Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,733 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation

A/E MI65 Stack Modifications

ISD-351745-SCM

Department of Energy, Fermilab - DOE Contractor. Engineering Services.

Response deadline

March 15, 2024 at 6:00 PM EDT

Closed 985 days ago. Posted February 16, 2024, first published February 16, 2024. Scheduled to archive March 30, 2024.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

This one closed in 2024

100 like it are open now in engineering services

All 100 open in engineering services

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 541330 (engineering services), means no more than $25.5 million in average annual receipts, counted with affiliates. What a set-aside is
Time to respond
Bidders had 28 days from the day the solicitation was posted, February 16, 2024, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

This task will provide final design construction documents utilizing the results of the study, initial conceptual design summaries and additional information provided herein. All design will adhere to Fermi Radiological Work requirements. This task is best described divided into five subsections:

1. Ground mounted exhaust system consisting of fan, heater and stack for condensate boil-off dispersion; design solutions are covered in the study documents and considered at a 30% design level.

2. Control strategies; design solutions covered in this RFP are currently at a 30% design level.

3. Transformer design and placement; as described at a conceptual design level in this RFP. A 30% submission is required.

4. 15,000 gallon integrated condensate storage system; as described at a conceptual design level in this RFP. A 30% submission is required.

5. Permanent separate building enclosure adjacent to MI-65 to house the condensate storage system; as described at a conceptual design level in this RFP. A 30% submission is required.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 16, 2024

    Solicitation

    Due March 15, 2024 at 6:00 PM EDT. SAM.gov, notice 1909e679b0c74e5b84cd8502fdbab33d

  2. February 16, 2024

    Solicitation

    Due March 15, 2024 at 6:00 PM EDT. SAM.gov, notice 1d74a81e0c3c4cf7a721721f64b6ce67

Points of contact