Solicitation
Tyndall AFB, Florida - HVAC and MCC Replacement
GNFR-FC-TYN-26-26340
Army Air Force Exchange Service, PZ - K Ofc of DIR-PROCU 1018572. Construction.
Response deadline
June 12, 2026 at 3:00 PM EDT
Closed 166 days ago. Posted June 1, 2026, first published May 6, 2026. Scheduled to archive June 13, 2026.
Get the next one like this from Army Air Force Exchange Service by email, the day it is posted.Find my opportunities
This one closed in 2026
3 like it are open now in construction
- Craft Labor and Corrosion Control Services
National Aeronautics and Space Administration, NASA Kennedy Space Center
Sources soughtNAICS 23Titusville, FL80KSC027R0008Closes in 22 daysDec 17 - Schofield Barracks, HI - Care Care Center w/Gas Express Image Update (SB80)
Army Air Force Exchange Service, PZ - K Ofc of DIR-PROCU 1018572
SolicitationNAICS 23Schofield Barracks, HIGNFR-FC-SCH-26-27662Closes in 8 daysDec 3 - Non-Complex Construction and Design Build Construction, Basic Ordering Agreement RAF Lakenheath, Suffolk
Department of the Air Force, FA5587 48 Cons (Admin Only No Req)
Sources soughtNAICS 23Outside the USFA558723GXXXXCloses in 805 daysFeb 7, 2029
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. What a set-aside is
- Time to respond
- Bidders had 37 days from the day the solicitation was posted, May 6, 2026, to the deadline. The deadline moved once: it was first June 5, 2026 and ended as June 12, 2026.
Description
As published on SAM.gov.
Solicitation Number: GNFR-FC-TYN-26-26340
Tyndall AFB, Florida - HVAC and MCC Replacement
Project Number: 3784-26-000002
This project includes replacement of all HVAC equipment with a newly configured system, adding new equipment space to enable housing of new mechanical equipment with sufficient space to comply with latest UFCs. Certain independent units will be consolidated into new centralized system capacity once new floor space is established. The control system of all BX and mall area replaced equipment will be via new Siemens Design (replacing the existing Siemens and older components) and report to the Tyndall COMM building via fiber link. The construction is anticipated to be a one-year contract, to be awarded in FY2026, and constructed in 2026-2027 (Subject to the availability of funds), and the building must remain in operation as much as practicable during the construction period. There is anticipated to be ceiling and interior repairs associated with the project, along with potential minor structural modifications needed to accommodate the new units, and those costs are covered in the estimate. The whole system will be tested and balanced per the contract documents.
In order to participate in this solicitation, please refer to the link provided below. All solicitation documents will be posted on our website. Any and all amendments will be posted on our website, and must be acknowledged, when submitting a proposal.
https://odin.aafes.com/ConstructionSolicitations/
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 6, 2026
Solicitation
Due June 5, 2026 at 3:00 PM EDT. SAM.gov, notice c6bf592603a44a0eaf130ad35cdd1470
2 revisions on SAM
- June 1, 2026: publish, solicitation
- May 6, 2026: publish, solicitation
June 1, 2026
Solicitation
Due June 12, 2026 at 3:00 PM EDT. SAM.gov, notice fcd3e3775cc145ffb9f8a099899ddf9b