Sources sought
EVAPCO COOLING TOWER
JBSFB1002
Department of the Air Force, FA3016 502 Cons CL.
Response deadline
August 12, 2025 at 5:30 PM EDT
Closed 470 days ago. Posted July 29, 2025, first published July 28, 2025. Scheduled to archive August 27, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of July 28, 2025. An agency sometimes issues the solicitation under a new number.
Description
As published on SAM.gov.
Joint Base San Antonio has a brand name requirement to procure EVAPCO COOLING TOWER 250 TON, Model ATW 238-3J-2 CLOSED CIRCUIT COOLER, from a singular manufacturer for all current and future renovations of Building 1002 on JBSA-Lackland TX..
EVAPCO Cooling Towers were originally designed and installed on Bldg 1002, the construction period ending in 2002-2003. The system dorms utilize a closed-loop system and only these Evapco Cooling Tower can operate within the buildings existing HVAC system and controls. This specific cooling tower model is required to maintain the building's unique climate control system. Without it, the safety of the military and civilian members in this building are at risk. The system is not compatible with other models. While cooling towers are available, they do not meet the precise specifications of this system, and no other alternative can provide the same functionality.
This will also reduce the total cost of ownership by eliminating inefficiencies and duplication in cost by reducing the need to train the Building maintainers on multiple different systems, and eliminates the need to install a different control system entirely. Standardization will allow maintenance and repair to be done in house as the primary option versus contracting out these services. This specific cooling tower was installed in the building during initial construction and renovation.
Any interested responsible party that believes they could manufacture a cooling tower that is equally or otherwise uniquely capable of meeting the requirements and functions similarlly within the exsiting system should submit a capability statement. You must also submit supporting evidence in sufficient detail to not only demonstrate the ability to fulfill the requirement but also demonstrate that competition would be more advantageous to the Government.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- B1002 Manufacture Spec sheet.pdf466 KB, July 28, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 28, 2025
Sources sought
Due August 12, 2025 at 5:30 PM EDT. SAM.gov, notice 6936c0323d734a4ba8958033a39904a1
2 revisions on SAM
- July 29, 2025: publish, sources sought
- July 28, 2025: publish, sources sought
July 29, 2025
Sources sought
Due August 12, 2025 at 5:30 PM EDT. SAM.gov, notice 49277a47a4114d899ab196c25e7ff3f2
2 revisions on SAM
- July 29, 2025: publish, sources sought
- July 28, 2025: publish, sources sought
Points of contact
- LAURENKALLEN HARPERLaurenkallen.harper.1@us.af.mil