Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,734 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Sources sought, total small business set-aside

Repair Purple Heart Drive Pavement - Dover AFB

FJXT210039

Department of the Air Force, FA4497 436 Cons LGC. Highway, Street, and Bridge Construction.

Response deadline

September 30, 2024 at 2:00 PM EDT

Closed 786 days ago. Posted September 16, 2024. Scheduled to archive October 15, 2024.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2024

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
What comes next
No solicitation was published under this number after the sources sought of September 16, 2024. An agency sometimes issues the solicitation under a new number.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

This product consists of the contractor providing all labor, materials, tools, equipment, and performing all work necessary for the Repair of Purple Heart Drive Pavement include all mobilization, safety, labor, materials, and equipment, clean up, disposal and demobilization by order of priority as detailed below:

1. SCOPE 1.1 OBJECTIVE: The Contractor shall provide all labor, materials, tools, equipment, and performing all work necessary for the Repair of Purple Heart Drive Pavement include all mobilization, safety, labor, materials, and equipment, clean up, disposal and demobilization by order of priority.

1.2 PERIOD OF PERFORMANCE: Total period of performance (POP) for this project is 104 days (negotiable prior to award) from the date of the Notice to Proceed (NTP). The POP shall be agreed upon prior to contract award.

1.3 LIMITATIONS: All work shall be coordinated with Base Civil Engineering and Building Manager adjacent to the street, as necessary.

1.4 LOCATION: The primary location of this project is base-wide on Dover Air Force Base located in Kent County the city of Dover Delaware.

1.5 DESCRIPTION OF WORK:

a. Mill 25,477 SY-IN of roadway for Sections 40 and 70 indicated on the attached sketch.

b. Section 70 marked “Mill & Overlay” shall be milled to a depth of 2 inches and Section 40 marked “Reconstruct” shall be milled to remove the complete asphalt surface (Depth= 2.5 inches). In addition, 2 major cutbacks shall be milled to a depth of 1.5 inches (Cutback 1 at Building 270 in Section 70 = 47’X32; Cutback 2 at Fire Station in Section 40 = 140X100).

c. Section 40 pavement section is currently inadequate. Please see attached sketch showing the existing pavement section and the proposed pavement section. To facilitate the new pavement section, the contractor shall taper (by removing portions of the underlying GABC base course) the GABC base course to allow for a 5-inch reveal on the gutter pan concrete. The GABC base course shall be leveled to provide a consistent slope from the bottom of the gutter pan reveal to the roadway center crown.

d. Immediately following GABC removal, the contractor shall perform compaction tests over the entire 3 Section 40 surface to determine areas that do not meet the minimum 95% proctor compaction requirement. Areas not meeting specifications shall have the GABC removed, subgrade compacted to 95%, GABC replaced and tested in NGT 6-inch lifts to match existing GABC depth. The entire shall base course shall be recompacted to achieve 95% overall compaction.

e. Sawcut all transverse butt joints and adjacent pavement-to-remain areas to a depth of 2 inches.

f. Pave base course of Section 40 with 3-inches PG 76-22 DelDOT “B Mix” asphalt.

g. Pave wearing course of Section 40 and Section 70 with 2-inches PG 76-22 DelDOT “C Mix” asphalt.

h. Stripe 2250 LF of 4-inch-wide line striping. Repaint all crosswalk and hold line markings.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 16, 2024

    Sources sought

    Due September 30, 2024 at 2:00 PM EDT. SAM.gov, notice 70421bca7ad54fdba14d43d4b0e7127d

Points of contact