Solicitation
A/E Electrification Study
ISD-349281-SCM
Department of Energy, Fermilab - DOE Contractor. Engineering Services.
Response deadline
March 8, 2024 at 6:00 PM EST
Closed 992 days ago. Posted February 26, 2024, first published February 12, 2024. Scheduled to archive March 23, 2024.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2024
100 like it are open now in engineering services
- Universal Robotics e-Series Arm
National Aeronautics and Space Administration, NASA Shared Services Center
Combined synopsis and solicitationSmall businessNAICS 541330Ship to CA80NSSC27949205QDue todayNov 25 - Steam Turbine Generator Governor System Replacement
Department of the Navy, NSWC Philadelphia Div
Combined synopsis and solicitationNAICS 541330Philadelphia, PAN64498-26-RFPREQ-PD-44-0191Due todayNov 25 - IDIQ Contract for Architect-Engineer (A-E) Services for Ship Homeporting and Related Operational Issues for Various Locations Throughout the Naval Facilities Engineering Systems Command Atlantic Area of Responsibility and Worldwide
Department of the Navy, Navfacsyscom Atlantic
Sources soughtNAICS 541330Norfolk, VAN62470-27-R-0009Due in 2 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 541330 (engineering services), means no more than $25.5 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 25 days from the day the solicitation was posted, February 12, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
FRA is seeking a qualified firm to conduct a planning level study for the laboratory campus of Fermilab in Batavia, aimed at transitioning its energy infrastructure to fully electric systems. The study will focus on analyzing the feasibility, challenges, and opportunities associated with electrifying the campus, including the replacement of natural gas systems. The study will also evaluate the impact of introducing EV infrastructure.
The overall goal is to optimize energy consumption, enhance energy efficiency, promote energy conservation, and achieve a sustainable, net-zero emissions operation. Please see the attached RFP for more details. AMENDMENT 01 (02/19/2024) The purpose of this amendment is to upload the Terms and Conditions (see attached doc). No other changes were made. AMENDMENT 02 (02/26/2024) The purpose of this modification is to:
1. Remove all language requesting price proposals. This is a request for qualifications.
2. Answer all RFI’s received. See attached Amendment 02 file.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 12, 2024
Solicitation
Due March 8, 2024 at 6:00 PM EST. SAM.gov, notice 5d52f271b7054616a856e0106b2d0971
February 19, 2024
Solicitation
Due March 8, 2024 at 6:00 PM EST. SAM.gov, notice 3d43e6bff62a49f9bf979beb1cd6b3f9
February 26, 2024
Solicitation
Due March 8, 2024 at 6:00 PM EST. SAM.gov, notice f450c6b49ea04d05b7c09a61e6aeb2ca
Points of contact
- Seth Mercilsmercil@fnal.gov4255838207