{"canonical":"https://sealedbidder.com/opportunities/fa875125b0002","key":"FA875125B0002","url":"https://sealedbidder.com/opportunities/fa875125b0002","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-05-06T18:00:00Z","first_posted":"2025-03-06","last_posted":"2025-07-01","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE AIR FORCE","office":"FA8751 AFRL RIKO","naics":"236220","psc":"Y1NB","set_aside":"SBA","place_state":"NY","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"36065","place_county_name":"Oneida County","place_city":"3663418","place_city_name":"Rome","winner":"FOUR TRIBES CIVIL CONSTRUCTION LLC","award_amount":"7097304.39","publications":[{"notice_id":"8366557925864cc19dc3b2271f81a508","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"p","base_type":"p","posted":"2025-03-06","posted_at":"2025-03-06T14:14:58.501Z","due_at":"2025-03-21T19:00:00Z","due_date":"2025-03-21","cancelled":false,"archived":true,"archive_date":"2025-04-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8366557925864cc19dc3b2271f81a508/view","enriched":true,"history":[{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"32529e0716344ca1b9a7ea87a2981ae5","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"o","base_type":"p","posted":"2025-03-31","posted_at":"2025-03-31T19:54:34.104Z","due_at":"2025-04-30T18:00:00Z","due_date":"2025-04-30","cancelled":false,"archived":true,"archive_date":"2025-05-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/32529e0716344ca1b9a7ea87a2981ae5/view","enriched":true,"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"o","base_type":"o","posted":"2025-04-11","posted_at":"2025-04-11T18:12:49.665Z","due_at":"2025-04-30T18:00:00Z","due_date":"2025-04-30","cancelled":false,"archived":true,"archive_date":"2025-05-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a4d0763f4d3b4e5ea9860011a10ebaf3/view","enriched":true,"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"efb6079a7d5a416e85450b15d8beb238","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"o","base_type":"o","posted":"2025-04-17","posted_at":"2025-04-17T18:59:32.398Z","due_at":"2025-04-30T18:00:00Z","due_date":"2025-04-30","cancelled":false,"archived":true,"archive_date":"2025-05-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/efb6079a7d5a416e85450b15d8beb238/view","enriched":true,"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"5958c8bd5f9641348305f93df283e9ec","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"o","base_type":"o","posted":"2025-04-18","posted_at":"2025-04-18T16:35:06.050Z","due_at":"2025-04-30T18:00:00Z","due_date":"2025-04-30","cancelled":false,"archived":true,"archive_date":"2025-05-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5958c8bd5f9641348305f93df283e9ec/view","enriched":true,"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"97792dbe1bb04bf288f614ae4e9992e8","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"o","base_type":"o","posted":"2025-04-24","posted_at":"2025-04-24T19:14:47.743Z","due_at":"2025-04-30T18:00:00Z","due_date":"2025-04-30","cancelled":false,"archived":true,"archive_date":"2025-05-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/97792dbe1bb04bf288f614ae4e9992e8/view","enriched":true,"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"dc6a4da98996470a86015f75121f2ebd","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"o","base_type":"o","posted":"2025-04-28","posted_at":"2025-04-28T18:37:29.398Z","due_at":"2025-04-30T18:00:00Z","due_date":"2025-04-30","cancelled":false,"archived":true,"archive_date":"2025-05-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/dc6a4da98996470a86015f75121f2ebd/view","enriched":true,"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"e713741b1ad14bb9920293b8fadbdbb7","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"o","base_type":"o","posted":"2025-04-28","posted_at":"2025-04-28T18:42:15.169Z","due_at":"2025-04-30T18:00:00Z","due_date":"2025-04-30","cancelled":false,"archived":true,"archive_date":"2025-05-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e713741b1ad14bb9920293b8fadbdbb7/view","enriched":true,"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"o","base_type":"o","posted":"2025-04-28","posted_at":"2025-04-28T18:36:09.689Z","due_at":"2025-04-30T18:00:00Z","due_date":"2025-04-30","cancelled":false,"archived":true,"archive_date":"2025-05-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fc51a67dcfe84cbfa9185ba90ff52ea0/view","enriched":true,"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"99717a7c6f714e49bb121b83ef93e0cd","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"o","base_type":"o","posted":"2025-04-30","posted_at":"2025-04-30T15:18:26.613Z","due_at":"2025-05-06T18:00:00Z","due_date":"2025-05-06","cancelled":false,"archived":true,"archive_date":"2025-05-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/99717a7c6f714e49bb121b83ef93e0cd/view","enriched":true,"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"e510eac8dd494bf5b3b286fdc75b4cd6","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125B0002","notice_type":"o","base_type":"o","posted":"2025-04-30","posted_at":"2025-04-30T19:02:53.545Z","due_at":"2025-05-06T18:00:00Z","due_date":"2025-05-06","cancelled":false,"archived":true,"archive_date":"2025-05-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e510eac8dd494bf5b3b286fdc75b4cd6/view","enriched":true,"history":[{"index":17,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T13:08:21.565Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"d7495efa567545b08979f26dbc0cf305","solicitation_number":"FA875125C0004","related_opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6"},{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]},{"notice_id":"d7495efa567545b08979f26dbc0cf305","title":"Install Boilers, Building 2 and Building 3","solicitation_number":"FA875125C0004","notice_type":"a","base_type":"o","posted":"2025-07-01","posted_at":"2025-07-01T13:08:21.565Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-07-16","removed_at":null,"award_number":"FA875125C0004","awardee_name":"FOUR TRIBES CIVIL CONSTRUCTION LLC","amount":"7097304.39","link_sam":"https://sam.gov/workspace/contract/opp/d7495efa567545b08979f26dbc0cf305/view","enriched":true,"history":[{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T13:08:21.565Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"d7495efa567545b08979f26dbc0cf305","solicitation_number":"FA875125C0004","related_opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}]}],"latest_notice_id":"d7495efa567545b08979f26dbc0cf305","first_type":"p","notices":[{"dates":{"posted":"2025-03-06","posted_at":"2025-03-06T14:14:58.501Z","created_at":"2025-03-06T13:59:38.672Z","modified_at":"2025-04-06T04:00:10.910Z","response_deadline":{"raw":"2025-03-21T15:00:00-04:00","utc":"2025-03-21T19:00:00Z","date":"2025-03-21","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8366557925864cc19dc3b2271f81a508/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-05","archive_type":"auto15"},"history":[{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"8366557925864cc19dc3b2271f81a508","lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-21T02:28:33.143485301Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a794a9f00e15816a87ef1c9dc571e9dc460b1176605f152d721b1722ca736a04","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-21T02:28:33.143485301Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong>General