Sources sought
Request for Information (RFI), Repair of the C-5 Avionics Regulated Transformer Rectifier Unit (RTRU) 275 AMP & 400 AMP
FD2060-24-00368
Department of the Air Force, FA8538 AFSC Pzaab. Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing.
Response deadline
March 10, 2024 at 6:00 PM EDT
Closed 992 days ago. Posted February 9, 2024. Scheduled to archive March 25, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
77 like it are open now in capacitor, resistor, coil, transformer, and other inductor manufacturing
- RESISTOR,THERMAL
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 334416Ship to the buyerSPE7M127U1193Due tomorrowNov 27 - RESISTOR,VARIABLE,NONW
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 334416Ship to the buyerSPE7M527T2885Due tomorrowNov 27 - RESISTOR,THERMAL
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 334416Ship to the buyerSPE7M527T2869Due tomorrowNov 27
All 77 open in capacitor, resistor, coil, transformer, and other inductor manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 334416 (capacitor, resistor, coil, transformer, and other inductor manufacturing), means no more than 550 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of February 9, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
REQUEST FOR INFORMATION Repair of the C-5 Avionics Regulated Transformer Rectifier Unit (RTRU) 275 AMP & 400 AMP The Government is conducting market research to identify potential sources that possess the expertise, capabilities, and experience to meet qualification requirements to provide depot-level testing and repair of the C-5 Avionics Regulated Transformer Rectifier Unit (RTRU) 275 AMP & 400 AMP. The National Stock Numbers (NSN) and Part Numbers (PN) are as follows:
NOUN:
REG TRANSFORMER RECTIFIER UNIT 400A NSN:
6120015249044UC P/N:
716340-1 NOUN:
REG TRANSFORMER RECTIFIER UNIT 275A NSN:
6120015003393UC P/N: 716010-1 The service shall include providing obsolete parts resolution along with the necessary engineering to investigate Deficiency Reports and Material Improvement Projects (MIPs). The RTRU must meet form, fit, function, and interface requirements of the specified part numbers as referenced in T.O. 1C-5M-4-6. The Government does not own the complete data or the rights to the data needed to compete the repair of this part.
The depot-level testing and repair of the RTRU 275 AMP & 400 AMP require special test equipment to determine and maintain quality for its function or system integrity. Substantiation and inspection of the precision or quality cannot be accomplished without such specialized test equipment or inspection facilities. No samples are available for potential suppliers to evaluate.
The Regulated Transformer Rectifier Unit (RTRU) 275 AMP & 400 AMP on the C-5 Galaxy Avionics provide regulated +28 Volts Direct Current (VDC), 275A/400A maximum, output power that is developed from a 115 Volts Alternating Current (VAC), 400 Hertz (Hz), 3-phase input. The voltage output of the RTRU is regulated by a control loop which senses the output voltage for feedback.
The feed-back signal controls a Pulse Width Modulator (PWM), which in turn provides transformer drive signals to regulate the amplitude and limit the current of the output power. Contractor shall furnish all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility.
Contractor furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey. PLEASE VIEW FULL DOCUMENT ATTACHED BELOW.
THIS IS A REQUEST FOR INFORMATION ONLY---
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 9, 2024
Sources sought
Due March 10, 2024 at 6:00 PM EDT. SAM.gov, notice 44abd64581984155b8fe3a23b46742f5
Points of contact
- Rebecca Lopezrebecca.lopez.4@us.af.mil
- Lauren Mitchelllauren.mitchell.6@us.af.mil