Solicitation, total small business set-aside
MI-65 Transfer Piping
ISD-366397-RO
Department of Energy, Fermilab - DOE Contractor. Fabricated Pipe and Pipe Fitting Manufacturing.
Response deadline
June 10, 2025 at 5:00 PM EDT
Closed 533 days ago. Posted May 30, 2025, first published April 17, 2025. Scheduled to archive June 25, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
72 like it are open now in fabricated pipe and pipe fitting manufacturing
- COUPLING HALF,QUICK DI
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 332996Ship to the buyerSPE7M127Q0191Due tomorrowNov 25 - FITTING,SWIVEL
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 332996Ship to the buyerSPE7M127Q0164Due tomorrowNov 25 - ELBOW,PIPE
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 332996Ship to the buyerSPE7M227Q0065Due in 2 daysNov 26
All 72 open in fabricated pipe and pipe fitting manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 332996 (fabricated pipe and pipe fitting manufacturing), means no more than 550 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 54 days from the day the solicitation was posted, April 17, 2025, to the deadline. The deadline moved once: it was first May 22, 2025 and ended as June 10, 2025.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
You are invited to submit a proposal for the items specified in this Request for Proposal (RFP), by the provisions contained herein, and the terms and conditions of the proposed firm fixed price subcontract entered into as a result of this solicitation.
This is a small business set-aside. The North American Industry Classification System (NAICS) code for this solicitation is 332996, Fabricated Pipe and Pipe Fitting Manufacturing. The small business size standard for this NAICS code is $45.0 Million
A Pre-Proposal Meeting and Site Visit is scheduled for 10:00 A.M, Central Time, May 01, 2025, at Wilson Hall West Entrance Lobby. The meeting provides an opportunity to discuss and clarify the RFP. However, nothing said or represented in the meeting shall be deemed to modify RFP requirements unless followed by a written amendment. Offerors are requested to submit questions relative to the RFP in advance of the meeting so the Procurement Specialist may prepare responses. Offerors’ participation at this meeting is strongly recommended.
Except for those already having a Fermilab Access badge, anyone attending the Pre-Proposal Meeting and Site Visit must fill out an Access Request form (see link below) at least seven (7) days before the scheduled date and preferably be a U.S. Citizen. Onsite access approvals are dependent on citizenship status and the location(s) being visited. In addition, please review the Business Visitor Registration Instruction Instructions and Directions provided as part of the RFP.
https://fermi.servicenowservices.com/expert_shell.do?sysparm_sys_id=63f9f6a8dbd148104e65ff621f 961975.
Upon request approval, the individual will receive an informal invitation letter with a QR code, which is required to be presented at the security gate, otherwise, access to Fermilab will be denied.
When checking in at the Security Gate House, the individual will be required to present a Valid Driver’s License (Real ID) and the informal invitation letter with the QR code, and the Visitor and Business Visitor Attestation Form. If the Driver’s License is not Real ID compliant, one of the appropriate REAL
Page 3 of 9
ID documents (https://www.tsa.gov/travel/security-screening/identification) is required.
Masks are required to be worn when the Community Covid Level of “high” exists. Individuals are then required to wear a KN-95 or N-95 mask. Unfiltered cloth masks are not permitted to be worn alone but can be worn over a Level 2 medical mask (double mask).
Please note that when entering Fermilab:
• No weapons, firearms, or ammunition (regardless of concealed and carry permit) are allowed on-site.
• No explosives or any other apparatus or material hazardous to the public or property are allowed on-site.
• Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.
1.1 Description
The MI-65 transfer piping project shall demolish and rebuild piping that connects two tanks
within the MI-65 service building. The existing piping system consists of double wall PVC piping,
bulk head fittings, valves, and fittings. The new replacement piping system consists of welded
stainless steel piping and flanged valves, constructed to the requirements of ASME B31.3 and
FESHM 5031.1.
1.2 Scope
The subcontractor shall perform the following scope of work to provide FermiForward with a fully
functioning piping system at MI-65.
1.2.1 CONSTRUCTION WORK
The subcontractor shall perform the following work:
1. Demolition of existing double wall PVC Piping connecting the two tanks within MI-65 in
accordance with FermiForward disposal of materials. FermiForward shall inspect
demolished piping prior to disposal.
