# Annual Water Softener Service Repairs and Replacements

Canonical: https://sealedbidder.com/opportunities/isd340880ro

- Solicitation number: ISD-340880-RO
- Notice type: Solicitation
- Status: Closed. Deadline was March 12, 2024 at 6:00 PM EDT
- Department: Department of Energy
- Contracting office: Fermilab - DOE Contractor (899034)
- NAICS: 221310 Water Supply and Irrigation Systems
- Product or service code: S114 Water Services
- Set-aside: Total small business set-aside
- Small business size standard: $41 million in average annual receipts (13 CFR 121.201, NAICS 221310)
- Place of performance: Batavia, Illinois
- County: Kane County (FIPS 17089). https://sealedbidder.com/counties/kane-county-il-17089
- City: Batavia. https://sealedbidder.com/cities/batavia-il-1704078
- First posted: February 26, 2024
- Last posted: February 26, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/1cc3bf2de13940fa89db1ffe6f64887c/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 221310 (water supply and irrigation systems), means no more than $41 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 15 days from the day the solicitation was posted, February 26, 2024, to the deadline.

## Description

**1. Background:** All domes?c water at the Fermi Na?onal Accelerator Laboratory (Fermilab) site is supplied by the City of Warrenville. The domes?c water then travels through nearly 21 miles of piping to reach its eventual des?na?on. The result is “hard” water that requires treatment by water so?ening units installed throughout the Fermilab property.

A total of thirty-two (32) water so?eners (see Atachment 1, Water So?ener Loca?ons) are installed at mul?ple loca?ons to assist in so?ening the water to prepare it for a variety of applica?ons. So? water is important to certain buildings and laboratories as it is used for humidifiers and cooling for computer centers. Hard water can calcify and clog orifices, causing damage to computer banks.

So? water is also required for various processes in experiments, loop systems, regenera?on for LCW applica?ons, and dish washing. Preventa?ve maintenance is performed by Fermi Research Alliance (FRA) site mechanics. Correc?ve maintenance and/or replacement of these units is beyond the scope of site maintenance’s exper?se. FRA is in need of a subcontractor to be responsible for all correc?ve maintenance and/or replacement of the site’s water so?ener units as the needs are iden?fied. The subcontractor would also perform installa?on of new units in loca?ons determined appropriate by FRA.

2. Scope of Work 2.1. All work will be scheduled by FRA contac?ng the Subcontractor to set an agreeable ?me and date. 2.2. All work will be performed at the Fermilab site in Batavia, Illinois. 2.3. The subcontractor shall provide all labor, material, and supervision necessary to perform correc?ve maintenance and replacement of all water so?ener units at the Fermilab site (see Atachment 1, Water So?ener Loca?ons). 2.4.

The subcontractor shall provide all labor, material, and supervision necessary to perform installa?on of new water so?ener units as directed by FRA. 2.5. Perform repairs / correc?ve maintenance of non-func?oning / malfunc?oning water so?eners. 2.5.1. Examples of correc?ve maintenance may include:

broken / cracked tubes, malfunc?oning tank float, replacement or repair of check valves, repair of damage to external so?ener body, repair or replacement of flow valves, failure of electronic flowmeter or other electronic parts, and other maintenance items outside of the technical ability of in house maintenance technicians as determined by FRA. 2.5.2. Subcontractor will perform an inspec?on to diagnose issues and provide a quote prior to ordering parts and materials needed for repair. 2.6.

Replace water so?ener units when they cannot be repaired. 2.6.1. Replacement may be required due to end of life, gross failure of a unit, or when correc?ve maintenance costs would exceed the costs of a new unit. 2.6.2. Subcontractor will perform an inspec?on to diagnose issues and provide a quote prior to ordering parts and materials needed for replacement. 2.7. Procure and install new water so?ener systems at new loca?ons when requested by FRA personnel. 2.7.1. Subcontractor will provide a quote prior to ordering parts and materials needed for installa?on of new units.

## Open now in the same industry

6 open in NAICS 221310.

- Re-Activation of Snake River Water Pump (FA489727Q0004), due November 30, 2026 at 12:00 PM EST. https://sealedbidder.com/opportunities/fa489727q0004
- Water Treatment Chemicals, Testing, Monitoring, and Reporting- Sources Sought Notice / Request for Information (15B70027PR000089), due December 3, 2026 at 11:00 AM EST. https://sealedbidder.com/opportunities/15b70027pr000089
- Reverse Osmosis, Deionization Equipment and PE Water Softene 2026-2027 (36C26227Q0106), due December 4, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/36c26227q0106

## Publications

- February 26, 2024: Solicitation, due March 12, 2024 at 6:00 PM EDT. Notice 1cc3bf2de13940fa89db1ffe6f64887c. https://sam.gov/workspace/contract/opp/1cc3bf2de13940fa89db1ffe6f64887c/view

## Points of contact

- Ryan O'Sullivan, ryanosul@fnal.gov, 6308402402

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/isd340880ro.
