Special notice
Repair of a damaged Basic Expeditionary Airfield Resources (BEAR) Power Unit (BPU)
FF3N0613339A001
Department of the Air Force, FA5613 700 Cons PK. Motor and Generator Manufacturing.
Response deadline
February 27, 2024 at 8:00 AM EST
Closed 1002 days ago. Posted February 14, 2024. Scheduled to archive March 13, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
65 like it are open now in motor and generator manufacturing
- MOTOR,DIRECT CURRENT
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationNAICS 335312Ship to the buyerSPE4A527T3459Due tomorrowNov 25 - CONDITIONER,POWER L
Defense Logistics Agency, Sprmm1 DLA Mechanicsburg
SolicitationNAICS 335312Ship to the buyerSPRMM127QKA05Due in 2 daysNov 27 - MOTOR,ALTERNATING C
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 335312Ship to the buyerN0010427QLA15Due in 2 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
Cummins is the sole manufacturer of the BPU (BEAR Power Unit). They have access to programs specifically designed to run tests on their generators that no other company has access to. It can run on multiple fuels (JP-8, JP-5, Jet A, DF 1,2), operate in wide temperature range and delivers excellent power quality. DQBPU is an integrated power options in a mobile configuration, with reliable and stable power. Repair of a damaged Basic Expeditionary Airfield Resources (BEAR) Power Unit (BPU).
The DQBPU is designed for BEAR. It uses military Power Command Control and offers significant operational advantages for all military services. The BEAR Power Unit is one of USAFE's most highly tasked BEAR Unit Type Codes. Historically, the BPU has been tasked to areas such as Air Base 201 in Niger, Kunsan Ab Korea, and many different NATO exercises in the European theater. This $900K generator can provide vital primary power requirements to bed-down sites downrange as well as back up for critical facilities.
The generator cannot be repaired locally or by Air force personnel and must be repaired by the manufacturer, Cummins. The Front axle of the BPU needs complete replacement. Radiator Cores need complete replacement due to damage and leaks. Front/Left/Bottom panels need to be replaced. The trailer has to be completely replaced. After all repairs are made, a complete test of the BPU needs to be accomplished to ensure everything runs safely and correctly.
A fully mobile and operational BPU is required to meet the mission requirement. If the work is not performed, it will not be repaired and will amount to a loss of Air Force assets and degrade readiness for USAFE's and the 86 MMS's mission in providing mission ready War Reserve Mater. For detailed information, see damage report attached.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 14, 2024
Special notice
Due February 27, 2024 at 8:00 AM EST. SAM.gov, notice d01537d75e644c52ae4f9129ddae3921
Points of contact
- Svetlana AllendorfSvetlana.Allendorf.ru@us.af.mil011496315366885
- Jennifer Arnettjennifer.arnett.1@us.af.mil