Solicitation
SOFT STARTERS AND ASSOCIATED EQUIPMENT FOR CONDENSER WATER PUMPS (CWP)
JF467262
Department of Energy, Brookhaven Natl Lab -Doe Contractor. Relay and Industrial Control Manufacturing.
Response deadline
August 19, 2025 at 4:00 PM EDT
Closed 463 days ago. Posted August 12, 2025. Scheduled to archive September 3, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
82 like it are open now in relay and industrial control manufacturing
- Programmable Logic Controller System Components
Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor
Combined synopsis and solicitationNAICS 335314Ship to Oak Ridge, TNPR520110Due todayNov 25 - SWITCH,PRESSURE
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 335314Ship to the buyerSPE7M227T0961Due in 3 daysNov 27 - RELAY,ELECTROMAGNETIC
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 335314Ship to the buyerSPE7M527T2925Due in 3 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 335314 (relay and industrial control manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 7 days from the day the solicitation was posted, August 12, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Offeror shall furnish and deliver the parts below in accordance with the attached Request for Quote and associated enclosures. No substitutions. Delivery must be completed by September 30, 2025.
All questions regarding this solicitation shall be emailed to jfamiglie@bnl.gov by 5:00 PM on August 14, 2025. Quotes are due by August 19, 2025 (4: 00 PM EST). It is the Offeror's responsibility to confirm that quotes were received by BNL's Contracts Administrator.
-
Allen-Bradley – Catalog #: 150-F201NBDB – Part #: M1895856
SMC Flex Smart Motor Controller for 201 A, 75–150 HP at 460V AC
Warranty Required: Yes – Quantity: 4 -
Allen-Bradley – Catalog #: 150-F84L – Part #: M5029733
SMC Flex Protective Module
Warranty Required: Yes – Quantity: 4 -
Allen-Bradley – Catalog #: 199-LF1 – Part #: M0009827
Disconnect Terminal Lugs
Warranty Required: Yes – Quantity: 4 -
Allen-Bradley – Catalog #: 20-HIM-A6 – Part #: M3459606
PowerFlex Architecture Class HIM
Warranty Required: Yes – Quantity: 4 -
Allen-Bradley – Catalog #: 1202-H10 – Part #: M4981944
DPI SCANport 1 m HIM Cable
Warranty Required: Yes – Quantity: 4 -
Allen-Bradley – Catalog #: 20-COMM-C – Part #: M0100985
PowerFlex ControlNet Comm Adapter
Warranty Required: Yes – Quantity: 4
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Enclosure F - W-8 Form - For information only.pdf255 KB, August 12, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 12, 2025
Solicitation
Due August 19, 2025 at 4:00 PM EDT. SAM.gov, notice 3e3e482eeeaa44499b813a618b542ed2
1 revision on SAM
- August 12, 2025: publish, solicitation
Points of contact
- Joseph Famigliettijfamiglie@bnl.gov