2. Submission of Welder Qualification Record complying with specification section SS-9-
002, or alternate qualification record meeting or exceeding specification section SS-9-
002.
3. Welding a coupon weld in the presence of FermiForward’s authorized representative.
4. Welding the new piping system with at least 10% of the welds examined by
FermiForward’s authorized representative.
5. Hydrostatically testing the system upon completion of assembly.
1.3 Activities and Timeline
1.3.1 TIMELINE
The subcontractor shall comply with the following timeline:
1. Milestone 0 – 0 Calendar Days – Notice to Proceed (NTP). This milestone marks the
point where construction work may begin;
2. Milestone 1 – 14 Calendar Days – All material submittals;
3. Milestone 2 – 90 Calendar Days – Complete with punch-list items remaining, piping
installed and tested and placed into operations.
4. Milestone 3 – 105 Calendar Days - Project Complete
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Exhibit T - Summary of Required RFP Submittal Documents.pdf181 KB, April 17, 2025
- Exhibit S - Sitemap.pdf800 KB, April 17, 2025
- Exhibit R - Sample Subcontract.pdf191 KB, April 17, 2025
- Exhibit Q - Wage Determination.pdf6.5 MB, April 17, 2025
- Exhibit P - Proposal Certifications Form PUR-466_FFDG.pdf590 KB, April 17, 2025
- Exhibit O - SARC_Subcontractor Annual RepsCerts Rev 4_FFDG.pdf362 KB, April 17, 2025
- Exhibit N - Construction Environmental Safety Health Certification.pdf541 KB, April 17, 2025
- Exhibit M - Fermilab Subcontractor Safety Information Questionnaire.pdf956 KB, April 17, 2025
- Exhibit L - Statement of Acknowledgment (SF-1413).pdf699 KB, April 17, 2025
- Exhibit K - Bond Performance FL-40.pdf743 KB, April 17, 2025
- Exhibit J - Bond Payment FL-42.pdf747 KB, April 17, 2025
- Exhibit I - Bond Bid FL-41.pdf749 KB, April 17, 2025
- Exhibit H - 2025 Construction Insurance Requirements.pdf234 KB, April 17, 2025
- Exhibit G - FFDG General Terms and Conditions for Construction (01.2025).pdf320 KB, April 17, 2025
- Exhibit F - 014100_Quality_Requirements.pdf125 KB, April 17, 2025
- Exhibit E - 013300_Submittals.pdf111 KB, April 17, 2025
- Exhibit D - 013100_ESH_Requirements.pdf1005 KB, April 17, 2025
- Exhibit C - 010010_General_Requirements.pdf445 KB, April 17, 2025
- Exhibit B3 - WELDING PROCEDURE SPECIFICATION.pdf87 KB, April 17, 2025
- Exhibit B2 - Drawings.pdf1.5 MB, April 17, 2025
- Exhibit B1 - Statement of Work - MI-65 Transfer Piping.pdf254 KB, April 17, 2025
- Exhibit A - Price Proposal Form Construction.pdf177 KB, April 17, 2025
- 1. Request for Proposal - Read Me First.pdf250 KB, April 17, 2025
- Amendment 1 - ISD-366397-RO.pdf146 KB, May 21, 2025
- Amendment 2 - ISD-366397-RO.pdf212 KB, May 30, 2025
- MI-65 Transfer Piping _ Addendum 1.pdf1.6 MB, May 30, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 17, 2025
Solicitation
Due May 22, 2025 at 5:00 PM EDT. SAM.gov, notice 05dfe7363b514b1598c140134d07d9c1
3 revisions on SAM
- May 30, 2025: publish, solicitation
- May 21, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
May 21, 2025
Solicitation
Due June 10, 2025 at 5:00 PM EDT. SAM.gov, notice 1ac550ab924144729ccd792b50227cbf
3 revisions on SAM
- May 30, 2025: publish, solicitation
- May 21, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
May 30, 2025
Solicitation
Due June 10, 2025 at 5:00 PM EDT. SAM.gov, notice 4c2c2d99be4d4b2db281d85a6df30f61
3 revisions on SAM
- May 30, 2025: publish, solicitation
- May 21, 2025: publish, solicitation
- April 17, 2025: publish, solicitation
Points of contact
- Ryan O'Sullivanryanosul@fnal.gov6308402402