Repair Purple Heart Drive Pavement - Dover AFB
FJXT210039
Department of the Air Force, FA4497 436 Cons LGC. Highway, Street, and Bridge Construction.
Response deadline
September 30, 2024 at 2:00 PM EDT
Closed 786 days ago. Posted September 16, 2024. Scheduled to archive October 15, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
36 like it are open now in highway, street, and bridge construction
- FY27 Airfield Striping and Rubber Removal
Department of the Air Force, 436 Cons Lgca
Sources soughtSmall businessNAICS 237310DelawareFA449727DOVERAIRFIELDDue in 7 daysDec 2 - AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due in 2 daysNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 5 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation was published under this number after the sources sought of September 16, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This product consists of the contractor providing all labor, materials, tools, equipment, and performing all work necessary for the Repair of Purple Heart Drive Pavement include all mobilization, safety, labor, materials, and equipment, clean up, disposal and demobilization by order of priority as detailed below:
1. SCOPE 1.1 OBJECTIVE: The Contractor shall provide all labor, materials, tools, equipment, and performing all work necessary for the Repair of Purple Heart Drive Pavement include all mobilization, safety, labor, materials, and equipment, clean up, disposal and demobilization by order of priority.
1.2 PERIOD OF PERFORMANCE: Total period of performance (POP) for this project is 104 days (negotiable prior to award) from the date of the Notice to Proceed (NTP). The POP shall be agreed upon prior to contract award.
1.3 LIMITATIONS: All work shall be coordinated with Base Civil Engineering and Building Manager adjacent to the street, as necessary.
1.4 LOCATION: The primary location of this project is base-wide on Dover Air Force Base located in Kent County the city of Dover Delaware.
1.5 DESCRIPTION OF WORK:
a. Mill 25,477 SY-IN of roadway for Sections 40 and 70 indicated on the attached sketch.
b. Section 70 marked “Mill & Overlay” shall be milled to a depth of 2 inches and Section 40 marked “Reconstruct” shall be milled to remove the complete asphalt surface (Depth= 2.5 inches). In addition, 2 major cutbacks shall be milled to a depth of 1.5 inches (Cutback 1 at Building 270 in Section 70 = 47’X32; Cutback 2 at Fire Station in Section 40 = 140X100).
c. Section 40 pavement section is currently inadequate. Please see attached sketch showing the existing pavement section and the proposed pavement section. To facilitate the new pavement section, the contractor shall taper (by removing portions of the underlying GABC base course) the GABC base course to allow for a 5-inch reveal on the gutter pan concrete. The GABC base course shall be leveled to provide a consistent slope from the bottom of the gutter pan reveal to the roadway center crown.
d. Immediately following GABC removal, the contractor shall perform compaction tests over the entire 3 Section 40 surface to determine areas that do not meet the minimum 95% proctor compaction requirement. Areas not meeting specifications shall have the GABC removed, subgrade compacted to 95%, GABC replaced and tested in NGT 6-inch lifts to match existing GABC depth. The entire shall base course shall be recompacted to achieve 95% overall compaction.
e. Sawcut all transverse butt joints and adjacent pavement-to-remain areas to a depth of 2 inches.
f. Pave base course of Section 40 with 3-inches PG 76-22 DelDOT “B Mix” asphalt.
g. Pave wearing course of Section 40 and Section 70 with 2-inches PG 76-22 DelDOT “C Mix” asphalt.
h. Stripe 2250 LF of 4-inch-wide line striping. Repaint all crosswalk and hold line markings.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 16, 2024
Sources sought
Due September 30, 2024 at 2:00 PM EDT. SAM.gov, notice 70421bca7ad54fdba14d43d4b0e7127d