Information</strong></p>\n\n<p></p>\n\n<p>Document Type:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Pre-Solicitation notice for the Installation of New Steam Boilers in Building 2 and Building 3</p>\n\n<p>Solicitation Number:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; FA875125B0002</p>\n\n<p>Posted Date:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 6 March 2025</p>\n\n<p>Response Date:&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 21 March 2025</p>\n\n<p>Classification Code: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Y1NB- Construction of Heating and Cooling Plants</p>\n\n<p>NAICS Code: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 236220 Commercial and Institutional Building Construction</p>\n\n<p>Set Aside:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 100% Small Business</p>\n\n<p></p>\n\n<p></p>\n\n<p>CONTRACTING OFFICE ADDRESS</p>\n\n<p></p>\n\n<p>AFRL/RIKO Specialized Acquisition &amp; Operational Contracting, Department of the Air Force, Air Force Materiel Command, AFRL &ndash; Rome Research Site, AFRL/Information Directorate 26 Electronic Parkway, Rome, NY, 13441-45</p>\n\n<p></p>\n\n<p><strong>Description:</strong></p>\n\n<p></p>\n\n<p>Install steam boilers in building 2 and building 3.</p>\n\n<p></p>\n\n<p>The contractor shall furnish all labor, equipment, devices and materials and perform all work in accordance with the Technical Specifications and Drawings at the Air Force Research Site, Located in Rome, NY.</p>\n\n<p></p>\n\n<p>The work to be performed includes but is not limited to the following:&nbsp; General Construction, Fire Protection, Plumbing, Mechanical, Electrical, and incidental related work. &nbsp;The contractor shall comply with applicable federal, regional, state, and local laws and commercial standards.</p>\n\n<p></p>\n\n<p>The work will be performed in accordance with the B2 Technical Specifications (Attachment 1), dated 12 August 2024, B2 Drawings (Attachment 2), dated 12 August 2024 and Proposed Sump Pump Piping Addendum (Attachment 3), B3 Technical Specifications (Attachment 4), dated 17 December 2024, B3 Drawings (Attachment 5), dated 17 December 2024.</p>\n\n<p></p>\n\n<p>This acquisition will be a 100% Small Business Set-Aside IAW FAR 19.5. The applicable NAICS code is 236220 with an associated small business size standard of $45,000,000 average annual revenue.</p>\n\n<p></p>\n\n<p>The estimated magnitude of construction is between $5,000,000 and $10,000,000. Bidders must provide payment and performance bonding in the amount of its bid. A Bid guarantee in the amount of 20% of the bid amount will be required to accompany all bids.</p>\n\n<p></p>\n\n<p>Questions and comments are welcome and must be sent to the Contract Specialist, Tabitha Haggart, at tabitha.haggart@us.af.mil</p>\n\n<p></p>\n\n<p>The Invitation for Bid (IFB) will be posted online at <u>www.SAM.gov </u>under the reference number FA875125B0002 on or about 25 March 2025. Bids will be due approximately 30 days later. A site visit will be conducted within 10 days after issuance of the IFB. The date will be finalized when the IFB is posted.</p>\n\n<p></p>\n\n<p>The IFB documents will only be available electronically. Potential bidders will be responsible for downloading the IFB documents and for monitoring the website for possible amendments and any additional information.</p>\n\n<p></p>\n\n<p>Award will be a firm fixed price (FFP) contract resulting from a competitive Invitation for Bid (IFB). Competing bidder&rsquo;s bids shall be ranked according to price.&nbsp; Award will be made to the lowest priced responsible bidder, whose bid is responsive to the terms of the IFB.&nbsp; Bids will be accepted on an all or none basis only. Partial bids will not be accepted. Successful bidders will be selected based upon the lowest total evaluated price (TEP).</p>\n\n<p></p>\n\n<p>NOTE:&nbsp; In order to receive a contract award, if issued, the successful bidder must be actively registered in and have their Online Representations and Certifications completed in the System for Acquisition Management (SAM) - <u>www.SAM.gov</u>.&nbsp; Bidders must also be actively registered in Wide Area Workflow (WAWF) - <u>https://piee.eb.mil</u>.</p>\n\n<p></p>\n\n<p>All responsible sources may submit a bid which shall be considered by the agency.&nbsp;</p>","text":"General Information\n\nDocument Type: Pre-Solicitation notice for the Installation of New Steam Boilers in Building 2 and Building 3\n\nSolicitation Number: FA875125B0002\n\nPosted Date: 6 March 2025\n\nResponse Date: 21 March 2025\n\nClassification Code: Y1NB- Construction of Heating and Cooling Plants\n\nNAICS Code: 236220 Commercial and Institutional Building Construction\n\nSet Aside: 100% Small Business\n\nCONTRACTING OFFICE ADDRESS\n\nAFRL/RIKO Specialized Acquisition & Operational Contracting, Department of the Air Force, Air Force Materiel Command, AFRL – Rome Research Site, AFRL/Information Directorate 26 Electronic Parkway, Rome, NY, 13441-45\n\nDescription:\n\nInstall steam boilers in building 2 and building 3.\n\nThe contractor shall furnish all labor, equipment, devices and materials and perform all work in accordance with the Technical Specifications and Drawings at the Air Force Research Site, Located in Rome, NY.\n\nThe work to be performed includes but is not limited to the following: General Construction, Fire Protection, Plumbing, Mechanical, Electrical, and incidental related work. The contractor shall comply with applicable federal, regional, state, and local laws and commercial standards.\n\nThe work will be performed in accordance with the B2 Technical Specifications (Attachment 1), dated 12 August 2024, B2 Drawings (Attachment 2), dated 12 August 2024 and Proposed Sump Pump Piping Addendum (Attachment 3), B3 Technical Specifications (Attachment 4), dated 17 December 2024, B3 Drawings (Attachment 5), dated 17 December 2024.\n\nThis acquisition will be a 100% Small Business Set-Aside IAW FAR 19.5. The applicable NAICS code is 236220 with an associated small business size standard of $45,000,000 average annual revenue.\n\nThe estimated magnitude of construction is between $5,000,000 and $10,000,000. Bidders must provide payment and performance bonding in the amount of its bid. A Bid guarantee in the amount of 20% of the bid amount will be required to accompany all bids.\n\nQuestions and comments are welcome and must be sent to the Contract Specialist, Tabitha Haggart, at tabitha.haggart@us.af.mil\n\nThe Invitation for Bid (IFB) will be posted online at www.SAM.gov under the reference number FA875125B0002 on or about 25 March 2025. Bids will be due approximately 30 days later. A site visit will be conducted within 10 days after issuance of the IFB. The date will be finalized when the IFB is posted.\n\nThe IFB documents will only be available electronically. Potential bidders will be responsible for downloading the IFB documents and for monitoring the website for possible amendments and any additional information.