Presolicitation, hubzone sole source
FTQW 23-1401 Repair Lift Station B2212
FTQW_23-1401_Repair_Lift_Station_B2212
Department of the Air Force, FA5004 354 Cons PK. Industrial Building Construction.
Response deadline
May 18, 2025 at 6:00 PM EDT
Closed 558 days ago. Posted May 2, 2025. Scheduled to archive May 19, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
6 like it are open now in industrial building construction
- IE181 - WHS Greenhouse Construction
Bureau of Indian Affairs, Indian Education Acquisition Office
SolicitationIndian small businessNAICS 236210Fort Wingate, NM140A2327Q0297Due in 3 daysNov 30 - Multiple Award Construction Contract (MACC)
Department of the Air Force, FA7060 11TH Contracting SQ PK
Sources soughtNAICS 236210District of ColumbiaFA706027RXXX2Due in 3 daysNov 30 - Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Department of the Air Force, FA8137 AFSC Pzioc
Due in 6 daysDec 3
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- HUBZone sole source. Awarded to one HUBZone firm without competition. Small, under NAICS 236210 (industrial building construction), means no more than $45 million in average annual receipts, counted with affiliates. Open HUBZone sole source opportunities
- What comes next
- No solicitation was published under this number after the presolicitation of May 2, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This Synopsis describes the Government’s requirement for construction of a new bypass lift station
at Eielson AFB, which is located approximately 23.0 miles southeast of Fairbanks, Alaska.
Work shall include but is not limited to the installation of a new fiberglass wet well, two 15hp
pumps, two actuating valves and a bypass line leading to the new wet well. A utilidor addition
shall be constructed and shall include an access hatch at grade. Due to the shallow water table and
groundwater contamination, the fiber glass lift station basin will be installed on tremie slabs
surrounded by secant pile walls. The new lift station shall be programmed in such a way as to
alternate use with the existing lift station at B2212. Electric heat tape shall be installed around all
new piping. The existing service breaker and generator breaker shall be replaced. The site shall be
regraded to allow for proper drainage and any disturbed areas shall be repaired to match existing
conditions.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 2, 2025
Presolicitation
Due May 18, 2025 at 6:00 PM EDT. SAM.gov, notice 2ef7647423a142d7b278817d27b976cb
1 revision on SAM
- May 2, 2025: publish, presolicitation
Points of contact
- Ryan Smith354CONS.PKA.MonitorConstruction@us.af.mil9073777348
- Kristen Denlinger354CONS.PKA.MonitorConstruction@us.af.mil9073777342