Solicitation
Static Dissipative Flooring
ISD-348175-SCM
Department of Energy, Fermilab - DOE Contractor. Flooring Contractors.
Response deadline
June 7, 2024 at 6:00 PM EDT
Closed 901 days ago. Posted May 29, 2024, first published May 14, 2024. Scheduled to archive June 22, 2024.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2024
14 like it are open now in flooring contractors
- Flooring Replacement Services CTXVA
Department of Veterans Affairs, 257-Network Contract Office 17
SolicitationSDVOSBNAICS 238330Temple, TX36C25727Q0066Due todayNov 25 - Carpet Installation
Department of the Navy, NAVSUP FLT Log CTR Norfolk
SolicitationNAICS 238330Ship to Norfolk, VAN0018926QL038Due todayNov 25 - Carpet Replacement Building 606
Department of the Air Force, FA5000 673 Cons PKB
Combined synopsis and solicitationSmall businessNAICS 238330Ship to AKFA500027Q0003Due in 5 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238330 (flooring contractors), means no more than $19 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 24 days from the day the solicitation was posted, May 14, 2024, to the deadline. The deadline moved once: it was first May 29, 2024 and ended as June 7, 2024.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
On 5/23/2024, Amendment 01 was added to this solicitation. Please see documents titled, "Amendment 01" & "Floor Pic 1-3." On 5/29/2024, Amendment 02 was added to this solicitation. Minor changes to SOW description and proposal due date extension until 06/07/2024.
Scope of Work: STATIC DISSIPATIVE FLOORING The general scope of this project is to prepare and lay ESD protective epoxy floor in G-WEST (G723) laboratory in the HEERC building (approximately 3,000 sqf). ? Grind and/or shotblast existing surface for proper adhesion of applied product ? Install Dur-A-Flex Dur-A-Gard ESD Primer with copper grounding tape, grounding points provided by others. ? Install Dur-A-Flex ESD Gard ? Install Dur-A-Flex Armor Top ESD urethane ?
Per site visit all existing caulk to remain, installation will terminate at caulk lines ? Installation duration 5-6 days working all areas simultaneously ? Pricing based on open box install if walls have been installed need to see wall plan and/or visit site.
Requirements: ESD protective floor within the range 10^6-10^9 Ohms.
Tasks: 1. Grind existing concrete floor to remove sealer and open up new concrete 2. Honour service trenches and vibration isolation trenches 3. Slope floor to level floor around trenches 4. Prime floor with penetrating moisture tolerant primer 5. Base coat floor with appropriate ESD protective epoxy 6. Lay out copper stripes and ground floor 7. Finish and clean-up floor.
Period of Performance: 30 Days
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 14, 2024
Solicitation
Due May 29, 2024 at 6:00 PM EDT. SAM.gov, notice d20e515dbf0d414ca0377c3d821e3c70
May 23, 2024
Solicitation
Due May 29, 2024 at 6:00 PM EDT. SAM.gov, notice 6f59337751d049369469b9677c72fb9a
May 29, 2024
Solicitation
Due June 7, 2024 at 6:00 PM EDT. SAM.gov, notice 75230612a777413ab4eec3a3da8dc4f5
Points of contact
- Seth Mercilsmercil@fnal.gov4255838207