\n\nAward will be a firm fixed price (FFP) contract resulting from a competitive Invitation for Bid (IFB). Competing bidder’s bids shall be ranked according to price. Award will be made to the lowest priced responsible bidder, whose bid is responsive to the terms of the IFB. Bids will be accepted on an all or none basis only. Partial bids will not be accepted. Successful bidders will be selected based upon the lowest total evaluated price (TEP).\n\nNOTE: In order to receive a contract award, if issued, the successful bidder must be actively registered in and have their Online Representations and Certifications completed in the System for Acquisition Management (SAM) - www.SAM.gov. Bidders must also be actively registered in Wide Area Workflow (WAWF) - https://piee.eb.mil.\n\nAll responsible sources may submit a bid which shall be considered by the agency.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2025-03-31","posted_at":"2025-03-31T19:54:34.104Z","created_at":"2025-03-31T19:35:17.120Z","modified_at":"2025-05-22T03:55:52.133Z","response_deadline":{"raw":"2025-04-30T14:00:00-04:00","utc":"2025-04-30T18:00:00Z","date":"2025-04-30","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/32529e0716344ca1b9a7ea87a2981ae5/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-15","archive_type":"auto15"},"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"32529e0716344ca1b9a7ea87a2981ae5","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-19T10:03:27.598837797Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"36e050a6eed26412bbeed5b04d85e940364da5f72b72d2bf46e62958502cb0f6","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-19T10:03:27.598837797Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","text":"Please see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2025-04-11","posted_at":"2025-04-11T18:12:49.665Z","created_at":"2025-04-11T18:07:56.948Z","modified_at":"2025-05-22T03:55:52.133Z","response_deadline":{"raw":"2025-04-30T14:00:00-04:00","utc":"2025-04-30T18:00:00Z","date":"2025-04-30","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a4d0763f4d3b4e5ea9860011a10ebaf3/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-15","archive_type":"auto15"},"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-18T02:08:30.723600816Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"1c82b2a47448df74ee2c453a9f217c73b79b5f13b5255b3bd2a94e5827575f41","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-18T02:08:30.723600816Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>4/11/2025- A Question and Answer document has been posted</p>\n\n<p>____________________________________________________</p>\n\n<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","text":"4/11/2025- A Question and Answer document has been posted\n\n____________________________________________________\n\nPlease see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2025-04-17","posted_at":"2025-04-17T18:59:32.398Z","created_at":"2025-04-17T18:34:15.965Z","modified_at":"2025-05-22T03:55:52.133Z","response_deadline":{"raw":"2025-04-30T14:00:00-04:00","utc":"2025-04-30T18:00:00Z","date":"2025-04-30","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/efb6079a7d5a416e85450b15d8beb238/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-15","archive_type":"auto15"},"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"efb6079a7d5a416e85450b15d8beb238","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T10:15:00.810151566Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"88ed905eca88282ebfee4e6907f0595e0adfa536b391834aab6969694603319d","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T10:15:00.810151566Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.</p>\n\n<p>____________________________________________________</p>\n\n<p>4/11/2025- A Question and Answer document has been posted</p>\n\n<p>____________________________________________________</p>\n\n<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","text":"4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.\n\n____________________________________________________\n\n4/11/2025- A Question and Answer document has been posted\n\n____________________________________________________\n\nPlease see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2025-04-18","posted_at":"2025-04-18T16:35:06.050Z","created_at":"2025-04-18T16:21:45.316Z","modified_at":"2025-05-22T03:55:52.133Z","response_deadline":{"raw":"2025-04-30T14:00:00-04:00","utc":"2025-04-30T18:00:00Z","date":"2025-04-30","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5958c8bd5f9641348305f93df283e9ec/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-15","archive_type":"auto15"},"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5958c8bd5f9641348305f93df283e9ec","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T08:14:54.191333813Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"2301a62de67ac2bd48eb72260ee5ea7bdc1d5b59221044f2542cd06a92d1d9a6","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T08:14:54.191333813Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>4/18/25- The 2nd and final site visit is changed to&nbsp;4/23/25 at 1330, to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.</p>\n\n<p>The attendee list from 4/15/25 site visit is posted.</p>\n\n<p>A Question and Answer document has been posted</p>\n\n<p>___________________________________________________</p>\n\n<p>4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.</p>\n\n<p>____________________________________________________</p>\n\n<p>4/11/2025- A Question and Answer document has been posted</p>\n\n<p>____________________________________________________</p>\n\n<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","text":"4/18/25- The 2nd and final site visit is changed to 4/23/25 at 1330, to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.\n\nThe attendee list from 4/15/25 site visit is posted.\n\nA Question and Answer document has been posted\n\n___________________________________________________\n\n4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.\n\n____________________________________________________\n\n4/11/2025- A Question and Answer document has been posted\n\n____________________________________________________\n\nPlease see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2025-04-24","posted_at":"2025-04-24T19:14:47.743Z","created_at":"2025-04-24T19:10:37.926Z","modified_at":"2025-05-22T03:55:52.133Z","response_deadline":{"raw":"2025-04-30T14:00:00-04:00","utc":"2025-04-30T18:00:00Z","date":"2025-04-30","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/97792dbe1bb04bf288f614ae4e9992e8/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-15","archive_type":"auto15"},"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"97792dbe1bb04bf288f614ae4e9992e8","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T01:46:05.838502326Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"78549159d6b354e6664ec87ffc002af6af06cffbb637ff7b71111a14d5920460","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T01:46:05.838502326Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/18/25- The 2nd and final site visit is changed to&nbsp;4/23/25 at 1330, to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.</p>\n\n<p>The attendee list from 4/15/25 site visit is posted.</p>\n\n<p>A Question and Answer document has been posted</p>\n\n<p>___________________________________________________</p>\n\n<p>4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.