Sources sought
Elevon Actuator Controller (EAC) Remanufacture
FA8128-26-X-XXXX-EAC
Department of the Air Force, FA8128 Afnwc PZN. Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing.
Response deadline
October 10, 2025 at 5:00 PM EDT
Closed 413 days ago. Posted September 22, 2025, first published September 19, 2025. Scheduled to archive October 25, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
8 like it are open now in other guided missile and space vehicle parts and auxiliary equipment manufacturing
- BRACKET,MOUNTING
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSmall businessNAICS 336419Ship to the buyerSPE4A027T0763Due in 6 daysDec 2 - HEATER,THERMAL RELEASE
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 336419Ship to the buyerSPE7M527T3498Closes in 11 daysDec 7 - ICBM Bulkhead Assembly
Defense Logistics Agency, DLA Aviation at Ogden, Ut
SolicitationSmall businessNAICS 336419Ship to the buyerSPRHA2-26-R-0039Closes in 20 daysDec 17
All 8 open in other guided missile and space vehicle parts and auxiliary equipment manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336419 (other guided missile and space vehicle parts and auxiliary equipment manufacturing), means no more than 1,050 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of September 19, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Government is conducting market research to identify potential sources that possess the expertise, capabilities, and experience to meet the requirements for the remanufacture effort for the EAC, part number 2117580-2-1 and NSN 1420-01-098-5936. The Flight Control Servo Assembly (FCSA) consists of two identical linear actuators, driven by a common electronic control unit, the Elevon Actuator Controller (EAC). The controller consists of circuits to perform actuator position signal summing, error signal amplification, servo loop compensation, and power drive stages for the servo motors, current limiting, and buffer circuits to output position, motor current monitor signals and motor voltage monitor signals. The EAC accepts analog voltage inputs proportional to the elevon position command, 28 VDC power, and +- 15 VDC power. The 28 vdc and +- 15 dc grounds are isolated outside of the servo assembly. The FCSA controls the elevon which guides the missile to its intended target. The purpose of this remanufacture effort is to provide a full rate production effort of the remanufactured EACs that meets the original design requirements and all nuclear hardness requirements.
The contractor shall be capable of producing 550 remanufactured EACs with the work to include disassembly, cleaning, inspection, assembly, testing, troubleshooting, and root-cause failure analysis to return an unserviceable EAC to a serviceable or like-new condition.
The contractor shall be capable of furnishing all labor, materials, facilities, and equipment required to accomplish the remanufacture and all required testing to include functional testing and product reliability verification testing (PRVT). Specifically, the contractor shall be capable of producing EAC-specific test equipment to confirm each produced EAC’s conformance to the requirements of envelope drawing 232-11704. Additionally, the contractor may be responsible for supply chain management, logistics planning, long-lead time parts procurement, diminishing manufacturing sources, and material shortage issues.
Throughout this effort, the contractor shall be responsible for refining the remanufacturing procedures and test procedures for the EAC. The Contractor shall be responsible for maintaining configuration changes to the EAC down to the shop replaceable unit (SRU) and component level and updating the technical data package (TDP) accordingly.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- EAC Remanufacture_RFI Instructions.pdf193 KB, September 20, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 20, 2025
Sources sought
Due October 10, 2025 at 5:00 PM EDT. SAM.gov, notice ac894582fe164f5ea071a4977c0e71dc
2 revisions on SAM
- September 22, 2025: publish, sources sought
- September 20, 2025: publish, sources sought
September 22, 2025
Sources sought
Due October 10, 2025 at 5:00 PM EDT. SAM.gov, notice 8e991ae2dbca40f085e8b6a20a670535
2 revisions on SAM
- September 22, 2025: publish, sources sought
- September 20, 2025: publish, sources sought
Points of contact
- Natalie Stokelynatalie.stokely@us.af.mil9184293748