Solicitation, total small business set-aside
Mu2e Target Air Handling and HEPA System Project
ISD-354744-RO
Department of Energy, Fermilab - DOE Contractor. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
October 22, 2024 at 5:00 PM EDT
Closed 765 days ago. Posted October 1, 2024. Scheduled to archive November 6, 2024.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2024
56 like it are open now in plumbing, heating, and air-conditioning contractors
- Replace Water Tanks FCI Marion Marions, Illinois
Federal Prison System / Bureau of Prisons, Fao
PresolicitationSmall businessNAICS 238220Ship to IL15BGCS26Q00000077Due in 4 daysNov 30 - Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228
Department of Veterans Affairs, 252-Network Contract Office 12
SolicitationSDVOSBNAICS 238220Illinois36C25227Q0059Due in 7 daysDec 3 - FY27 Danville Mechanical MATOC SEED PROJECT NO: 550-26-106, Replace Air Handling Unit B58 at the VA Illiana Health Care System (VIHCS), Danville IL.
Department of Veterans Affairs, 252-Network Contract Office 12
PresolicitationSDVOSBNAICS 238220Illinois36C25227R0002Closes in 19 daysDec 15
All 56 open in plumbing, heating, and air-conditioning contractors
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 21 days from the day the solicitation was posted, October 1, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Subcontractor shall perform all work as described in the Scope of Work entitled “Exhibit E1 & E2 SOW Mu2e Target Air Handling and HEPA System Project”. All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.
A Pre-Proposal Meeting and Site Visit are scheduled for 10:30 AM Central Time, Oct 8, 2024, at Wilson Hall West Lobby Entrance. The meeting provides an opportunity to discuss and clarify the RFP. However, nothing said or represented in the meeting shall be deemed to modify RFP requirements unless followed by a written amendment. Offerors are requested to submit questions relative to the RFP in advance of the meeting so the Procurement Specialist may prepare responses.
Offerors’ participation at this meeting is strongly recommended. Except those already having a badge or being chaperoned, anyone attending the Pre-Proposal Meeting and Site Visit is required to fill out an Access Request form (see link below) at least seven (7) days in advance of the scheduled date and preferably be a U.S. Citizen. Onsite access approvals are dependent on citizenship status and the location(s) being visited.
In addition, please review the Special Pre-Proposal Meeting/Site Visit Instructions and Directions provided as part of the RFP. https://fermi.servicenowservices.com/expert_shell.do?sysparm_sys_id=63f9f6a8dbd148104e65ff621f 961975. Upon request approval, the individual will receive an informal invitation letter with a QR code, which is required to be presented at the security gate, otherwise, access to Fermilab will be denied.
When checking in at the Security Gate House, the individual will be required to present a Valid Driver’s License (Real ID) and the informal invitation letter with the QR code, and the Visitor and Business Visitor Attestation Form. If the Driver’s License is not Real ID compliant, the appropriate REAL ID documents (https://www.tsa.gov/travel/security-screening/identification) are required. If the Covid 19 Community Level is classified as “High,” masks will be required to be worn.
In these cases, KN-95 or N-95 masks are recommended. Unfiltered cloth masks are not permitted to be worn alone but can be worn over a Level 2 medical mask (double mask).
For Covid 19-Commuity Levels, please click on the link, https://eshq.fnal.gov/covid-19-community-levels/ Please note that when entering Fermilab: •No weapons, firearms, or ammunition (regardless of concealed and carry permit) are allowedon-site. •No explosives or any other apparatus or material hazardous to the public or property areallowed on site. •No possession or illegal use of controlled substances or intoxicants or being under theirinfluence are allowable. •Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 1, 2024
Solicitation
Due October 22, 2024 at 5:00 PM EDT. SAM.gov, notice ea845a6bba9e418aa6713c8977ac0fda
Points of contact
- Ryan O'Sullivanryanosul@fnal.gov6308402402