</p>\n\n<p>____________________________________________________</p>\n\n<p>4/11/2025- A Question and Answer document has been posted</p>\n\n<p>____________________________________________________</p>\n\n<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","text":"4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.\n\n___________________________________________________\n\n4/18/25- The 2nd and final site visit is changed to 4/23/25 at 1330, to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.\n\nThe attendee list from 4/15/25 site visit is posted.\n\nA Question and Answer document has been posted\n\n___________________________________________________\n\n4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.\n\n____________________________________________________\n\n4/11/2025- A Question and Answer document has been posted\n\n____________________________________________________\n\nPlease see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2025-04-28","posted_at":"2025-04-28T18:37:29.398Z","created_at":"2025-04-28T18:36:56.261Z","modified_at":"2025-05-22T03:55:52.133Z","response_deadline":{"raw":"2025-04-30T14:00:00-04:00","utc":"2025-04-30T18:00:00Z","date":"2025-04-30","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/dc6a4da98996470a86015f75121f2ebd/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-15","archive_type":"auto15"},"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"dc6a4da98996470a86015f75121f2ebd","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-16T03:07:21.433519784Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"2e3a1cbfca05d2e89a3d69a00e7a2b5fd67a51312ccf8cbc6ba09d2d0f635ea0","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-16T03:07:21.433519784Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 an ammendment is forthcoming which will contain the exact date.&nbsp; More questions and answers will be posted, the final cut-off for questions is 1 May 2025.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/18/25- The 2nd and final site visit is changed to&nbsp;4/23/25 at 1330, to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.</p>\n\n<p>The attendee list from 4/15/25 site visit is posted.</p>\n\n<p>A Question and Answer document has been posted</p>\n\n<p>___________________________________________________</p>\n\n<p>4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.</p>\n\n<p>____________________________________________________</p>\n\n<p>4/11/2025- A Question and Answer document has been posted</p>\n\n<p>____________________________________________________</p>\n\n<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","text":"4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 an ammendment is forthcoming which will contain the exact date. More questions and answers will be posted, the final cut-off for questions is 1 May 2025.\n\n___________________________________________________\n\n4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.\n\n___________________________________________________\n\n4/18/25- The 2nd and final site visit is changed to 4/23/25 at 1330, to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.\n\nThe attendee list from 4/15/25 site visit is posted.\n\nA Question and Answer document has been posted\n\n___________________________________________________\n\n4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.\n\n____________________________________________________\n\n4/11/2025- A Question and Answer document has been posted\n\n____________________________________________________\n\nPlease see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2025-04-28","posted_at":"2025-04-28T18:42:15.169Z","created_at":"2025-04-28T18:42:02.152Z","modified_at":"2025-05-22T03:55:52.133Z","response_deadline":{"raw":"2025-04-30T14:00:00-04:00","utc":"2025-04-30T18:00:00Z","date":"2025-04-30","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e713741b1ad14bb9920293b8fadbdbb7/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-15","archive_type":"auto15"},"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e713741b1ad14bb9920293b8fadbdbb7","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-16T03:08:14.460992365Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"d8003ed6cd9fb82213ff160671e80434386e0c99906a4e927d1e82abcee3c5d8","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-16T03:08:14.460992365Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 an amendment is forthcoming which will contain the exact date.&nbsp; More questions and answers will be posted, the final cut-off for questions is 1 May 2025.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/18/25- The 2nd and final site visit is changed to&nbsp;4/23/25 at 1330, to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.</p>\n\n<p>The attendee list from 4/15/25 site visit is posted.</p>\n\n<p>A Question and Answer document has been posted</p>\n\n<p>___________________________________________________</p>\n\n<p>4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.</p>\n\n<p>____________________________________________________</p>\n\n<p>4/11/2025- A Question and Answer document has been posted</p>\n\n<p>____________________________________________________</p>\n\n<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","text":"4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 an amendment is forthcoming which will contain the exact date. More questions and answers will be posted, the final cut-off for questions is 1 May 2025.\n\n___________________________________________________\n\n4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.\n\n___________________________________________________\n\n4/18/25- The 2nd and final site visit is changed to 4/23/25 at 1330, to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.\n\nThe attendee list from 4/15/25 site visit is posted.\n\nA Question and Answer document has been posted\n\n___________________________________________________\n\n4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.\n\n____________________________________________________\n\n4/11/2025- A Question and Answer document has been posted\n\n____________________________________________________\n\nPlease see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2025-04-28","posted_at":"2025-04-28T18:36:09.689Z","created_at":"2025-04-28T18:31:25.958Z","modified_at":"2025-05-22T03:55:52.133Z","response_deadline":{"raw":"2025-04-30T14:00:00-04:00","utc":"2025-04-30T18:00:00Z","date":"2025-04-30","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fc51a67dcfe84cbfa9185ba90ff52ea0/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-15","archive_type":"auto15"},"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-16T03:11:31.960341725Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7678f9863f313656443bd4dd45d8d627b7e5ec08eeeb0af5cde60e172154e188","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-16T03:11:31.960341725Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 and ammendment is forthcoming which will contain the exact date.&nbsp; More questions and answers will be posted, the final cut-off for questions is 1 May 2025.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/18/25- The 2nd and final site visit is changed to&nbsp;4/23/25 at 1330, to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.</p>\n\n<p>The attendee list from 4/15/25 site visit is posted.