Combined synopsis and solicitation
Odyssey Split System
IO458794
Department of Energy, Brookhaven Natl Lab -Doe Contractor. Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing.
Response deadline
January 20, 2025 at 4:00 PM EST
Closed 674 days ago. Posted January 10, 2025. Scheduled to archive February 4, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
25 like it are open now in air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment manufacturing
- FILTER ELEMENT,AIR CON
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 333415Ship to the buyerSPE8E827Q0072Due tomorrowNov 25 - POWER,BREEZER
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 333415Ship to the buyerSPE8E727Q0025Due tomorrowNov 25 - FILTER ELEMENT,AIR CON
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 333415Ship to the buyerSPE8E827Q0071Due tomorrowNov 25
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333415 (air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 10 days from the day the solicitation was posted, January 10, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Items only, no instal needed.
Quantity 3 of:
Odyssey Split System Indoor Unit Item:
A1 Tag(s): A5, A5-1, A5-2 Air Handler 7.5 Ton R-454B Refrigerant 460/60/3 Dual Circuit Generation B (208-230, 460, 575v) SZVAV (not for 24V t-stat control) High Static - oversized motor for vfd No Auxiliary Heat 2" MERV 13 FILTER (Field Installed) Duct Flange Kit (Field Installed) Discharge plenum & grille (Field Installed) Return air grille (Field Installed) Subbase (Field Installed) 1st Year Labor Warranty Whole Unit.
Odyssey Split System Outdoor Unit Item:
B1 Tag(s): B5, B5-1, B5-2 Cooling (TTA) 7.5 Tons R-454B Refrigerant460/60/3 Dual Compressors / Dual Circuit Generation B (208-230, 460, 575v) Symbio (Cooling) STD Coil w/ Guards Advanced Controller - BACnet BAS (TTA) Pivot Smart Thermostat-Electomechanical (Field Installed) Ext. mount Small cabinets (Symbio) (Field Installed) Pressure Transducer for ICM (Field Installed) 1st Year Labor Warranty Whole Unit System Not Included Notes: • BMS Integration, BACNet Card, Any Heat, Hot Gas Reheat Dehumidification, Wiring, Condensate Sensors or Pumps, Mixing Boxes, Startup Assistance
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 10, 2025
Combined synopsis and solicitation
Due January 20, 2025 at 4:00 PM EST. SAM.gov, notice 3bdf6d2c3723434f859e3b2ffa4e9bfb
Points of contact
- ILDIKO ORLANDOIORLANDO@BNL.GOV6343446261