Sources sought
Request for Information (RFI) for Request for Information (RFI) For B-52 Advanced Wing Weapons Pylon (AWWP)
FA8628-27-R-B001
Department of the Air Force, FA8628 AFLCMC WBDK B52. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
July 6, 2026 at 5:00 PM EDT
Closed 142 days ago. Posted May 6, 2026. Scheduled to archive July 21, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
564 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- SPE4A727R0053-1680-014732355 - PANEL,CONTROL,ELECTRICAL-ELECTRONIC EQ/ 05F/AIRCRAFT,STRATOLIFTER C/KC
Defense Logistics Agency, DLA Aviation
PresolicitationSmall businessNAICS 336413Ship to Tracy, CASPE4A727R0053Due in 7 daysDec 2 - Hydraulic Actuator Flow Test Stand
Department of the Navy, Fleet Readiness Center
Sources soughtNAICS 336413Ship to San Diego, CAN68520-27-RFPREQ-KN00000-0075Due in 7 daysDec 2 - CENTRAL CONTROLLER
Defense Logistics Agency, DLA Aviation at Huntsville, Al
PresolicitationNAICS 336413Ship to CASPRRA1-27-Q-A010Closes in 8 daysDec 3
All 564 open in other aircraft parts and auxiliary equipment manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336413 (other aircraft parts and auxiliary equipment manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of May 6, 2026. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Department of the Air Force is issuing this Request for Information (RFI) to conduct market research and identify qualified industry partners capable of supporting an accelerated Engineering and Manufacturing Development (EMD) phase and subsequent production of a replacement external weapons release pylon for the B-52 aircraft.
To meet emerging mission needs, the Government requires a newly designed Advanced Wing Weapons Pylon (AWWP) that incorporates MIL-STD-1760 series heavy weapon capability.
The anticipated acquisition strategy targets a 36-month EMD phase culminating in a Critical Design Review (CDR). Upon successful completion of the EMD phase, the design must be ready for integration with required support equipment, transitioning immediately into the production of 20 to 24 pylons (with a minimum delivery of 12 pylons in the first year).
Key Objectives for Industry Feedback:
-
Assess the feasibility of the proposed 36-month EMD timeline to CDR and production timeline.
-
Identify vendors with the engineering expertise to design and manufacture heavy weapons carriage systems (>5,000 lbs capacity).
-
Inform the Government's overall Acquisition Strategy.
Note: Physical work locations may vary, and interested parties must be willing and able to travel. Small businesses are highly encouraged to participate and respond to this RFI.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- RFI_AWWP_6May26.pdf120 KB, May 6, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 6, 2026
Sources sought
Due July 6, 2026 at 5:00 PM EDT. SAM.gov, notice cc52f037101c4b628eb116bb439253ed
2 revisions on SAM
- May 15, 2026: publish, sources sought
- May 6, 2026: publish, sources sought
Points of contact
- Ashley Grayashley.gray.9@us.af.mil
- Matthew Leskomatthew.lesko@us.af.mil