</p>\n\n<p>A Question and Answer document has been posted</p>\n\n<p>___________________________________________________</p>\n\n<p>4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.</p>\n\n<p>____________________________________________________</p>\n\n<p>4/11/2025- A Question and Answer document has been posted</p>\n\n<p>____________________________________________________</p>\n\n<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","text":"4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 and ammendment is forthcoming which will contain the exact date. More questions and answers will be posted, the final cut-off for questions is 1 May 2025.\n\n___________________________________________________\n\n4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.\n\n___________________________________________________\n\n4/18/25- The 2nd and final site visit is changed to 4/23/25 at 1330, to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.\n\nThe attendee list from 4/15/25 site visit is posted.\n\nA Question and Answer document has been posted\n\n___________________________________________________\n\n4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.\n\n____________________________________________________\n\n4/11/2025- A Question and Answer document has been posted\n\n____________________________________________________\n\nPlease see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2025-04-30","posted_at":"2025-04-30T15:18:26.613Z","created_at":"2025-04-30T15:12:36.546Z","modified_at":"2025-05-22T03:55:52.133Z","response_deadline":{"raw":"2025-05-06T14:00:00-04:00","utc":"2025-05-06T18:00:00Z","date":"2025-05-06","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/99717a7c6f714e49bb121b83ef93e0cd/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-21","archive_type":"auto15"},"history":[{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"99717a7c6f714e49bb121b83ef93e0cd","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-16T01:34:29.155390256Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"d5e3e0b0bb36d08eb92532e80af4884318cc13a0ed9ead24a43106a1ed4bc35d","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-16T01:34:29.155390256Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>4/30/25- Amendment 0001 has been posted extending the response date to 5/6/2025 at 2PM EST.&nbsp;&nbsp;Offerors must acknowledge receipt of this amendment in their bid submission. Failure to acknowledge this amendment shall result in the bid being deemed non-responsive.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 an amendment is forthcoming which will contain the exact date.&nbsp; More questions and answers will be posted, the final cut-off for questions is 1 May 2025.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/18/25- The 2nd and final site visit is changed to&nbsp;4/23/25 at 1330, to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.</p>\n\n<p>The attendee list from 4/15/25 site visit is posted.</p>\n\n<p>A Question and Answer document has been posted</p>\n\n<p>___________________________________________________</p>\n\n<p>4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.</p>\n\n<p>____________________________________________________</p>\n\n<p>4/11/2025- A Question and Answer document has been posted</p>\n\n<p>____________________________________________________</p>\n\n<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","text":"4/30/25- Amendment 0001 has been posted extending the response date to 5/6/2025 at 2PM EST. Offerors must acknowledge receipt of this amendment in their bid submission. Failure to acknowledge this amendment shall result in the bid being deemed non-responsive.\n\n___________________________________________________\n\n4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 an amendment is forthcoming which will contain the exact date. More questions and answers will be posted, the final cut-off for questions is 1 May 2025.\n\n___________________________________________________\n\n4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.\n\n___________________________________________________\n\n4/18/25- The 2nd and final site visit is changed to 4/23/25 at 1330, to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.\n\nThe attendee list from 4/15/25 site visit is posted.\n\nA Question and Answer document has been posted\n\n___________________________________________________\n\n4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.\n\n____________________________________________________\n\n4/11/2025- A Question and Answer document has been posted\n\n____________________________________________________\n\nPlease see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2025-04-30","posted_at":"2025-04-30T19:02:53.545Z","created_at":"2025-04-30T18:59:55.034Z","modified_at":"2025-05-22T03:55:52.133Z","response_deadline":{"raw":"2025-05-06T14:00:00-04:00","utc":"2025-05-06T18:00:00Z","date":"2025-05-06","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e510eac8dd494bf5b3b286fdc75b4cd6/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-21","archive_type":"auto15"},"history":[{"index":17,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T13:08:21.565Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"d7495efa567545b08979f26dbc0cf305","solicitation_number":"FA875125C0004","related_opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6"},{"index":14,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":12,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T15:18:26.613Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"99717a7c6f714e49bb121b83ef93e0cd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":11,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:42:15.169Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e713741b1ad14bb9920293b8fadbdbb7","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":10,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:37:29.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc6a4da98996470a86015f75121f2ebd","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":9,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-28T18:36:09.689Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fc51a67dcfe84cbfa9185ba90ff52ea0","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":8,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-24T19:14:47.743Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97792dbe1bb04bf288f614ae4e9992e8","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":7,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-18T16:35:06.050Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5958c8bd5f9641348305f93df283e9ec","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":6,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-17T18:59:32.