Presolicitation
JOINT ELECTRONIC DATA ACQUISITION INTERFACE (JEDAI)
FA823226RB015
Department of the Air Force, FA8232 AFLCMC WWMK. Engineering Services.
Response deadline
July 5, 2026 at 12:00 PM EDT
Closed 143 days ago. Posted June 18, 2026. Scheduled to archive July 20, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
100 like it are open now in engineering services
- AIS Engineering Services for ATE
Department of the Air Force, FA8251 AFSC Pzabb
SolicitationNAICS 541330UtahSolicitation_for_AIS_ATE_Engineering_ServicesCloses in 21 daysDec 16 - Hardness Surveillance EMP Program (HSEP) for ICBM. The contractor shall furnish all equipment required to perform HSEP testing to include High altitude burs pulser that is approved and certified for nuclear safety by the Government IAW PWS.
Department of the Air Force, FA8207 Afnwc PZBC
SolicitationNAICS 541330UtahFA820727RB001Closes in 57 daysJan 21, 2027 - Universal Robotics e-Series Arm
National Aeronautics and Space Administration, NASA Shared Services Center
Combined synopsis and solicitationSmall businessNAICS 541330Ship to CA80NSSC27949205QDue todayNov 25
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 541330 (engineering services), means no more than $25.5 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation has been published under this number yet. The presolicitation of June 18, 2026 is the earliest notice of the purchase.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Air Force Life Cycle Management Center (AFLCMC) intends to award a sole-source IDIQ contract to General Electric Aerospace for the development, qualification, test, and sustainment of the Joint Electronic Data Acquisition Interface (JEDAI) Line Replaceable Unit (LRU).
The JEDAI LRU is the required fleet-wide replacement for the Crash Survivable Flight Data Recorder (CSFDR) system for the F-16C/D Block 30/32/40/42/50/52 fleet. The current CSFDR systems are experiencing critical challenges due to aging, high failure rates, and lack of repair options, which directly impacts aircraft availability and mission readiness. This effort will establish a single, standardized LRU to create a common F-16 configuration, address exhausted spares, increase system reliability, and reduce maintenance costs. The total estimated value is $40.4M.
This notice of intent is not a request for competitive proposals. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government.
Justification for Sole Source (RFO 6.104-1(a)(4))
This acquisition is being conducted on a sole-source basis under the authority of 10 U.S.C. 3204(a)(1), as implemented by the Revolutionary FAR Overhaul (RFO), which states that only one responsible source and no other supplies or services will satisfy agency requirements.
- Rationale (RFO 6.104-1(a)(5)): General Electric (GE) Aerospace is the Original Equipment Manufacturer (OEM) of the F-16 CSFDR. The Government does not possess the requisite technical data, drawings, or software data rights necessary to support a competitive procurement for this redesign and sustainment effort. This data is proprietary to GE, and the company has formally stated it will not sell the data rights to the Government.
- Market research, including multiple Sources Sought Synopses, confirmed that no other source could meet the program's requirements without substantial duplication of cost, estimated at over $40M, and unacceptable schedule delays of at least eight years. Two interested vendors responded to a 2025 Sources Sought notice; however, a comprehensive government engineering review determined their proposed solutions were technically unacceptable, failing to meet critical requirements for Size, Weight, and Power (SWaP), security, and system integration.
Instructions to Responding Parties
All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. Interested parties who believe they can meet the requirements are to submit a response that clearly details their capability to do so without incurring the cost and schedule impacts detailed above. Responses must be submitted by the closing date of this notice to the contracting officer.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 18, 2026
Presolicitation
Due July 5, 2026 at 12:00 PM EDT. SAM.gov, notice 092d3e01e5b24b0ab91764df1f11bed5
2 revisions on SAM
- September 25, 2026: publish, justification
- June 18, 2026: publish, presolicitation
Points of contact
- Jessica Boylesjessica.boyles.1@us.af.mil8017779333
- Jesse Bairdjesse.baird@us.af.mil