Sources sought
AFNWC Design and Construction - Sentinel Launch Facilities, F.E. Warren AFB, Malmstrom AFB and Minot AFB
FA8219-25-S-LFNWC
Department of the Air Force, FA8219 Afnwc PZBG. Other Heavy and Civil Engineering Construction.
Response deadline
March 20, 2025 at 4:00 PM EDT
Closed 615 days ago. Posted March 14, 2025, first published February 14, 2025. Scheduled to archive April 4, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
144 like it are open now in other heavy and civil engineering construction
- FAIR Route 3 - 96-inch CMP Replacement Project
Bureau of Indian Affairs, Bureau of Indian Affairs
Combined synopsis and solicitationIndian small businessNAICS 237990Location not published140A1627Q0105Due todayNov 25 - JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
Department of the Army, W071 Endist Portland
Due in 5 daysNov 30 - UPPER MISSISSIPPI RIVER RESTORATION (UMRR) POOL 12 FLOODPLAIN FOREST STAGE ONE (1) - HABITAT REHABILITATION AND ENHANCEMENT PROJECT (HREP)
Department of the Army, W07V Endist Rock Island
Sources soughtNAICS 237990Several statesW912EK27T0002Due in 7 daysDec 2
All 144 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of February 14, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This Sources Sought Notice (SSN) with Request for Information (RFI) is being issued for informational and planning purposes only as market research (FAR 10.001(b) to determine the availability, capability, information, and interest of firms from industry for a potential Government requirement. This is NOT a Request for Proposal (RFP). It does not constitute a solicitation and shall not be construed as a commitment by the Government.
Responses in any form are not offers and the Government is under no obligation to award a contract as a result of this announcement. No funds are available to pay for preparation of responses to this announcement. Responders are advised that the Government will not pay for any information or administrative costs incurred in response to this SSN/RFI; all costs associated with responding to this notice will be solely at the interested party’s expense. Any information submitted by respondents to this technical description is strictly voluntary.
Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources.
Not responding to this notice does not preclude participation in any future RFP, if any is issued. If a solicitation is released, it will be synopsized on the SAM.gov. It is the responsibility of the potential offerors to monitor these sites for additional information pertaining to this requirement.
The Air Force Nuclear Weapons Center (AFNWC) is seeking information from interested contractors for the Design and Construction of the Sentinel Systems Infrastructure Launch Facilities in missile fields, associated with three (3) different Air Force Bases (AFB).
- F.E. Warren (AFB) located in Wyoming, with launch facilities in Colorado, Nebraska, & Wyoming.
- Malmstrom (AFB) located in Montana.
- Minot (AFB) Located in North Dakota.
GENERAL SCOPE:
The United States Department of the Air Force (DAF) plans to procure the replacement of the Minuteman III infrastructure launch facilities that have reached the end of their lifecycle.
The Air Force Nuclear Weapons Center anticipates potential requirements for military construction (MILCON) of Sentinel Lauch Facilities located across five (5) states encompassing three (3) Air Force Bases. This requirement is anticipated to be accomplished as a Design-Build (DB) and/or Design-Bid-Build (DBB) project(s). The project execution window is currently anticipated between 2028-2040. The potential requirement may result in a solicitation issued approximately 2026.
The Sentinel Ground Based Strategic Deterrent Intercontinental Ballistic Missile System Program at these AFBs include constructing 450 launch facilities across 40,000 square miles.
These new launch facilities will be located within secure boundaries. Sub-surface hardened silo dimensions are estimated to be 20 feet in diameter with a depth of 110 feet and hardened sub-surface support facilities estimated to be 1,000 to 2,000 square feet to house critical equipment.
Each launch facility will be permanent construction. These facilities will comply with Department of Defense Anti-terrorism/Force Protection requirements. Additionally, the hardened launch facilities will be equipped with delay and denial measures.
Additional information about the program can be found in the Final Environmental Impact Statement (FEIS) which is located here: https://www.afgsc.af.mil/Sentinel/Environmental-Impact-Statement/
In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(v), the Government currently estimates the magnitude of construction for the potential project is over $500,000,000.
With current estimates of magnitude of construction for each location:
Between $5,000,000,000 and $10,000,000,000
- F.E. Warren (AFB)
- Malmstrom (AFB)
- Minot (AFB)
The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237990 Other Heavy and Civil Engineering Construction. The small business size standard for the NAICS, as established by the U.S. Small Business Administration, is $45,000,000 annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1BF, Construction of Missile Systems Facilities.
If there is a reasonable expectation that at least two (2) responsible small business concerns under this NAICS can provide the anticipated services at fair market prices, the Contracting Officer is required to set the acquisition aside for small business concerns. If competition is set-aside for small businesses, Federal Acquisition Regulation 52.219-14, Limitations on Subcontracting, requires that general construction small business Contractors self-perform at least twenty-five percent (25%) of the cost of the contract, not including the cost of materials. If no set aside is made, the requirement is competed with full and open competition, and the awarded Contractor is not a small business, the Contractor will be required to self-perform the percent of work identified in the solicitation under FAR 52.236-1, Performance of Work by the Contractor.
Contractors with the skill, capabilities, workload capacity, and ability to obtain bonding to complete the project described above (either through self-performance and/or Subcontractor management) are invited to provide capability statements to the primary point of contact listed below. Since information received from this sources sought synopsis will be used to make acquisition decisions, both small businesses and other than small businesses are encouraged to submit responses to the Capability Statements, PLA Survey and Request for Information attachments.
Please provide responses to the attached capabilities, PLA Survey and Request for Information questions by e-mail to Peggy Japngie Lizotte at peggy.japngie_lizotte.1@us.af.mil and Jeremy Grimley at jeremy.grimley.1@us.af.mil no later than 2:00 PM MDT, 20 MARCH 2025.
Please include in the response e-mail subject line the Sources Sought Notice number and project title, ‘FA8219-25-S-LFNWC AFNWC Design and Construction - Sentinel Launch Facility’.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Sentinel LF - Attachment 3 Request for Information.docx39 KB, February 14, 2025
- Sentinel LFs - Attachment 2 PLA Survey.docx35 KB, February 14, 2025
- Sentinel LFs - Attachment 1 Capability Statement.docx35 KB, February 14, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 14, 2025
Sources sought
Due March 17, 2025 at 4:00 PM EDT. SAM.gov, notice edf8787d890d4a1dac0299f5e3d42ce2
2 revisions on SAM
- March 14, 2025: publish, sources sought
- February 14, 2025: publish, sources sought
March 14, 2025
Sources sought
Due March 20, 2025 at 4:00 PM EDT. SAM.gov, notice fda62700be174fac9d8bd3d1ce5290ea
2 revisions on SAM
- March 14, 2025: publish, sources sought
- February 14, 2025: publish, sources sought
Points of contact
- Jeremy Grimleyjeremy.grimley.1@us.af.mil
- Peggy Japngie Lizottepeggy.japngie_lizotte.1@us.af.mil