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"efb6079a7d5a416e85450b15d8beb238","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-11T18:12:49.665Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"a4d0763f4d3b4e5ea9860011a10ebaf3","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"},{"index":4,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T14:14:58.501Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"8366557925864cc19dc3b2271f81a508","solicitation_number":"FA875125B0002"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-31T19:54:34.104Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","solicitation_number":"FA875125B0002","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e510eac8dd494bf5b3b286fdc75b4cd6","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-16T01:46:57.265126060Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"fbe5d3ce7d408b80f7f75add8b949c93c920ba6a80ffe1e01b60ed932b5968fe","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-16T01:46:57.265126060Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>4/30/25-A Question and Answer document has been posted.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/30/25- Amendment 0001 has been posted extending the response date to 5/6/2025 at 2PM EST.&nbsp;&nbsp;Offerors must acknowledge receipt of this amendment in their bid submission. Failure to acknowledge this amendment shall result in the bid being deemed non-responsive.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 an amendment is forthcoming which will contain the exact date.&nbsp; More questions and answers will be posted, the final cut-off for questions is 1 May 2025.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/18/25- The 2nd and final site visit is changed to&nbsp;4/23/25 at 1330, to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.</p>\n\n<p>The attendee list from 4/15/25 site visit is posted.</p>\n\n<p>A Question and Answer document has been posted</p>\n\n<p>___________________________________________________</p>\n\n<p>4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.</p>\n\n<p>____________________________________________________</p>\n\n<p>4/11/2025- A Question and Answer document has been posted</p>\n\n<p>____________________________________________________</p>\n\n<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","text":"4/30/25-A Question and Answer document has been posted.\n\n___________________________________________________\n\n4/30/25- Amendment 0001 has been posted extending the response date to 5/6/2025 at 2PM EST. Offerors must acknowledge receipt of this amendment in their bid submission. Failure to acknowledge this amendment shall result in the bid being deemed non-responsive.\n\n___________________________________________________\n\n4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 an amendment is forthcoming which will contain the exact date. More questions and answers will be posted, the final cut-off for questions is 1 May 2025.\n\n___________________________________________________\n\n4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.\n\n___________________________________________________\n\n4/18/25- The 2nd and final site visit is changed to 4/23/25 at 1330, to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.\n\nThe attendee list from 4/15/25 site visit is posted.\n\nA Question and Answer document has been posted\n\n___________________________________________________\n\n4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.\n\n____________________________________________________\n\n4/11/2025- A Question and Answer document has been posted\n\n____________________________________________________\n\nPlease see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA875125B0002","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"award":{"date":"2025-07-01","amount":"7097304.39","number":"FA875125C0004","awardee":{"raw":"FOUR TRIBES CIVIL CONSTRUCTION LLC Reno NV 89502 USA","uei":"H14MDA9DKMG1","cage":"8AL62","name":"FOUR TRIBES CIVIL CONSTRUCTION LLC","location":{"zip":"89502","city":{"code":"60600","name":"Reno"},"state":{"code":"NV","name":"Nevada"},"country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2025-07-01","posted_at":"2025-07-01T13:08:21.565Z","award_date":"2025-07-01","created_at":"2025-07-01T13:02:56.405Z","modified_at":"2025-07-17T04:00:08.445Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/d7495efa567545b08979f26dbc0cf305/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Install Boilers, Building 2 and Building 3","agency":{"office":{"code":"FA8751","name":"FA8751 AFRL RIKO"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"organization_id":"100512674","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-16","archive_type":"auto15"},"history":[{"index":5,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-01T13:08:21.565Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"d7495efa567545b08979f26dbc0cf305","solicitation_number":"FA875125C0004","related_opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6"},{"index":2,"title":"Install Boilers, Building 2 and Building 3","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-30T19:02:53.545Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"e510eac8dd494bf5b3b286fdc75b4cd6","solicitation_number":"FA875125B0002","parent_opportunity_id":"32529e0716344ca1b9a7ea87a2981ae5","related_opportunity_id":"8366557925864cc19dc3b2271f81a508"}],"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d7495efa567545b08979f26dbc0cf305","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"32529e0716344ca1b9a7ea87a2981ae5","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T14:42:15.440673627Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"1949029a9f882412f0d33323bb08fee62bcba93559cdf43505f0e69ddc21ab16","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-11T14:42:15.440673627Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"FA875125C0004","place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"}],"due_at":"2025-05-06T18:00:00Z","due_date":"2025-05-06","closes_at":"2025-05-06T18:00:00Z","awardable":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA8751","office_name":"FA8751 AFRL RIKO","state":"NY","county":"36065","county_name":"Oneida County","city":"3663418","city_name":"Rome","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"H14MDA9DKMG1","amount":"7097304.39","linked_awards":12,"cancelled":false,"archived":true,"updated_at":"2026-11-11T14:46:04.384470Z","principal_notice_id":"e510eac8dd494bf5b3b286fdc75b4cd6","description":{"text":"4/30/25-A Question and Answer document has been posted.\n\n___________________________________________________\n\n4/30/25- Amendment 0001 has been posted extending the response date to 5/6/2025 at 2PM EST. Offerors must acknowledge receipt of this amendment in their bid submission. Failure to acknowledge this amendment shall result in the bid being deemed non-responsive.\n\n___________________________________________________\n\n4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 an amendment is forthcoming which will contain the exact date. More questions and answers will be posted, the final cut-off for questions is 1 May 2025.\n\n___________________________________________________\n\n4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.\n\n___________________________________________________\n\n4/18/25- The 2nd and final site visit is changed to 4/23/25 at 1330, to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.\n\nThe attendee list from 4/15/25 site visit is posted.\n\nA Question and Answer document has been posted\n\n___________________________________________________\n\n4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.