p","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-07T22:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"332710","psc":"AJ13","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"385515GMK","latest_notice_id":"65747435c0224a859780416b36f2d6bf","title":"Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade","solicitation_number":"385515GMK","notice_type":"o","first_type":"o","first_posted":"2026-10-22","last_posted":"2026-11-11","notices":3,"due_at":"2026-12-09T21:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-09T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"236220","psc":"Z2AZ","set_aside":"SBA","state":"IL","county":"17089","county_name":"Kane County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-12T04:43:37.498412Z"},{"key":"RFP389882","latest_notice_id":"c558db76dbe94287afb9c6eeaa5b8e49","title":"Cryogenic Mezzanine Structure","solicitation_number":"RFP389882","notice_type":"o","first_type":"o","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-11T22:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899034","office_name":"FERMILAB - DOE CONTRACTOR","naics":"33271","psc":"AJ13","set_aside":null,"state":"IL","county":"17089","county_name":"Kane County","city":"1704078","city_name":"Batavia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open":[],"similar_open_total":0,"indexable":false}