Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,517 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation

Design and Fabrication of Ross Ore Hoist Material Conveyance for LBNF / DUNE-US

LBNF-20231213-JD

Department of Energy, Fermilab - DOE Contractor. Conveyor and Conveying Equipment Manufacturing.

Response deadline

January 19, 2024 at 6:00 PM EST

Closed 1041 days ago. Posted January 9, 2024, first published January 9, 2024. Scheduled to archive February 3, 2024.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

This one closed in 2024

1 like it is open now in conveyor and conveying equipment manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333922 (conveyor and conveying equipment manufacturing), means no more than 500 employees, counted with affiliates. What a set-aside is
Time to respond
Bidders had 10 days from the day the solicitation was posted, January 9, 2024, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The Ross Shaft at the Sanford Underground Research Facility (SURF) has undergone a rehabilitation project which has included the complete removal of existing shaft furnishings between set 4 and the shaft bottom at the 5000 Level. In addition to the shaft refurbishment, a new cage and new skips have been installed to meet the personnel, material and waste rock conveyance requirements to operate the shaft for the Long Baseline Neutrino Facility (LBNF).

There is no need for the skips after the excavation is completed and the installation commences. In support of the cryostat and detector installation, the project aims to replace the north skip with a materials transportation conveyance. LBNF is requesting a proposal for design and fabrication of a Ross Ore Hoist Materials Transportation Conveyance with an integrated lifting hoist.

UPDATE: A PRE-PROPOSAL CONFERENCE will be held via Zoom on JANUARY 04, 2024 3:00 PM CST-CHICAGO. SEE AMENDMENT 1 AND RFP SECTION L FOR REGISTRATION INSTRUCTIONS.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 9, 2024

    Solicitation

    Due January 19, 2024 at 6:00 PM EST. SAM.gov, notice 58dcddcdbb1c4d129b3fdcbb5dfd5e5c

  2. January 9, 2024

    Solicitation

    Due January 19, 2024 at 6:00 PM EST. SAM.gov, notice d6b8097b48ae4362945d67c1a947738c

Points of contact