\n\n____________________________________________________\n\n4/11/2025- A Question and Answer document has been posted\n\n____________________________________________________\n\nPlease see attached Solicitation (Invitation for Bids - SF 1442)\n\nNOTE TO BIDDERS:\n\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.\n\nPRE-BID CONFERENCE/SITE VISIT RESERVATION\n\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.\n\nCONTRACTOR INQUIRIES\n\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include \"FA875125B0002\" in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.\n\nSubmit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.\n\nMETHODS OF RESPONSE\n\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.\n\nReceipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.\n\nDue to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor's responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 \"Submission, modification, revision, and withdrawal of bids.\"\n\nBID OPENING\n\nBid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.","html":"<p>4/30/25-A Question and Answer document has been posted.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/30/25- Amendment 0001 has been posted extending the response date to 5/6/2025 at 2PM EST.&nbsp;&nbsp;Offerors must acknowledge receipt of this amendment in their bid submission. Failure to acknowledge this amendment shall result in the bid being deemed non-responsive.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/28/25- The Government will be extending the response date to the week of 5/5-5/9/2025 an amendment is forthcoming which will contain the exact date.&nbsp; More questions and answers will be posted, the final cut-off for questions is 1 May 2025.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/24/25- A Question and Answer document has been posted, it is highly likely the Government will not be able to field additonal questions prior to bid opening.</p>\n\n<p>___________________________________________________</p>\n\n<p>4/18/25- The 2nd and final site visit is changed to&nbsp;4/23/25 at 1330, to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/22/25.</p>\n\n<p>The attendee list from 4/15/25 site visit is posted.</p>\n\n<p>A Question and Answer document has been posted</p>\n\n<p>___________________________________________________</p>\n\n<p>4/17/25- An additional site visit is scheduled for 4/22/25 at 0930 to attend&nbsp;create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil by 1200 on 4/21/25.</p>\n\n<p>____________________________________________________</p>\n\n<p>4/11/2025- A Question and Answer document has been posted</p>\n\n<p>____________________________________________________</p>\n\n<p>Please see attached Solicitation (Invitation for Bids - SF 1442)&nbsp;</p>\n\n<p>NOTE TO BIDDERS:<br />\nThe requirements documents are provided as attachments to the solicitation. Bids will be accepted on an all or none basis. Partial bids will not be accepted.</p>\n\n<p>PRE-BID CONFERENCE/SITE VISIT RESERVATION<br />\nAn additional pre-bid conference and site visit has been tentatively scheduled for 15 April 2025 at 1:30pm EST. Bidders wishing to attend must create a DBIDS Pre-Enrollment Request on https://dbids-global-enroll.dmdc.mil and email the QR confirmation code to tabitha.haggart@us.af.mil at least one week prior to scheduled site visit.</p>\n\n<p>CONTRACTOR INQUIRIES<br />\nFormal communications/inquiries, such as requests for clarification or information concerning this solicitation, MUST be in writing and include &quot;FA875125B0002&quot; in the subject line. When addressing questions concerning any aspect of the solicitation, state the page number, section, and paragraph number needing clarification.</p>\n\n<p>Submit inquiries to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil. All questions must be submitted by 2PM EST on 21 April 2025.<br />\n<br />\nMETHODS OF RESPONSE<br />\nEmail submission is the only acceptable form of bid submission. Bidders must submit to Tabitha Haggart at tabitha.haggart@us.af.mil with a copy to Bryant Soule at bryant.soule@us.af.mil.</p>\n\n<p>Receipt of email submissions prior to the posted solicitation closing time will be considered timely. Hard copies, facsimile and alternate bids will not be accepted.</p>\n\n<p>Due to the possibility of network connectivity issues, it is highly encouraged that electronic bid submissions be sent one day prior to bid opening. It is the contractor&#39;s responsibility to confirm receipt of bid. Late bids will be processed in accordance with FAR 14.304 &quot;Submission, modification, revision, and withdrawal of bids.&quot;</p>\n\n<p>BID OPENING</p>\n\n<p>Bid Opening will take place at the time specified on the SF1442, Block 13a, in the Visitor Control Center (VCC) AFRL/Information Directorate, 304 Brooks Rd, Rome, NY 13441. Please contact Tabitha Haggart or Bryant Soule with any questions on how to reach the location.</p>","origin":"detail"},"contacts":[{"name":"Tabitha Haggart","role":"primary","email":"tabitha.haggart@us.af.mil"},{"name":"Bryant Soule","role":"secondary","email":"Bryant.Soule@us.af.mil"}],"place_of_performance":{"zip":"13441","city":{"code":"63418","name":"Rome"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"13441-4514","city":"ROME","state":"NY","country":"USA"},"naics_codes":["236220"],"award":null,"attachments":[{"resource_id":"ccd3551aff9a4005a240aab3dfbb8eee","name":"Attch 1 B2- Construction Specifications.pdf","kind":"file","mime_type":".pdf","size_bytes":2982302,"posted_at":"2025-03-06T14:14:58.501Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ccd3551aff9a4005a240aab3dfbb8eee/download","mirrored":false},{"resource_id":"72dfc7bbb8f94ddc908bab891489bcba","name":"Attch 2 B2 - Contract Drawings.pdf","kind":"file","mime_type":".pdf","size_bytes":11766633,"posted_at":"2025-03-06T14:14:58.501Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/72dfc7bbb8f94ddc908bab891489bcba/download","mirrored":false},{"resource_id":"9e7687eb4f5e4b42b36ff694e78cde68","name":"Attch 3 B2 Addendum.pdf","kind":"file","mime_type":".pdf","size_bytes":261524,"posted_at":"2025-03-06T14:14:58.501Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9e7687eb4f5e4b42b36ff694e78cde68/download","mirrored":false},{"resource_id":"6377e2a9db394993b6f72a721dff2483","name":"Attch 4 B2 Haz Mat Report.pdf","kind":"file","mime_type":".pdf","size_bytes":5554642,"posted_at":"2025-03-06T14:14:58.501Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6377e2a9db394993b6f72a721dff2483/download","mirrored":false},{"resource_id":"b34f04096f884201b037c0cd9a9a321a","name":"Attch 5 B3 - Construction Specifications.pdf","kind":"file","mime_type":".pdf","size_bytes":26112802,"posted_at":"2025-03-06T14:14:58.501Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b34f04096f884201b037c0cd9a9a321a/download","mirrored":false},{"resource_id":"226f9d429ab0427593244079ff59488d","name":"Attch 6 B3 - Construction Drawing.pdf","kind":"file","mime_type":".pdf","size_bytes":19560145,"posted_at":"2025-03-06T14:14:58.501Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/226f9d429ab0427593244079ff59488d/download","mirrored":false},{"resource_id":"2634ccf0b9844f85840e80b5d2100596","name":"Attch 7 Hazmat AFRL Bldg 3 022924.pdf","kind":"file","mime_type":".pdf","size_bytes":12194065,"posted_at":"2025-03-06T14:14:58.501Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2634ccf0b9844f85840e80b5d2100596/download","mirrored":false},{"resource_id":"943f8164538b4f48a65e198864b304c6","name":"Attachment 9_ FRL RI SOW-PWS Supplemental Requirements.pdf","kind":"file","mime_type":".pdf","size_bytes":137873,"posted_at":"2025-03-31T19:54:34.104Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/943f8164538b4f48a65e198864b304c6/download","mirrored":false},{"resource_id":"6782f9a855064c55b31b70faf43b8a0c","name":"Attch 8 Davis Bacon Act WD No. NY20250013.pdf","kind":"file","mime_type":".pdf","size_bytes":2078829,"posted_at":"2025-03-31T19:54:34.104Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6782f9a855064c55b31b70faf43b8a0c/download","mirrored":false},{"resource_id":"838000d356ba436d9f4ed2ebd7f85046","name":"Attch 7 Hazmat AFRL Bldg 3 022924.pdf","kind":"file","mime_type":".pdf","size_bytes":12194065,"posted_at":"2025-03-31T19:54:34.104Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/838000d356ba436d9f4ed2ebd7f85046/download","mirrored":false},{"resource_id":"626e967044b94198bc7a9e1acf48ceb6","name":"Attch 6 B3 - Construction Drawing.pdf","kind":"file","mime_type":".pdf","size_bytes":19560145,"posted_at":"2025-03-31T19:54:34.104Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/626e967044b94198bc7a9e1acf48ceb6/download","mirrored":false},{"resource_id":"0ea94e3c3f1845e8a1f9ce15a48cb525","name":"Attch 5 B3 - Construction Specifications.pdf","kind":"file","mime_type":".pdf","size_bytes":26112802,"posted_at":"2025-03-31T19:54:34.104Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0ea94e3c3f1845e8a1f9ce15a48cb525/download","mirrored":false},{"resource_id":"5752fcefd6bd4125869472b136dae753","name":"Attch 4 B2 Haz Mat Report.pdf","kind":"file","mime_type":".pdf","size_bytes":5554642,"posted_at":"2025-03-31T19:54:34.104Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5752fcefd6bd4125869472b136dae753/download","mirrored":false},{"resource_id":"035d7549ca994ca0a350b63c742140ca","name":"Attch 3 B2 Addendum.pdf","kind":"file","mime_type":".pdf","size_bytes":261524,"posted_at":"2025-03-31T19:54:34.104Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/035d7549ca994ca0a350b63c742140ca/download","mirrored":false},{"resource_id":"3781117f2b17441582cc285a6b570d1d","name":"Attch 2 B2 - Contract Drawings.pdf","kind":"file","mime_type":".pdf","size_bytes":11766633,"posted_at":"2025-03-31T19:54:34.104Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3781117f2b17441582cc285a6b570d1d/download","mirrored":false},{"resource_id":"344ccafe4885425cb3b16f602d4659d6","name":"Attch 1 B2- Construction Specifications.pdf","kind":"file","mime_type":".pdf","size_bytes":2982302,"posted_at":"2025-03-31T19:54:34.104Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/344ccafe4885425cb3b16f602d4659d6/download","mirrored":false},{"resource_id":"ca591a941c2244efab414dff44f40555","name":"Solicitation - FA875125B0002.pdf","kind":"file","mime_type":".pdf","size_bytes":1722873,"posted_at":"2025-03-31T19:54:34.104Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ca591a941c2244efab414dff44f40555/download","mirrored":false},{"resource_id":"99479ad882024d4c9b465c9ad8557ce6","name":"FA875125B0002 Q and A 4-11-25.docx","kind":"file","mime_type":".docx","size_bytes":15174,"posted_at":"2025-04-11T18:12:49.665Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/99479ad882024d4c9b465c9ad8557ce6/download","mirrored":false},{"resource_id":"62515d63c14b41c2bef54500779c3f89","name":"April 15 site visit attendee list.docx","kind":"file","mime_type":".docx","size_bytes":16032,"posted_at":"2025-04-18T16:35:06.050Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/62515d63c14b41c2bef54500779c3f89/download","mirrored":false},{"resource_id":"783dae250e1d4084843e9ad38f9738d5","name":"FA875125B0001 Q and A 4-18-25.docx","kind":"file","mime_type":".docx","size_bytes":17205,"posted_at":"2025-04-18T16:35:06.050Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/783dae250e1d4084843e9ad38f9738d5/download","mirrored":false},{"resource_id":"b7cd71f55b854cf193d5f59ad08eaa37","name":"FA875125B0002 Q and A _4-24-25.docx","kind":"file","mime_type":".docx","size_bytes":17801,"posted_at":"2025-04-24T19:14:47.743Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b7cd71f55b854cf193d5f59ad08eaa37/download","mirrored":false},{"resource_id":"ea6e0f9a67f649d4bb81bd30a50f6f73","name":"Solicitation Amendment FA875125B00020001 SF 30.pdf","kind":"file","mime_type":".pdf","size_bytes":1403280,"posted_at":"2025-04-30T15:18:26.613Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ea6e0f9a67f649d4bb81bd30a50f6f73/download","mirrored":false},{"resource_id":"c345f40783524b0392a554b16775653c","name":"FA875125B0002 Q and A 4-30-25.docx","kind":"file","mime_type":".docx","size_bytes":19166,"posted_at":"2025-04-30T19:02:53.545Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c345f40783524b0392a554b16775653c/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_FA875125C0004_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_FA875125C0004_9700_-NONE-_-NONE-/","piid":"FA875125C0004","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"H14MDA9DKMG1","recipient_name":"FOUR TRIBES CIVIL CONSTRUCTION LLC","recipient_uei":"H14MDA9DKMG1","recipient_cage":"8AL62","recipient_city":"RENO","recipient_state":"NV","sub_name":"Department of the Air Force","office_name":"FA8751 AFRL RIKO","office_key":"o-FA8751","first_action_date":"2025-07-01","last_action_date":"2025-07-01","actions":1,"obligated":"7097304.39","current_total_value":"7097304.39","potential_total_value":"7097304.39","naics":"236220","psc":"Y1NB","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":3,"description":"INSTALL STEAM BOILERS IN BUILDINGS 2 AND 3 AT AFRL, ROME, NY","method":"piid","confidence":"high","evidence":["award number FA875125C0004 equals the contract number","same awarding office FA8751"],"opportunity_key":null,"opportunity_title":null}],"related":[],"similar_open":[{"key":"36C24227Q0135","latest_notice_id":"878a17ea716349ce875349b4308f3e10","title":"Y1DA--STATION-CONST TBD OIG RENOVATION","solicitation_number":"36C24227Q0135","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":2,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Y1DA","set_aside":"SDVOSBC","state":"NY","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"ANTEEN OPERATIONS. LOCATION: MARGARET COCHRAN CORBIN VA CAMPUS 423 EAST, 23RD STREET NEW YORK, NY 10010","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C24227B00050001","latest_notice_id":"684f30abb8934f0393559f87438724b3","title":"Z1DA--528A5-27-504 Seal and Stripe Parking Lots","solicitation_number":"36C24227B0005-0001","notice_type":"o","first_type":"o","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"NY","county":"36069","county_name":"Ontario County","city":"3612144","city_name":"Canandaigua","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24227B0005","latest_notice_id":"d91ec8aa1ebf44dfab4a2168f6e4a162","title":"Z1DA--528A5-27-504 Seal and Stripe Parking Lots","solicitation_number":"36C24227B0005","notice_type":"o","first_type":"p","first_posted":"2026-10-13","last_posted":"2026-10-29","notices":3,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"NY","county":"36069","county_name":"Ontario County","city":"3612144","city_name":"Canandaigua","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-30T03:41:17.879115Z"}],"similar_open_total":195,"indexable":false}